Loading...
CCR2008038-Dedication-Belle Chasse COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #038-2008 DEDICATION OF PUBLIC IMPROVEMENTS WITHIN PHASE ONE OF THE BELLE CHASSE SUBDIVISION DEVELOPMENT LOCATED WEST OF DURHAM DRIVE AND SOUTH OF MCSHANE DRIVE WHEREAS, Belle Chasse, LLC, hereafter called “DEVELOPER” has constructed the following public improvements: water main, storm sewer, curb and gutter and the binder course of asphalt pavement in Belle Chasse Parkway from Durham Drive to a point 1,500 feet west of Durham Drive, Stags Leap Court, and Broken Arrow Court at the following development: LEGAL DESCRIPTION FOR LANDS LYING TO THE WEST OF DURHAM DRIVE: All of Parcel 1 and Parcel 2 of Certified Survey Map No. 1524 together with unplatted lands, all of which are located in part of the Southeast Quarter (SE 1/4) of the Southwest Quarter (SW 1/4) and the Southwest Quarter (SW 1/4) of the Southeast Quarter (SE 1/4) of Section 11, Township 5 North, Range 20 East, in the City of Muskego, Waukesha County Wisconsin; being more particularly described as follows: Commencing at the Southwest corner of the Southeast Quarter (SE 1/4); thence North 01°06'07" West along the West line of the Southeast Quarter (SE 1/4) 25.00 feet to the point of beginning of the lands hereinafter to be described; thence North 87°50'16" East along a line parallel to and 25.00 feet North of the South line of the Southeast Quarter (SE 1/4) 1138.82 feet; thence North 47°24'44" West 200.06 feet to the beginning of a curve of radius 333.00 feet, the center of which lies to the East; thence Northerly along the arc of said curve 147.64 feet, the chord of which bears North 34°42'40" West 146.43 feet; thence South 87°50'16" West 197.38 feet; thence North 02°09'44" West 106.07 feet; thence North 87°50'16" East 175.83 feet; thence North 09°21'41" West 941.34 feet to the South line of Certified Survey Map No. 9347; thence South 87°48'47" West along the said South line 467.90 feet to the West line of said Certified Survey Map 9347; thence North 07°00'43" West along the said West line 1.55 feet to the South one sixteenth (S 1/16) line of the Southeast Quarter (SE 1/4); thence South 87°49'02" West along the said (S 1/16) line 286.25 feet to the South one quarter (S 1/4) line; thence South 87°58'00" West along the South one sixteenth (S 1/16) line of the Southwest Quarter (SW 1/4) 1313.27 feet to the East right-of-way line of Mystic Drive; thence South 01°07'40" East along the said right-of-way line 1301.95 feet; thence North 88°07'53" East along a line parallel to and 25.00 feet North of the South line of the Southwest Quarter (SW 1/4) 1312.62 feet to the point of beginning, containing 64.7969 Acres, WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Water Main 2145.7 LF at $45.00 /LF of 8” diameter pvc water main pipe 460.8 LF at $32.00/LF of 6” diameter pvc water main and hydrant lead pipe 11 EACH at $900.00 /EACH of 8” diameter butterfly valves with valve boxes 10 EACH at $700.00 /EACH of 6” diameter butterfly valves on hydrant lead pipe 9 EACH at $3,000.00/EACH of fire hydrants 1749.8 LF at $25.00 /LF of 1-1/4” diameter H.D.P.E. water service pipe 45 EACH at $280.00 /EACH of 1-1/4” diameter valves and valve boxes on service connections Storm Sewer 214.0 LF at $40.00 /LF of 12” diameter reinforced concrete storm sewer pipe 1099.2 LF at $42.00 /LF of 15” diameter reinforced concrete storm sewer pipe 1211.8 LF at $44.00/LF of 18” diameter reinforced concrete storm sewer pipe Reso. #038-2008 Page 2 390.9 LF at $46.00 /LF of 21” diameter reinforced concrete storm sewer pipe 598.9 LF at $48.00 /LF of 24” diameter reinforced concrete storm sewer pipe 533.3 LF at $50.00 /LF of 30” diameter reinforced concrete storm sewer pipe 878.5 LF at $18.00 /LF of 6” diameter pvc storm sewer laterals 974.0 LF at $18.00 /LF of 6” diameter pvc storm sewer pipe for clean-outs 10 EACH at $1,500.00 /EACH of concrete storm sewer manholes 1 EACH at $5,000.00 /EACH of reinforced concrete box structure 26 EACH at $568.00 /EACH of storm sewer catch basins 10 EACH at $600.00 /EACH of storm sewer end sections 6 EACH at $500.00 /EACH of storm sewer clean-outs and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY” and the City Engineer has certified the systems’ acceptability; and WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such utilities; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee. NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication of the public improvements within the Belle Chasse Subdivision Phase One Development. TH DATED THIS 12 DAY of FEBRUARY , 2008 SPONSORED BY: FINANCE COMMITTEE Ald. Bob Melcher Ald. Neil Borgman Ald. Keith Werner This is to certify that this is a true and accurate copy of Resolution #038-2008 which was adopted by the Common Council of the City of Muskego. __________________________ Janice Moyer, Clerk-Treasurer