Loading...
PCR2026026 Inpro BSO AmendRESOLUTION #P.C. 026-2026 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR INPRO LOCATED IN THE NE'/4 OF SECTION 17 (S80 W18766 APOLLO DRIVE / TAX KEY NO. 2225.090) WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment for Inpro located in the NE '/ of Section 17 (S80 W18766 Apollo Drive / Tax Key No. 2225.090), and WHEREAS, The petitioner is proposing install two 64-foot silos along the north side of the building adjacent to the existing five smaller silos, and WHEREAS, The 2035 Plan depicts this property for industrial uses and this proposal is consistent with the Plan as the current use is already existing and approved for this site, and WHEREAS, The property is currently zoned PD-45 Inpro Planned Development District and the current use is consistent with the Code, and WHEREAS, Each of the small silos are able to hold two tanker loads of plastic pellets, while the new taller silos will accommodate more than three tanker loads of pellets, and WHEREAS, It appears as though the existing silos were expanded from two to five over the past nine years with two silos present in 2017, three in 2020, a fourth silo appeared between 2022 and 2024 and the fifth silo since 2024, and WHEREAS, The two original silos have an 'Inpro'-blue colored stripe along the base of the silo while the three newer silos are all white and the proposal is to have the two new silos be all white to match the building, and WHEREAS, There are no changes to the parking area or drive aisles with the proposed silo additions. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operation Plan amendment for Inpro located in the NE '/4 of Section 14 (S80 W18766 Apollo Drive / Tax Key No. 2225.090). BE IT FURTHER RESOLVED, A Building or Zoning Permit will need to be submitted to formally permit the improvements. BE IT FURTHER RESOLVED, All of the silos must be painted white to be consistent. BE IT FURTHER RESOLVED, That the exterior doors at the bottom of the silos be painted to match the silos and walls. BE IT FURTHER RESOLVED, As part of the Building or Zoning Permit for the new silos, the petitioner must submit a stamped site plan or survey identifying the exact dimensions of the silos and showing the drive aisle being a minimum of 24 feet in width. BE IT FURTHER RESOLVED, There are plans for a possible future third silo of the same size that can be also installed as part of this approval, if its installed within the duration of this BSO approval, which is two years, and as long as a separate building permit is first approved. BE IT FURTHER RESOLVED, That any new/replaced roof top, wall mounted and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view from all sides and said screening must be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, louvers, vents, etc. must be painted to match the colors of the existing bollards and match the color scheme of the building. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $124 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: April 8, 2026 Defeated: Deferred: Introduced: April 8, 2026 ATTEST: Adam Trzebiatowski AICP, Planning Manager