PCR2025039 Jacksons BSO AmendRESOLUTION #P.C. 039-2025 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR JACKSON'S LOCATED IN THE NW '/4 OF SECTION 2 (S64 W15591 COMMERCE CENTER PARKWAY / TAX KEY NO. 2166.997.008) WHEREAS, A submittal was received for a Building, Site and Operation (BSO) Plan amendment for Jackson's located in the NW '/ of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008), and WHEREAS, The petitioner is proposing to construct a 3,071 square foot addition to the south side of the existing building for space to store fresh and used avocado oil used in the production of chips, and WHEREAS, The building expansion is located on the south side of the existing building where the existing landscape island and loading docks are currently located and will extend 83 feet from the back of the building and be 37 feet wide and 40 feet in height, and WHEREAS, The exterior of the addition will be an identical match to the existing building utilizing the precast concrete panels with colors and reveals aligned, and WHEREAS, On the southern side of the addition an overhead door will allow access to the addition and a new service door to the outside will be cut into the existing wall east of the addition to for pedestrian entry, and WHEREAS, With the building addition extending 83 feet into the parking area, there is still approximately 43 feet of drive aisle before the parking spaces exceeding the 24 feet minimum requirement for a two-way drive aisle, and WHEREAS, There are a series of bollards surrounding the building addition that are planned as a safety yellow color that will need to be changed to match the color of the existing bollards, and WHEREAS, There are no other changes to the parking area proposed with the building addition project. THEREFORE BE IT RESOLVED, That the Plan Commission approves a Building, Site and Operation Plan amendment for Jackson's. located in the NW '/4 of Section 2 (S64 W15591 Commerce Center Parkway / Tax Key No. 2166.997.008). BE IT FURTHER RESOLVED, A Building Permit will need to be submitted to formally permit the building addition and site improvements. BE IT FURTHER RESOLVED, That the exterior overhead door and service door match the colors of the existing overhead and service doors. BE IT FURTHER RESOLVED, That any new/replaced roof top, wall mounted and ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view from all sides and said screening must be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, That any bollards, railings, ladders, louvers, vents, etc. must be painted to match the colors of the existing bollards and match the color scheme of the building. BE IT FURTHER RESOLVED, That the exterior overhead door and service door match the colors of the existing overhead and service doors. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: September 2, 2025 Defeated: Deferred: Introduced: September 2, 2025 ATTEST: Adam Trzebiatowski AICP, Planning Manager