CCR2025.041-Dedication of Pub Impr (Peach Tree)COMMON COUNCIL — CITY OF MUSKEGO
RESOLUTION #041-2025
DEDICATION OF PUBLIC IMPROVEMENTS
FOR TWIN SILOS
WHEREAS TWIN SILOS, hereafter called "DEVELOPER" has constructed public improvements in and
around TWIN SILOS site; including all sanitary sewer facilities, storm sewer facilities, and roadway
pavement, including any and all equipment and appurtenances which may in any way be a part thereof
or pertain to, in and for TWIN SILOS; and
WHEREAS, the DEVELOPER has completed the construction and installation of the following
improvements:
Storm Sewer
525 LF at $57.20/LF of 6" PVC Storm Sewer
$30,030.00
81 LF at $66.30/LF of 12" HDPE Storm Sewer
$5,370.30
30 LF at $79.56/LF of 15" HDPE Storm Sewer
$2,386.80
645 LF at $81.60/LF of 18" HDPE Storm Sewer
$52,632.00
1 Each at $1,530.00/Each of 18" HDPE End Section with Rip -Rap
$1,530.00
6 Each at $4,080.00/Each of Inlet Structures
$24,480.00
4 Each at $2,550.00/Each of Integrate Storm Manhole Frame and Grate
$10,200.00
Total — Storm Sewer $126,629.10
Sanitary Sewer
6 Each at $5,250.00/Each of 48" Sanitary Manhole $31,500.00
1,048 LF at $176.50/LF of 8" PVC Sanitary Sewer $184,972.00
551 LF at $115.50/LF of 6" PVC Sanitary Lateral $63,640.50
Total — Sanitary Sewer $280,112.50
Paving
3,845 SY at $5.15/SY of 1-1/4-inch Aggregate Base Course (4"depth)
$19,801.75
3,845 SY at $5.15/SY of 3/4-inch Aggregate Base Course (4"depth)
$19,801.75
1,445 LF at $21.50/LF of 30" Mountable Curb and Gutter
$31,067.50
240 LF at $44.90/LF of 30" Vertical Curb and Gutter
$10,776.00
2,981 SY at $22.90/SY of 4-Inch Binder Asphalt Course
$68,264.90
112 SY at $33.70/SY of Asphalt Path
$3,774.40
2 Each at $2,856.00/Each of Sidewalk Ramps w/ Detectable Warning Field
$5,712.00
Total — Paving (Not including Final Lift of Asphalt)
$159,198.30
Resolution #041-2025
Page 1 2
and appurtenances (collectively called "IMPROVEMENTS") in accordance with the provision of Chapter
392 of the Municipal Code of the City of Muskego, hereafter called the "CITY", and the City Engineer
has certified the systems' acceptability; and
WHEREAS, it is the Developer's intent to, without charge to the CITY, unconditionally give, grant,
convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and
together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate
directly to the utilization of such IMPROVEMENTS; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any
defects due to faulty materials or workmanship which appear within a period of one (1) year from the
date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall
indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising
out of the alleged defects or other failure of this guarantee; and
NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the
recommendation of the Finance Committee, does hereby accept dedication and acceptance of the
public improvements in and for TWIN SILOS Development.
DATED THIS 22nd DAY OF JULY 2025
SPONORED BY:
FINANCE COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #041-2025 which was adopted by
the Common Council of the City of Muskego.
Kerri Roller, City Clerk