Chapter 290 Sewers with Amendments Per Ordinace #1502City of Muskego, WI
§ 290-1.
§ 290-2.
§ 290-3.
§ 290-4.
§ 290-5.
§ 290-6.
§ 290-7.
§ 290-8.
§ 290-9.
§ 290-10.
§ 290-11.
§ 290-12.
Chapter 290
SEWERS
Utility created.
Management of Utility.
Applicability.
Sewer service areas.
Definitions.
Rules and regulations.
Sewer service charges,
connection charges and reserve
capacity assessments.
Annual budget; payment of
charges.
Accounts and funds.
Prohibited discharges.
Accidental discharges.
Pretreatment facilities.
§ 290-13.
Grease, oil and sand
interceptors.
§ 290-14.
Wastewater measurement and
sampling.
§ 290-15.
Industrial waste analysis.
§ 290-16.
Wastewater discharge permit
system.
§ 290-17.
Admission to property.
§ 290-18.
Confidentiality of critical
information.
§ 290-19. Violations and penalties.
§ 290-20. Milwaukee Metropolitan Sewer
District regulations.
§ 290-21. Sewer extension permit in
Milwaukee Metropolitan Sewer
District contract area.
[HISTORY: Adopted by the Common Council of the City of Muskego 8-17-2000 by Ord. No. 1035
(Ch. 21 of the 1964 Code). Amendments noted where applicable.]
Plumbing Code — See Ch.164, Art. III.
Stormwater management — See Ch. 309.
GENERAL REFERENCES
Water — See Ch. 355.
Land division — See Ch. 392.
§ 290-1. Utility created. [Amended 5-22-2003 by Ord. No. 11381
The Common Council of the City of Muskego, pursuant to the provision of § 66.0621(1)(b), Wis. Stats.,
does hereby declare the City of Muskego owned sewerage system, collection system (as hereinafter
defined), waste collection and disposal operations, and all other appurtenances and equipment for such
purposes a public utility as of the date of this chapter.
§ 290-2. Management of Utility.
A. The operation, management and control of the Utility is hereby vested in the Common Council of the
City of Muskego pursuant to the provisions of § 66.0621(1), Wis. Stats., and hereinafter referred to as
the "approving authority." All records of the Utility shall be kept by the Clerk -Treasurer and Public
Works and Development Director or designee in the City Hall or other officially designated place.
[Amended 5-22-2003 by Ord. No. 113811
1. Editor's Note: Amended at time of adoption of Code (see Ch.1, General Provisions, Art. In.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-2 MUSKEGO CODE § 290-5
B. The rules, regulations and rates hereinafter set forth shall be considered part of the contract with every
individual or entity connected to the sewerage system. Said rules, regulations and rates may be
changed from time to time as determined by the Common Council, and the right is reserved to make
special rates and contracts in all proper cases.
C. The Common Council shall cause an annual audit of the books of the Utility to be made by a private
firm of certified public accountants and shall make the books and records relating to the Utility
available for inspection during regular business hours.
§ 290-3. Applicability.'
This chapter, its rules, regulations and rates shall apply to all individuals, firms, corporations and institutions
residing within the corporate limits of the City of Muskego or its sewer service area and any person, firm
or corporation by attachment or otherwise coming in to locate within the City of Muskego subsequent to
the effective date hereof.
§ 290-4. Sewer service areas. [Added 5-22-2003 by Ord. No. 11381
The areas to be served by the City of Muskego Sewer Utility shall include all areas within the corporate
limits of the City of Muskego within the sewer service area of the Milwaukee Metropolitan Sewerage
District (MMSD) or Norway Sanitary Sewer District, as that may be amended from time to time, and such
areas beyond the corporate limits of the City as hereinafter identified. The Muskego Utility shall have
no obligation to serve any area outside the incorporated limits of the City beyond the areas hereinafter
identified, and by this chapter the City of Muskego expressly affirms its policy that it is unwilling to serve
any areas beyond the corporate limits of the City, other than those expressly identified herein:
A. The areas identified in the amendment to the Agreement Creating the Linnie Lac Sanitary Sewer
District by and between the City of Muskego and the City of New Berlin adopted by Resolution No.
237-2000 and any subsequent amendments to said Agreement by resolution of the Common Council.
§ 290-5. Definitions.
The meaning of terms used in this chapter shall be as follows:
ACT — The Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.) as amended by the Federal
Water Pollution Control Act Amendments of 1972 (Pub. L. 92-500 and Pub. L. 93-243) or modified by Ch.
283, Wis. Stats., or appropriate section of the Wisconsin Administrative Code adopted pursuant to Ch. 283,
Wis. Stats.
APPROVING AUTHORITY — The Common Council of the City of Muskego or its duly authorized
deputy, agent or representative.
BOD — The quantity of oxygen, expressed in milligrams per liter (mg/1), utilized in the biochemical
oxidation of organic matter under standard laboratory conditions for five days at a temperature of 20'
centigrade. The laboratory determination shall be made in accordance with procedures set forth in Standard
Methods.
BUILDING SEWER, LATERAL or SERVICE PIPE — A sewer that carries only sewage and industrial
wastes from the building plumbing to the public sanitary sewer. This pipe shall also be defined as one
connection per pipe.
2. Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art.11).
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-5 SEWERS
CITY The City of Muskego.
§ 290-5
COLLECTION SYSTEM — The system of sewers and appurtenances for the collection, transportation and
pumping of domestic wastewater and industrial waste.
COMMERCIAL — Multifamily dwelling units consisting of three or more dwelling units and all other uses
not defined as residential, condominium or industrial users.
CONDOMINIUM — A residential dwelling unit that may consist of a single-family unit, duplex units or
multifamily buildings of three or more units with a sewer connection that may be used individually or in
common with other condominium units.
CONNECTION CHARGE — A charge levied on users for each lateral connected to the sewerage system.
The revenues generated from the connection charge shall be used to cover the cost of infiltration and inflow.
CONSUMPTION CHARGE A charge levied on users to recover the component of total operation,
maintenance and capital costs of the sewerage system that relates to wastewater flow caused by users of the
sewerage system. The consumption charge shall consist of a charge in terms of dollars per 1,000 gallons of
flow.
DEBT RETIREMENT — All annual principal and interest requirements and obligations of the City for the
sewerage system, including capital charges.
DEDUCT METER — A water meter installed on fixtures in a building that does not discharge to the
sanitary sewer and is used to determine a deduction from the main water meter for sewer usage billing
purposes. [Added 8-22-2002 by Ord. No. 1113]
DOMESTIC WASTEWATER — Waterborne waste normally being discharged from the sanitary
conveniences of dwellings, apartment houses, hotels, office buildings, factories and institutions, free of
industrial waste and in which the average concentration of suspended solids is established at 320 mg/1 and
a BOD is established at 255 mg/l.
FLOW PROPORTIONAL COMPOSITE SAMPLE — A sample consisting of portions of waste taken in
proportion to the volume of flow of said wastes.
INDUSTRIAL USER
A. Any nongovernmental, nonresidential user of the sewerage system that discharges more than the
equivalent of 1,000 gallons per day (gpd) of sanitary wastes and whose activities are identified
in the Standard Industrial Classification Manual, 1972, Office of Management and Budget, as
amended and supplemented, under the following divisions:
(1) Division A: Agriculture, Forestry and Fishing.
(2) Division B: Mining.
(3) Division D: Manufacturing.
(4) Division E: Transportation, Communications, Electric, Gas and Sanitary Services.
(5) Division I: Services.
B. In determining if a user is in the industrial classification, the City may exclude domestic wastes
or discharges from sanitary conveniences. After applying the sanitary waste exclusion,
discharges in the above divisions that have a volume exceeding 1,000 gpd or the weight
of biochemical oxygen demand (BOD) or suspended solids (SS) equivalent to that weight
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-5 MUSKEGO CODE § 290-5
found in 1,000 gpd of sanitary waste are considered industrial users. Sanitary wastes, for
purposes of this calculation of equivalency, are the waste discharges from residential users. Any
nongovernmental user of the sewerage system that discharges wastewater to the sewerage system
that contains toxic pollutants or poisonous solids, liquids or gases in sufficient quantity, either
singly or by interaction with other waste, to contaminate the sludge of any municipal system or
to injure or to interfere with any sewage treatment process, or that constitute a hazard to humans
or animals, create a public nuisance, or create any hazard in or have an adverse effect on the waters
receiving any discharge from the treatment works, shall be an industrial user, even if it does not
discharge the equivalent of 1,000 gallons per day of sanitary waste.
INDUSTRIAL WASTE — Any waterborne solids, liquids or gaseous wastes, other than domestic
wastewater, resulting from, discharging from, flowing from or escaping from any commercial, industrial,
manufacturing or food processing operation or process or from the development of any natural resource, or
any mixture of these with water or domestic wastewater.
INTERCEPTING SEWER A sewer constructed to receive the dry weather flow of untreated or
inadequately treated wastewater from one or more existing sanitary system terminals, other than from a
dwelling or building that presently discharges or formerly discharged flow directly into any waters of the
state, and convey the flow to a treatment works, or is to serve in lieu of an existing or proposed treatment
works.
NATURAL OUTLET — Any outlet into a watercourse, pond, ditch, lake or other body of surface water or
groundwater.
NORMAL SEWAGE — Wastewater in which BOD or suspended solids concentrations do not exceed
normal concentrations of.'
A. A five-day 20' C. BOD of not more than 200 parts per million.
B. A suspended solids concentration of not more than 250 parts per million.
OPERATION AND MAINTENANCE COST — The actual sums spent by the Utility in the operation and
maintenance of its sewerage system, consisting of, but not limited to, each and all of the following purposes:
A. Wages and salaries and employee -related expenses of operating, maintenance, clerical,
laboratory and supervisory personnel, together with fringe benefits and premiums paid on such
wages and salaries for the State of Wisconsin workers' compensation coverage.
B. Electrical power.
C. Chemicals, fuel and other operating supplies.
D. Repairs to and maintenance of the equipment associated therewith.
E. Premiums for hazard insurance.
F. Premiums for insurance providing coverage against liability for the injury to person and/or
property.
G. Rents and leasing costs.
H. Operation, licensing and maintenance costs for trucks and heavy equipment.
3. Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art.11).
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-5 SEWERS § 290-5
I. Consultant and legal fees.
Replacement.
K. Operation, maintenance and capital costs charged to the City of Muskego by the Milwaukee
Metropolitan Sewerage District (MMSD) or the Town of Norway Sanitary District No. 1.
PERSON — Any and all persons, natural or artificial, including any individual, firm, company, municipal
or private corporation, association, governmental agency or other entity and agents, servants or employees.
pH — The logarithm (base 10) of the reciprocal of the hydrogen ion concentration expressed in moles per
liter. It shall be determined by one of the procedures outlined in Standard Methods.
PUBLIC SEWER — A sewer in which all owners or abutting properties have equal rights and which is
controlled or owned by public authority.
REPLACEMENT Expenditures for obtaining and installing equipment, accessories and appurtenances
that are necessary during the useful life of the treatment works to maintain the capacity and performance
for which such works were designed and constructed.
RESIDENTIAL All condominiums, single-family or two-family (duplex) dwelling units. Multifamily
or multiunit buildings consisting of three or more dwelling units shall be classified as commercial.
Multifamily dwelling buildings of three or more units that consist of condominiums shall be classified as
residential.
RESIDENTIAL EQUIVALENT CONNECTION (REC) — The amount of normal wastewater discharged
(base flow) by one average household. For user charge billings, the base flow associated with one residential
equivalent connection shall be computed by multiplying the City occupancy factor, as described in the
current volume of the Milwaukee Metropolitan Sewerage District (MMSD) Cost Recovery Procedures
Manual, times the gallons per capita per day factor established yearly by MMSD. Commercial lands shall
be estimated at 4.81 RECs per acre and industrial lands shall be estimated at 9.63 RECs per acre until the
lands are developed and actual flows can be established.
SANITARY SEWER — A sewer that conveys domestic wastewater or industrial waste or a combination
of both and into which stormwater, surface water and groundwater or unpolluted industrial wastewater is
not intentionally passed.
SEWERAGE SYSTEM All facilities for the collection, transporting, and pumping of waste and
wastewater. Also may be referred to as "sewer system."
SEWER SERVICE CHARGES — Charges to users of the sewerage system. Sewer service charges may
include connection charges, consumption charges, ready to serve charges, and other charges as deemed
necessary by the approving authority so as to assure that each user of the sewerage system pays its
proportionate share of the cost of such facilities.
SLUG Any discharge of water or wastewater which in concentration of any given constituent or in
quantity of flow exceeds for any period longer than 15 minutes more than five times the average twenty-
four -hour concentration or flows during normal operation and shall adversely affect the collection system
and/or performance of the wastewater treatment works.
STANDARD METHODS The methods and procedures set forth in the latest edition of Standard
Methods for the Examination of Water and Wastewater as prepared, approved and published by the
American Public Health Association, American Water Works Association and the Water Environment
Federation.
STORM SEWER A sewer that carries storm and surface drainage but excludes domestic wastewater
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, Wl
§ 290-5 MUSKEGO CODE § 290-6
and industrial wastes.'
SUSPENDED SOLIDS — Solids that either float on the surface of or are in suspension in water, sewage
or other liquids and which are removable by a laboratory filtration device. Quantitative determination of
suspended solids shall be made in accordance with procedures set forth in Standard Methods.
UNPOLLUTED WATER — Water of quality equal to or better than the effluent criteria in effect or water
that would not cause violation of receiving water quality standards and would not be benefited by discharge
to the sanitary sewers and wastewater treatment facilities provided.
USER — Any person discharging domestic wastewater or industrial wastes into the collection system.
UTILITY — The City of Muskego Sewer Utility established by this chapter.
WASTE — Any solid, liquid or gaseous material or combination thereof discharged from any residences,
business buildings, institutions and industrial establishments into the collection system or storm sewer.
WASTEWATER A combination of the water -carried waste discharges into the collection system from
residences, business buildings, institutions and industrial establishments, together with such groundwater,
surface water and stormwater as may be present.
WASTEWATER PUMPING STATION — A pumping facility utilized to pump wastewater within the
collection system.
WASTEWATER TREATMENT FACILITIES — Any facilities, devices and structures used for receiving
and treating wastewater from the Utility collection system.
WPDES PERMIT A permit to discharge pollutants obtained under the Wisconsin Pollutant Discharge
Elimination System (WPDES) pursuant to Ch. 283, Wis. Stats.
§ 290-6. Rules and regulations.
A. Declaration of policy. The Common Council of the City of Muskego finds and declares that the public
health, comfort and safety are preserved and enhanced by the provisions of the sewerage system in
the promotion of a clean and healthful environment and that the failure to connect to the sewerage
system is contrary to minimum health standards.
B. Connections.
(1) To assure preservation of public health, comfort and safety, the owner of any houses, buildings
or properties used for human occupancy, employment, recreation, or other habitations, situated
within the City and adjacent to a public sewer or in a block through which a public sewer extends,
is hereby required at his expense to install suitable toilet facilities therein and to connect such
facilities directly with the proper public sewer in accordance with the provisions of this chapter
within nine months after the public sewer first becomes operational or, if an immediate health
hazard exists, within 30 days upon receipt of notice from the Health Officer or City Building
Inspector.
(2) Prior to any person or entity applying for a sanitary permit to allow for a private sewerage system,
all such persons or entities making such application shall apply for a determination from the City
that public sewer is not available. Upon determination of sewer being unavailable, application
for permit will be allowed. [Amended 12-7-2000 by Ord. No. 1049]
4. Editor's Note: The definition of "Superintendent" which immediately followed this definition was repealed at time of adoption of
Code (see Ch. 1, General Provisions, Art. I1).
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-6 SEWERS § 290-6
(3) If a person fails to comply with said notice to connect within the given period of time the City
may, at its option:
(a) Cause such connection to be made and bill the property owner for such costs. If such costs
are not paid within 30 days, such costs shall be assessed as a special tax lien against the
property, unless the owner within 30 days after the completion of the work files a written
option with the City Clerk -Treasurer stating that he cannot pay such amount in one sum
and asking that it be levied in not to exceed five equal annual installments, and the amount
shall be so collected with interest at the rate of 9% per annum from the completion of the
work, the unpaid balance to be a special tax lien; or
(b) Impose a standby charge for the period that such failure continues after 10 days' written
notice to any owner failing to make a connection to the sewerage system of an amount
equal to 100% of the total charges calculated pursuant to § 290-7B and C, payable monthly
for the period in which the failure to connect continues, and upon failure to make such a
payment, said charge shall be levied as a tax against the lot or parcel to which sewer service
was furnished.
C. Alternative disposal prohibited.
(1) No person shall construct or maintain any privy vault, septic tank, cesspool or other facility
intended to be used for the disposal of domestic wastewater, if a public sewer is available.
(2) No person shall discharge to any natural outlet within the City or in any area under the
jurisdiction of the City wastewater or other polluted waters, except where suitable treatment has
been provided in accordance with subsequent provisions of this chapter.
D. Plumbers. No plumber, pipe fitter, or other persons will be permitted to do any plumbing or pipe
fitting work in connection with the sewerage system without first receiving a license from the State
of Wisconsin. If the work is performed by or under the direction of the City, and is on property subject
to easement for highway or street purposes or public service right-of-way, this requirement is not
applicable.
E. Maintenance of services. All sewer services within the limits of the City from the street main to the
property line, and including all controls between the same, shall be maintained and repaired without
expense to the property owner except when they are damaged as a result of negligence or carelessness
on the part of the property owner, in which case they will be repaired at the expense of the property
owner. All building sewers and all facilities throughout the premises served must be maintained free
of defective conditions by and at the expense of the owner or occupant of the property served. If any
repairs are made by the City, the City will issue a statement for the expenses of the repairs to the
property owner who shall pay said statement within 30 days of receipt. Failure to pay shall result in
the charges being placed on the tax roll as a special charge under § 66.0627, Wis. Stats.
F. Users.
(1) Application for service.
(a) Every person requesting connection to the sewerage system shall file an application in
writing to the Utility, in such form as is prescribed for that purpose. Blanks for such
applications will be furnished at the office of the City Clerk -Treasurer. The application
must state fully and truly all the use that will be presently made. If any change in use from
that set forth in this application is contemplated, the user must obtain further application
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-6 MUSKEGO CODE § 290-6
and permission from the Utility. If the applicant is not the owner of the premises, the
written consent of the owner must accompany the application.
(b) The application may be for service to more than one building, or more than one unit of
service through one service connection, and, in such case, charges shall be made
accordingly.
(c) If it appears that the service applied for will not provide adequate service for the
contemplated use, the Utility may reject the application. If the Utility approves the
application, it shall issue a permit for services as shown on the application.
(d) All expenses relating to the connection to the sewerage system shall be paid by the
applicant or owner.
(2) Tap permits. After sewer connections have been introduced into any building or upon any
premises, no plumber shall make any alterations, extensions, or attachments, unless the party
ordering such tapping or other work shall obtain and exhibit the proper permit for the same from
the Utility.
(3) User to keep in repair. All users shall keep their own service pipe in good repair and protected
from frost, at their own risk and expense, and shall prevent any unnecessary overburdening of
the sewerage system. [Amended 3-20-2003 by Ord. No. 11351
(4) User use only. No user shall allow other persons to connect to, or permit other uses to be made
of, the sewerage system through its lateral.
(5) User to permit inspection. Every user shall permit the City or its duly authorized agent, at all
reasonable hours of the day, to enter its premises or building to examine the pipes and fixtures
and the manner in which the drains and sewer connections operate and must at all times, frankly
and without concealment, answer all questions put to it relative to its use.
(6) Responsibility. No claim shall be made against the City or its agents or employees by reason of
the breaking, clogging, stoppage or freezing of any service pipe, nor from any damage arising
from repairing mains, making connections or extensions or any other work that may be deemed
necessary by the City, absent gross negligence of the City, its agents or employees. The City
may cut off the service at any time for the purpose of repairs or any other necessary purpose, any
permit granted or regulation to the contrary notwithstanding. Whenever it shall become
necessary to shut off the sewer service within any areas of the City, the City shall, if practicable,
give notice to each affected user.
G. Excavations.
(1) In making excavations in streets or highways for laying service pipe or making repairs, the
paving and earth moved must be deposited in a manner that will occasion the least inconvenience
to the public.
(2) No person shall leave any such excavation made in any street or highway open at any time
without barricades, and during the night warning lights must be maintained at such excavations.
(3) All services within the public right-of-way shall have their trenches backfilled with materials as
approved by the Public Works and Development Director or designee, and this work, together
with the replacing of sidewalks and paving, must be done so as to make the street as good, at
least, as before it was disturbed, and satisfactory to the City.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-6 SEWERS § 290-7
H. Laterals.
(1) All laterals on private property will be installed in accordance with Ch. SPS 382, Wis. Adm.
Code, as from time to time amended.
(2) The building sewer shall be inspected by the City Plumbing Inspector or his designee upon
completion of placement of the pipe and before backfilling and tested before and after
backfilling.
I. Tapping the mains.
(1) No persons, except those having special permission from the City or persons in their service and
approved by them, will be permitted under any circumstances to tap the public sanitary sewers.
The kind and size of the connection with the public sanitary sewers shall be that specified in the
permit or order from the City.
(2) Pipes should always be tapped at the top, and not within six inches (15 centimeters) of the joint,
or within 24 inches (60 centimeters) of another lateral connection.
(3) When any lateral is to be relaid and there are two or more parcels connected to the lateral, all but
one of the parcels shall be disconnected from such lateral and new laterals shall be installed for
the remaining parcels.
Metering.
(1) All industrial, commercial and multifamily users (consisting of three or more units) shall be
required to install metering devices as further described at § 290-14 of this chapter at the user's
expense by December 31, 2000. This metering requirement shall apply to all water systems,
including but not limited to private, community, and public water systems.
(2) Metered users, as described in Subsection J(1), may install, at their expense, a deduct meter per
§ 290-14 to measure water not entering the sanitary sewer system. The total from this meter shall
be subtracted from the main water meter for sewer usage billing purposes. [Added 8-22-
2002 by Ord. No. 1113]
§ 290-7. Sewer service charges, connection charges and reserve capacity assessments.
A. General.
(1) It shall be the policy of the Utility to establish sewer service charges in such amount as to obtain
sufficient revenues to pay the following costs:
(a) Operation and maintenance, including contributions to a replacement fund.
(b) Debt service, including debt service reserves and coverage requirements.
(2) Those aspects of sewer service charges relating to operation, maintenance and replacement fund
shall be in accord with any relevant and applicable requirements imposed by the Wisconsin
Department of Natural Resources or by federal law.
(3) The Utility may establish sewer service charges, including connection charges, consumption
charges, ready to serve charges and other charges, as deemed necessary by the approving
authority so as to assure that each user of the sewerage system pays its proportionate share of
the cost of such facilities.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-7 MUSKEGO CODE § 290-7
(4) A review of the user charge system shall be conducted on an annual basis. This review shall
include an analysis of the total costs of the system and of wastewater contribution of users and
user classes.
(5) The charges established hereunder will be developed using a utility rate making method that
includes recovery of operation and maintenance costs plus depreciation, amortization and a
return on investment. The computation of revenue requirements for rate making purposes will
include reductions for City subsidies, other revenues and operating reserves.
B. Consumption charge. A consumption charge is hereby imposed upon all users of the sewerage system.
The consumption charge will recover the component of total operation, maintenance and capital costs
of the sewerage system that relates to sewage flow attributable to users of the system. The
consumption charge shall consist of a charge in terms of dollars per 1,000 gallons. The consumption
charge shall be based upon metered water usage or an assigned residential equivalent connection
(REC) value. All single-family residences or stand alone or detached condominiums shall be assigned
an REC value of one. For all users other than single-family residences, stand alone or detached
condominiums, duplexes or duplex condominiums, the consumption charge shall be based upon
metered water usage. For all users that do not have water meters installed, other than single- family
residences or stand alone or detached condominiums, the consumption charge shall be based upon the
assigned REC value determined as follows: [Amended 4-4-2002 by Ord. No. 10981
Property Type
REC
Residential Properties
Duplex/condominium (3-bedroom unit, each side)
1.00
Duplex/condominium (2-bedroom unit, each side)
0.75
Duplex/condominium (1-bedroom or less unit, each side)
0.50
Single-family with mother-in-law (3-bedroom attachment)
2.00
Single-family with mother-in-law (2-bedroom attachment)
1.75
Single-family with mother-in-law (1-bedroom attachment)
1.50
Multifamily apartment/condominium (3-bedroom unit, each unit)
1.00
Multifamily apartment/condominium (2-bedroom unit, each unit)
0.75
Multifamily apartment/condominium (1-bedroom unit/less, each unit)
0.50
Commercial and Industrial Properties
See Note (1)
Note (1): Commercial and industrial properties:
REC values for all nonmetered properties shall be assigned based upon the methodology set
forth in the estimated volume of discharge section of the current volume of the Milwaukee
Metropolitan Sewerage District Cost Recovery and Procedures Manual as may be amended
from time to time.
All buildings shall be assigned a minimum value of one REC. Exception: In the case of a
business property with multiple buildings, the property shall be assessed a minimum of one
REC for the main building and an additional minimum 0.5 REC for each additional building
connected to sewer, if the property meets all of the following criteria:
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-7 SEWERS § 290-7
I. The property may not be able to be divided as determined by the Public Works and
Development Director or designee.
2. The property must be occupied by the same business for all of the buildings.
C. Connection charge. A connection charge is hereby imposed upon each user connected to the sewerage
system. The connection charge shall recover the cost of infiltration and inflow in the sewerage system.
The connection charge shall be levied on each lateral connection to the sewerage system and will
consist of a flat fee per connection. Laterals that have multiunit condominium dwellings connected to
them shall have the cost of the lateral connection divided proportionately to each of the users of the
lateral.
D. Special rates. It is understood that the approving authority may at any time hereafter set special rates
for certain users. Any user discharging wastewater other than domestic wastewater or any toxic
pollutants, wastewater or other wastes to the sewerage system shall pay for the increased operation,
maintenance and replacement costs caused by its discharge.
E. Industrial and commercial charges for other than domestic wastewater. Charges made for wastewater
and other than domestic wastewater shall be based on flow, BOD, suspended solids, phosphorous and
other such constituents that affect the cost of collection and treatment. All persons discharging waste
into the sewerage system are subject to a surcharge, in addition to any other sewer service charge, if
their wastewater has a concentration greater than domestic wastewater concentrations. The volume of
flow used for computing waste surcharges shall be the metered water consumption or the actual
volume of waste as determined by an industrial waste metering installation. The amount of surcharge
shall reflect the cost incurred by the City, the Town of Norway Sanitary District, and the Milwaukee
Metropolitan Sewerage District (MMSD) in removing BOD, suspended solids, phosphorous, and
other pertinent constituents. The total commercial and industrial service charges shall consist of the
actual surcharge from the MMSD or the Town of Norway Sanitary District No. 1 submitted to the
City of Muskego plus the connection charge and the consumption charge from the City.
F. Initial construction fee. For each new lateral or service connection there shall be charged a fee in an
amount as may be established by the Common Council from time to time by separate resolution. This
fee shall be paid to the City at the time of building permit or plumbing permit issuance.
G. Reserve capacity assessments. There is hereby levied and assessed upon each lot or parcel of land
currently within the City but not having an existing connection to the sewerage system and upon land
subsequently attached to the City a reserve capacity assessment (RCA). Such RCA charge shall be
payable as herein provided and shall be on the basis of one RCA charge for each residential equivalent
connection connected to the sewerage system. The number of residential equivalent connections shall
be calculated in accordance with Appendix A.5
(1) For the purpose of this chapter, sewer reserve capacity assessments in the City shall be classified
as existing users and future users. [Amended 5-28-2019 by Ord. No. 14291
(a) Existing users.
[1] Property owners whose improved lot has been connected to City sewer prior to
January 1, 1985, will pay a reserve capacity assessment of $250 per residential
equivalency connection.
5. Editor's Note: Appendix A is included as an attachment to this chapter.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-7 MUSKEGO CODE § 290-7
[2] Properties being served prior to public sewer connection by septic systems, mounds
and holding tanks will pay this assessment on or before November 1 in the year the
plumbing permit is obtained to connect to the sewer, except that if said permit is
obtained after November 1 in any calendar year, the assessment will be paid on or
before November 1 of the next calendar year. This assessment of $250 shall increase
by $22.50 per residential equivalency connection per year, commencing January 1,
1986.
(b) Future users.
[1] Properties where public sewer connection takes place or additional capacity is made
available after January 1, 1985, and which are not being served by a septic system,
mounds or holding tank will pay a reserve capacity assessment of $1,500 per
residential equivalency connection on or before November 1 of the year of connection
or the year when additional capacity is made available, except that if said connection
or additional capacity is made available after November 1 in any calendar year, the
assessment will be paid on or before November 1 of the next calendar year. This
reserve capacity assessment will increase by $135 each January 1 commencing on
January 1, 1986.
[2] The number of residential equivalency units for all categories of fixture users for
reserve capacity assessment purposes shall be determined upon final building
inspection, as a result of possible revisions made to the building by the developer
from the time of the issuance of the building permit to the time of final inspection,
which determination may be appealed to the City of Muskego Public Works and
Safety Committee within 60 days of said determination. All determinations of the
number of residential equivalency units shall take into consideration potential fixture
use and necessary capacity.
[3] Upon request, the City Engineer can provide an estimate at the time of issuance of a
building permit on the number of residential equivalency units for all categories of
fixture users for reserve capacity assessment purposes. This is an estimate only which
is not binding on the City and which developer shall rely on at its own risk.
(2) Installment payments.
(a) The assessments for those connecting to the City of Muskego sewerage system on or before
September 7, 1984, may be paid in cash in full on or before November 1, 1984, or in five
equal annual installments of principal together with 12 months' interest per installment at
the rate of 9% per annum on the unpaid balance commencing on November 1, 1984, and
said first installment being due on the date when real estate taxes are due and annually
thereafter. All assessments or installments which are not paid by the date specified shall be
extended upon the tax roll as a delinquent tax against the property, and all proceedings in
relation to the collection, return and sale of property for delinquent real estate taxes shall
apply to such special assessment, except as otherwise provided by statute. Existing users as
defined above who are not connected will be given the five installment method; provided,
however, that the first installment shall be due and payable on or before November 1 in the
year the plumbing permit is issued, except that if said permit is obtained after November 1
in any calendar year the assessment will be paid on or before November 1 of the next
calendar year. All annual installments due on the first day of November 1996 and thereafter
shall bear interest at the rate of 8% per annum on the same basis as stated
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-7 SEWERS § 290-8
above until further action of the Common Council.
(b) Future users may pay their assessment in five equal annual installments of principal
together with 12 months' interest per installment at the rate of 9% per annum commencing
on November 1 in the year of connection or in the year additional capacity is made
available, except if said connection or additional capacity is made available after November
1 in any calendar year, then commencing on November 1 of the next calendar year and said
first installment being due on the date when real estate taxes are due and annually
thereafter. All assessments or installments which are not paid by the date specified shall be
extended upon the tax roll as a delinquent tax against the property, and all proceedings in
relation to the collection, return and sale of property for delinquent real estate taxes shall
apply to such special assessment, except as otherwise provided by statute. All annual
installments due on the first day of November 1996 and thereafter shall bear interest at the
rate of 8% per annum on the same basis as stated above until further action of the Common
Council.
(3) RCA Annual Survey.
(a) The Utility Clerk shall issue a Reserve Capacity Assessment ("RCA") Survey on an annual
basis during the month of April. The survey shall be returned within sixty (60) days of the
date listed in the survey.
1. Any property owner/business owner who does not return the initial survey sent by the
Utility Clerk, shall be served by the City with a written Notice stating a second and final
request to provide the City with an accurate and updated survey within thirty (30) days of
the dated listed on the second and final request.
2. The City shall make a good faith effort to provide the survey to the applicable
individual(s) and/or properties within the City. Failure to receive a survey does not
excuse an individual and/or property from the duty to file a complete and accurate survey
with the City.
(b) Any property owner/business owner who shall fail to return the complete and accurate RCA
survey shall be deemed in violation of this Ordinance.
1. Any property owner/business owner in violation shall be subject to forfeiture in an
amount not exceeding $124.00. Any property owner/business owner violating any of the
provisions of this Section shall become liable to the City for any expense, loss or damage
incurred by the City by reason of such violation.
2. Each day in which any violation is continued beyond the date listed in the aforesaid
second Notice time limit shall be deemed a separate offense.
3. In addition to the Citation(s) issued for such violation(s), the Utility Clerk may adjust the
RCA of the property in violation on an estimated basis based on information, knowledge
and belief from his/her independent investigation.
4. Upon receipt of a complete and accurate RCA survey from the property owner/business
owner, and at the discretion of the Utility Clerk, the RCA may be re -adjusted to reflect
the updated and correct information.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-7 SEWERS § 290-9
H. Ready -to -serve charge. The owner of each premises to which sewer service has been provided by the
City but not connected to the sewerage system for sewer service where no indoor plumbing is available
shall pay for the availability thereof a ready -to -serve charge equal to the rate provided by Subsection
C. A ready -to -serve charge is not a standby charge and applies only to existing structures without
indoor plumbing. Any ready -to -serve charge becoming effective during any year shall be charged on
a pro rata basis for that year in which such charge becomes effective.
I. Vacant buildings.
(1) Any previously connected industrial building which is now vacant, or any commercial or
industrial building which is vacant due to initial construction, shall be assigned 1.0 REC for
purposes of consumption charges. Such REC assignment will become effective at the end of the
quarterly period in which such building becomes vacant if the owner, or the owner's agent,
notifies the City Clerk -Treasurer in writing of such vacancy and upon inspection thereof by the
City to determine that such building is vacant. The owner or the owner's agent shall pay a fee in
such amount as will be determined from time to time by resolution of the Common Council to
the City for such an inspection. The fee for said inspection shall be paid prior to the inspection
being made and is nonrefundable.
(2) It shall be the duty of the owner of any vacant commercial or industrial building to notify the
City Clerk -Treasurer in writing within five days from the date any such building, or any portion
thereof, is reoccupied. The sewer user charge for the quarter that any such building or any portion
thereof is reoccupied shall be prorated for such quarter.
(3) If such owner fails to notify the City Clerk -Treasurer of reoccupancy of said building or any
portion thereof as herein provided, then 200% of the sewer user charge shall be assessed against
said building until such notice is received. The notice to be given shall describe the premises and
uses involved and the date the premises is reoccupied.
§ 290-8. Annual budget; payment of charges.
A. On an annual basis and prior to December 1 of each year, the Finance and Administration Director
shall prepare a Sewer Utility budget. The budgeted expenditures shall be incorporated into the annual
sewer user rate review. The budgeted revenues shall be sufficient to cover projected operation,
maintenance and debt service costs of the Sewer Utility and any contributions to replacement or
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-8 MUSKEGO CODE § 290-
reserve accounts as may be deemed necessary.
B. Sewer service charges may be billed monthly, bimonthly or quarterly and will be billed in the period
after which services are received. Charges shall be payable at the City Clerk -Treasurer's office or at
any other officially designated location. Statements for such charges and assessments levied and
assessed in accordance with this chapter shall become due and payable within 30 days from and after
the date of the statement. In the event that any such statement or statements are not paid when due, a
penalty of 1% per month will be added thereto. [Amended 7-5-2001 by Ord. No. 1072]
C. Billing. The property owner is held responsible for all sewer bills on premises that he owns. All sewer
bills and notices of any nature, relative to the sewer service, will be addressed to the owner and/or
occupant and delivered to the addressee by first-class mail.
D. Failure to receive bill. Every reasonable care will be exercised in the proper delivery of sewer bills.
Failure to receive a sewer bill, however, shall not relieve any person of the responsibility for payment
of sewer rates within the prescribed period, nor exempt any person from any penalty imposed for
delinquency in the payment thereof.
E. Delinquent accounts.
(1) On or before October 1 of each year, the Sewer Utility shall furnish the City Clerk -Treasurer
with a listing of all lots or parcels for which utility charges are still owed for service provided in
the year preceding October 1.
(2) On October 15 in each year, the City Clerk -Treasurer shall give notice to the owner or occupant
of all lots or parcels of real estate for which payment is owed and in arrears at the time that the
notice is given. Such notice shall be in writing and shall state the amount of such arrears,
including any penalty assessed pursuant to the rules of the City. The notice shall also state that
unless such arrears, with any such added penalty, are paid by November 1, thereafter a penalty
of 10% of the amount of such arrears will be added thereto, and that unless such arrears, with
any such added penalty, shall be paid by November 15 thereafter, the same will be levied as a
tax against the lot or parcel of real estate to which utility service was furnished and for which
payment is delinquent. Such notice may be served by delivery to either such owner or occupant
personally or by letter addressed to such owner or occupant at the post office address of such lot
or parcel of real estate. Failure to serve or receive such notice, however, shall not relieve any
person of the responsibility for payment for services that have been furnished, nor exempt any
person from any penalty imposed for delinquency in the payment thereof, nor exempt the
property from imposition of a lien as provided herein.
(3) On November 16, the City Clerk -Treasurer shall certify and file a list of all lots or parcels of real
estate, giving the legal descriptions thereof, for which the owners or occupants were given notice
of arrears in payment as above specified and for which arrears still remain unpaid. The list shall
state the amount of such arrears together with the added penalty thereon as herein provided. Each
delinquent amount, including penalty, shall thereupon become a lien upon the lot or parcel of
real estate to which the service was furnished and payment is delinquent. The City Clerk -
Treasurer shall insert the same as a tax against such lot or parcel of real estate. All proceedings
in relation to the collection of general property taxes shall apply to said delinquent tax if the same
is not paid within the time required by law for payment of taxes upon real estate.
F. Charges for sewer usage shall begin on the date a residential, commercial, industrial or institutional
parcel or building is connected to the sanitary sewer.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-9 SEWERS
§ 290-9. Accounts and funds.
§ 290-10
A. Income and revenues derived by the Utility shall be accounted for separately and distinctly from the
City general fund.
B. A replacement reserve fund shall be maintained with the purpose of providing for the replacement of
mechanical equipment in order to maintain the capacity and performance for which the sewer system
facilities were designed. Other segregated funds (e.g., debt reserve, capital improvement fund) may
be established and maintained as necessary.
§ 290-10. Prohibited discharges.
A. No person shall discharge or cause to be discharged any stormwater, groundwater, roof runoff, yard
drainage, yard fountain, swimming pool or pond overflow into the collection system. Unpolluted
water or waste shall be discharged only to storm sewers or to a natural outlet.
B. No person shall discharge or cause to be discharged to the collection system either directly or
indirectly any of the following described wastes or wastewater:
(1) Any liquid having a temperature higher than 150" F. (65" C.).
(2) Any wax, grease or oil, plastic or any other substance that will solidify or become discernibly
viscous at temperatures between 32' and 150' F. (0' and 65' C.).
(3) Any solids, liquids or gases which by themselves or by interaction with other substances may
cause fire, explosion, or hazards, create toxic fumes or in any other way be injurious to persons
or property involved in the operation or maintenance of the sewerage system.
(4) Solid or viscous substances in quantities or of such size capable of causing obstruction to the
flow in sewers or other interference with the proper operation of the sewerage system, such as,
but not limited to, ashes, cinders, sand, mud, straw, shavings, metal, glass, rags, feathers, tar,
plastics, wood, unground garbage, whole blood, paunch manure, hair and fleshings, entrails,
paper dishes, cups, milk containers, etc., either whole or ground by garbage grinders.
(5) Any garbage that has not been properly comminuted or shredded to such a degree that all
particles will be carried freely in suspension in the municipal sewers (100% passing a one -half -
inch screen; 90% passing a one -fourth -inch screen).
(6) Any noxious or malodorous substance which either singly or by interaction with other substances
is capable of causing odors objectionable to persons of ordinary sensitivity.
(7) Any wastes or wastewater having a pH lower than 5.5 or higher than 9.0 or having any corrosive
property capable of causing damage or hazards to the sewerage system or personnel.
(8) Any wastes or wastewater of such character and quantity that unusual attention or expense is
required to handle it in the sewerage system.
(9) Any wastewater or wastes containing a toxic or poisonous substance, such as plating or heat
treating wastes, in sufficient quantity to injure or interfere with wastewater treatment process, to
constitute a hazard to humans or animals, to create any hazard in the sewerage system, or which
would cause the wastewater treatment facilities to discharge any of the following pollutants in
quantities in excess of the limitation as established in the Wisconsin Administrative Code or
WPDES permit: cyanide, hexavalent chromium, trivalent chromium, copper, nickel,
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-10 MUSKEGO CODE § 290-11
cadmium, phenols, iron and tin.
(10) Any radioactive wastes greater than allowable releases as specified by current National Institute
of Standards and Technology handbooks dealing with the handling and release of radioactivity.'
(11) Free or emulsified oil and grease exceeding on analysis an average of 100 mg/1 of either or both
or combinations of free or emulsified oil and grease if, in the opinion of the Public Works and
Development Director or designee, it appears probable that such wastes or wastewater:
(a) Can deposit grease or oil in the collection system in such manner to cause it to clog.
(b) Is not amenable to bacterial action and will therefore pass to the receiving waters without
being affected by normal wastewater treatment processes.
(c) Can have deleterious effects on the wastewater treatment process due to the excessive
quantities.
(12) Any cyanides or cyanogen compounds capable of liberating hydrocyanic gas or acidification in
excess of 0.5 mg/1 by weight as cyanide in the wastes.
(13) Wastes or wastewater that:
(a) Causes unusual concentrations of solids or composition, as, for example, in total suspended
solids of inert nature (such as fuller's earth) and/or in total dissolved solids (such as sodium
chloride or sodium sulfate).
(b) Causes excessive discoloration in the wastewater treatment facility's discharge.
(c) Has BOD in excess of 900 mg/l based upon a twenty -four-hour composite sample.
(d) Has a total BOD or suspended solids loading in excess of any wastewater discharge permit
described in § 290-16.
(e) Is discharged without application for a wastewater discharge permit or contractual
agreement as required under § 290-16.
(f) Causes damage to the collection system or impairs the treatment process.
C. No person shall allow the discharge of slugs of water or wastes to the collection system that may be
harmful to the operation of the sewerage system. Where, in the opinion of the Public Works and
Development Director or designee, slugging does occur, each person producing such a discharge into
the collection system shall construct and maintain, at its own expense, a storage reservoir of sufficient
capacity with flow control equipment to ensure an equalized discharge over a twenty -four-hour period.
D. No person shall discharge any waste or wastewater that would cause the wastewater treatment facility
to be in violation of any of the requirements of its WPDES permit.
E. No person shall connect to and discharge to the collection system unless there is capacity available in
all downstream components of the sewerage system as determined by the City Engineer.
6. Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art.11).
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-11 SEWERS
§ 290-11. Accidental discharges.
§ 290-14
Any person who accidentally discharges wastes or wastewater prohibited under § 290-10 shall immediately
report such discharge to the Public Works and Development Director or designee.
§ 290-12. Pretreatment facilities.
A. The approving authority may require pretreatment facilities of any person discharging or planning to
discharge industrial waste, if the waste or wastewater:
(1) Could cause damage to the collection system.
(2) Impairs the treatment process.
(3) Causes the City to incur treatment costs exceeding those of domestic wastewater.
(4) Has any of the characteristics of the prohibited discharges described in § 290-10 of this chapter.
(5) Causes the wastewater treatment facilities to exceed their total design loading for volume, BOD,
suspended solids or any pollutant.
B. Construction, operation and maintenance of pretreatment facilities shall be at the expense of the person
discharging the industrial waste.
C. Plans, specifications and any other pertinent information relating to proposed pretreatment facilities
shall be submitted for review of the Public Works and Development Director or designee and City
Engineer prior to the start of construction.
D. In accordance with Ch. NR 114, Wis. Adm. Code, all pretreatment facilities shall be operated by
qualified personnel holding a license of the proper class issued by the Wisconsin Department of
Natural Resources.
§ 290-13. Grease, oil and sand interceptors.
Grease, oil and sand interceptors shall be provided at repair garages, gasoline stations, car washes and other
industrial or commercial establishments for the proper handling of liquid wastes containing grease in
excessive amounts, oil, flammable wastes, sand and other harmful ingredients. All interceptors shall be
constructed in accordance with the Wisconsin Plumbing Code and shall be located as to be readily and
easily accessible for easy cleaning and inspection. All grease, oil and sand interceptors shall be maintained
by the owner, at its expense, in continuous, efficient operation at all times.
§ 290-14. Wastewater measurement and sampling.
A. Wastewater flows shall be assigned in accordance with the methodology set forth in the estimated
volume of discharge section of the current volume of the Milwaukee Metropolitan Sewerage District
Cost Recovery and Procedures Manual as may be amended from time to time, unless the City requires
or the owner of any lot, parcel of land, building or premises discharging domestic wastewater or
industrial waste into the sewerage system requests that the necessary metering equipment be installed
as approved by the Public Works and Development Director or designee to measure the quantity of
water pumped or discharged to the sewerage system.
B. Initial costs for metering equipment and installation shall be paid by the user if the user is not on
municipal water or if a deduct meter is installed. Municipal Water Utility customers will utilize the
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-14 MUSKEGO CODE § 290-16
reading from the meter provided by the Water Utility. The user charge shall be based on the quantity
of water so measured. Whenever the person fails to install such metering equipment, or where it is not
practicable to measure the water consumed on any premises by a meter or meters, the Public Works
and Development Director or designee shall determine the estimated volume of water discharged into
the sewerage system. [Amended 8-22-2002 by Ord. No. 11131
C. The user shall be required to verify the accuracy of the water metering equipment at the following
minimum intervals: (Note: For those on municipal water, the Water Utility tests the metering
equipment per the below schedule at no charge to the user.)
Water Meter Size Test interval
(inches) (years)
5/8, 3/4 and 1 10
1 1 /2 and 2 4
3 and 4 2
6 and over
D. Sewer discharge meters shall be tested and certified yearly. [Amended 8-22-2002 by Ord. No.1113]
E. Meter testing shall be performed by the Utility. [Amended 8-22-2002 by Ord. No. 11131
F. The Utility shall establish a yearly charge for testing, maintenance, repairs, and replacement, when
necessary, of meters. This charge will apply to all users not on municipal water or those that have
deduct meters. [Amended 8-22-2002 by Ord. No. 11131
G. The Public Works and Development Director or designee may require the installation of devices for
metering the volume of waste discharged if those volumes cannot otherwise be determined. The
metering devices shall be owned and maintained by the person and may not be removed without
consent of the Public Works and Development Director or designee.
H. Control manholes. All persons discharging industrial wastes into the sewerage system shall construct
and maintain control manholes in suitable and accessible positions on public property or easement to
facilitate the observation, measurement and sampling of all their wastes or wastewater. Control
manholes shall be located and constructed in a manner approved by the Public Works and
Development Director or designee. Plans shall be submitted and approved by the Public Works and
Development Director or designee prior to construction.
I. The Public Works and Development Director or designee shall determine the type of meter to be used.
§ 290-15. Industrial waste analysis.
When Chs. NR 101 and NR 202, Wis. Adm. Code, and/or the MMSD or the Town of Norway Sanitary
District No. 1 requires the submittal of the character and concentration of wastes, waste volume, and
production information to the MMSD or the Town of Norway Sanitary District No. 1 and/or Wisconsin
Department of Natural Resources (DNR), the user shall have the waste character and concentration
determined by an independent testing laboratory. A copy of the test results and DNR reports shall be
submitted to the Public Works and Development Director or designee.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, Wl
§ 290-16 SEWERS § 290-21
§ 290-16. Wastewater discharge permit system.
A. Wastewater discharge permit. The requirement for wastewater discharge permits is regulated by the
MMSD or the Town of Norway Sanitary District No. 1. A copy of the permit application and any
issued permit shall be submitted to the Public Works and Development Director or designee.
B. Revocation of permit. Any user which violates any of the conditions of its permit, contractual
agreement, or this chapter or applicable state and federal regulation is subject to having its permit
revoked.
§ 290-17. Admission to property.
The City shall be permitted to gain access to such properties as may be necessary for the purpose of
inspection, observation, measurement, sampling and testing, in accordance with provisions of this chapter.
§ 290-18. Confidentiality of critical information. [Amended 6-26-2018 by Ord. No. 1418]
When requested by the user furnishing a report or permit application or questionnaire, the portions of the
report or other document which might disclose trade secrets or secret processes shall not be made available
for inspection by the public but shall be available for use by the City or any state agency in judicial review
or enforcement proceedings involving the person furnishing the report.
§ 290-19. Violations and penalties.
A. Any person who fails to comply with any of the provisions of this chapter or with an order of the
approving authority issued in pursuance of this chapter, or shall tamper with metering or sampling,
shall be liable to the City for any expense, loss or damage occasioned by such violation, including
reasonable attorney fees and other expenses of litigation, and upon conviction of any violation of this
chapter shall be fined not less than $100 nor more than $5,000 per violation, plus damages. Each day
a condition is allowed to exist which is contrary to all or any part of this chapter shall constitute a new
violation. Change of ownership or occupancy of premises delinquent under the provisions of this
chapter shall not be cause for reducing or eliminating charges due and penalties for violations.
[Amended 5-28-2019 by Ord. No. 14291
B. In addition to the court proceedings and penalties described in the foregoing sections of this chapter,
whenever a person violates any provision of this chapter or fails to comply with any order of the
approving authority, the approving authority may order that an action be commenced on behalf of the
City in the Circuit Court for Waukesha County for the purpose of obtaining an injunction restraining
the person violating this chapter or failing to comply with the order from making any further
discharges into the sewerage system of the City.'
§ 290-20. Milwaukee Metropolitan Sewer District regulations. [Amended 6-26-2018 by Ord. No. 14181
The Milwaukee Metropolitan Sewer District (MMSD) Rules and Regulations, Chapter 17, promulgated by
MMSD, as now in effect and as the same may be amended from time to time hereafter, is hereby
incorporated by reference and shall be of full force and effect as though set forth in its entirety herein.
§ 290-21. Sewer extension permit in Milwaukee Metropolitan Sewer District contract area.
7. Editor's Note: Original § 21.19, State regulations, which immediately followed this section, was repealed 6-26-2018 by Ord. No. 1418.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-21 MUSKEGO CODE § 290-21
A. Intent. The City of Muskego has contracted with the Milwaukee Metropolitan Sewerage District
(MMSD) to provide sewer service within a certain area of the City pursuant to the terms and conditions
of said contract. Pursuant to the terms and conditions of said contract, there is a limitation on the
amount of base flow which the City may utilize and certain procedures after which certain amounts
of base flow will be considered to have been utilized by the City and thereafter removed from the
amount of base flow which can be utilized in the future by the City. In adopting this section, the City
is attempting to prevent the allocation of portions of the base flow to sewer extensions that will not be
constructed within a defined time period.
B. Application for sewer extension permits. Any person who wishes to obtain a sewer extension permit
within the MMSD contract area of the City must file with the City an application for a sewer extension
permit in a manner as designated by the City. Said application will be considered by the Public Works
and Safety Committee of the City of Muskego and shall only be granted if the Committee determines
that the amount of capacity allocated by the granting of said permit will not jeopardize the ability of
the City to comply with the terms and conditions of said MMSD contract and it is reasonably
anticipated that the extensions will be constructed and utilized within the time period stated in this
section.
C. Termination of permit.
(1) Except as provided herein, all sewer extension permits granted under this section shall
automatically terminate and the allocation of said capacity shall cease to the extent that said
sewer extension is not certified, by a representative appointed by the City to make said
certification, to be completely constructed and approved within one year of the granting of said
permit.
(2) Any sewer extension permits granted under this section may be extended beyond the one-year
period specified in Subsection C(1) above if, prior to the end of said one-year period, the period
is extended by a subdivider's/developer's agreement entered into between the holder of said
permit and the City. Said extension shall only be granted if installation of the sewer extensions
is secured by either a letter of credit or, when not prohibited by other ordinances or resolutions
of the City, other security deemed appropriate by the City. Said letter of credit or security shall
be sufficient to ensure the installation of the sewer extension under terms and conditions
satisfactory to the City for that phase of the development covered by the subdivider's/developer's
agreement.
(3) Any subdivider's/developer's agreement entered into pursuant to Subsection C(2) above shall
also contain a provision, satisfactory to the City, indicating that all other sewer extension permits
granted under this section and not secured as required in Subsection C(2) above shall
automatically terminate and the allocation of said capacity shall cease to the extent that said
sewer extension is not certified, by a representative appointed by the City to make said
certification, to be completely constructed and approved within four years of the execution of
the subdivider's/developer's agreement.
(4) If the development noted above is being developed in phases, then the developer may, within
the four-year period referred to in Subsection C(3) above, request that the City enter into an
additional subdivider's/developer's agreement for the next phase of said development. Any such
developer's agreement shall contain provisions as required in Subsection C(2) above to secure
and ensure installation of sewers for that phase and shall also contain a provision as provided in
Subsection C(3) above for the remaining extension permits.
(5) A developer may, if additional phases are provided for in the development, submit additional
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-21 SEWERS § 290-21
subdivider's/developer's agreements for additional phases. Any such agreement shall be subject
to the same terms and conditions as stated in Subsection C(2), (3) and (4) above.
D. Permission for use of sewer extensions previously granted.
(1) As to all sewer extensions that would now be under this section but were approved prior to the
initial adoption of this section on July 3, 1991, all of the persons or entities granted such
permission shall be given notice of the passage of this section and shall be considered to have
been granted a sewer extension permit as of the date they are mailed notice of the adoption of
this section. No permit fee will be required under this subsection. The sewer extension permit
granted under this subsection shall terminate and the allocation of said capacity shall cease to
the extent that said sewer extension is not certified, by a representative appointed by the City to
make certification, to be completely constructed and approved within one year of the mailing of
the notice of the adoption of this section.
(2) Any sewer extension permits granted under this section may be extended beyond the one-year
period specified in Subsection D(1) above if, prior to the end of said one-year period, the period
is extended by a subdivider's/developer's agreement entered into between the holder of said
permit and the City. Said extension shall only be granted if installation of the sewer extensions
is secured by either a letter of credit or, when not prohibited by other ordinances or resolutions
of the City, other security deemed appropriate by the City. Said letter of credit or security shall
be sufficient to ensure the installation of the sewer extension under terms and conditions
satisfactory to the City for that phase of the development covered by the subdivider's/developer's
agreement.
(3) Any subdivider's/developer's agreement entered into pursuant to Subsection D(2) above shall
also contain a provision, satisfactory to the City, indicating that all other sewer extension permits
granted under this section and not secured as required in Subsection D(2) above shall
automatically terminate and the allocation of said capacity shall cease to the extent that said
sewer extension is not certified, by a representative appointed by the City to make said
certification, to be completely constructed and approved within four years of the execution of
the subdivider's/developer's agreement.
(4) If the development noted above is being developed in phases, then the developer may, within
the four-year period referred to in Subsection D(3) above, request that the City enter into an
additional subdivider's/developer's agreement for the next phase of said development. Any such
developer's agreement shall contain provisions as required in Subsection D(2) above to secure
and ensure installation of sewers for that phase and shall also contain a provision as provided in
Subsection D(3) above for the remaining extension permits.
(5) A developer may, if additional phases are provided for in the development, submit additional
subdivider's/developer's agreements for additional phases. Any such agreement shall be subject
to the same terms and conditions as stated in Subsection D(2), (3) and (4).
E. Permit fees. Upon filing of an application, the applicant shall pay a permit fee as may be determined
by resolution of the Common Council from time to time per application per type of development
(residential, multifamily, commercial, or industrial).
F. Permit not a guarantee. Any applicant who has obtained a sewer extension permit pursuant to the
provisions of this section shall also be subject to applicable rules and regulations of the Milwaukee
Metropolitan Sewerage District as well as all applicable state and federal laws. The issuance of a
sewer extension permit under this section is not a guarantee that an applicant will be allowed to
Downloaded from https://ecode360.conVMU3544 on 2025-04-03
City of Muskego, WI
§ 290-21 MUSKEGO CODE § 290-21
connect to the sewerage system.
Downloaded from https://ecode360.conVMU3544 on 2025-04-03