CCR2022.097-Dedication of Publ Impr (Mallard Reserve)COMMON COUNCIL — CITY OF MUSKEGO
RESOLUTION #097-2022
DEDICATION OF PUBLIC IMPROVEMENTS
FOR MALLARD RESERVE
WHEREAS MALLARD RESERVE, hereafter called "DEVELOPER" has constructed public
improvements in and around MALLARD RESERVE site; including all sanitary sewer facilities, storm sewer
facilities, water distribution, and roadway pavement, including any and all equipment and appurtenances which
may in any way be a part thereof or pertain to, in and for MALLARD RESERVE; and
WHEREAS, the DEVELOPER has completed the construction and installation of the following
improvements:
Sanitary Sewer
371 VF at $310.00/Each of 48" Sanitary Manhole $115,010.00
300 LF at $30.00/LF of 2-Inch PVC Sanitary Sewer $9,000.00
5,056 LF at $99.00/LF of 8-Inch PVC Sanitary Sewer $500,544.00
2,245 LF at $95.00/LF of 6-Inch PVC Sanitary Lateral $213,275.00
Total — Sanitary Sewer $837,829.00
Water Main
5,233 LF at $89.00/LF of 8-Inch PVC Water Main $465,737.00
14 Each at $4,870.00/Each of Hydrant Assembly w/ Valve Box $68,180.00
175 LF at $100.00/LF of 6" PVC Hydrant Lead $17,500.00
19 Each at $1,800.00/Each of 8-Inch Gate Valve $34,200.00
2,167 LF at $75.00/LF of 1.25-inch HDPE Water Service $162,525.00
Total — Water Main $748,142.00
Storm Sewer
811 LF at $105.00/LF of 36-Inch RCP Storm Sewer
$85,155.00
336 LF at $85.00/LF of 30-Inch RCP Storm Sewer
$28,560.00
597 LF at $80.00/LF of 24-Inch RCP Storm Sewer
$47,760.00
530 LF at $62.00/LF of 18-Inch RCP Storm Sewer
$32,860.00
1118 LF at $40.00/LF of 15-Inch RCP Storm Sewer (includes culverts)
$44,720.00
292 LF at $44.00/LF of 12-Inch RCP Storm Sewer
$12,848.00
2,684 LF at $34.00/LF of 6-Inch PVC Storm Drain
$91,256.00
61 Each at $650.00/Each of Storm Cleanouts
$39,650.00
9 Each at $1,300.00/Each of Storm End Sections
$11,700.00
6 Each at $2,000.00/Each of Field Inlets
$12,000.00
22 Each at $3,200.00/Each of Storm Manholes
$70,400.00
34 Each at $2,300.00/Each of Storm Catch Basin/Manholes
$78,200.00
Total — Storm Sewer
$555,109.00
Paving
10,240 SY at $9.50/SY of Aggregate Base Course (8" depth)
$97,280.00
6,581 LF at $15.60/LF of 30" Mountable Curb and Gutter
$102,663.60
10,240 SY at $16.50/SY of 4-Inch Binder Asphalt Course
$168,960.00
1,699 SY at $28.75/SY of Priegel Dr. 4-Inch Binder and 2-Inch Surface Asphalt Course
$48,846.25
195 LF at $106.87/LF of Pathway (Asphalt, Stone Base, Concrete Pad)
$20,840.00
Total — Paving (Not including Final Lift of Asphalt)
$438,589.85
and appurtenances (collectively called "IMPROVEMENTS") in accordance with the provision of Chapter 392 of
the Municipal Code of the City of Muskego, hereafter called the "CITY", and the City Engineer has certified the
systems' acceptability; and
WHEREAS, it is the Developer's intent to, without charge to the CITY, unconditionally give, grant,
convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together
with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the
utilization of such IMPROVEMENTS; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any
defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of
dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY
against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or
other failure of this guarantee; and
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the
recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public
improvements in and for MALLARD RESERVE Development.
DATED THIS DAY OF 12022
SPONORED BY:
FINANCE COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #097-2022 which was adopted by the Common
Council of the City of Muskego.
Sharon Mueller, City Clerk -Treasurer