Loading...
Landfill Standing Commitee Packet 02192024CITY OF MUSKEGO LANDFILL STANDING COMMITTEE AGENDA 02/19/2024 5:00 PM Muskego City Hall, W182 S8200 Racine Ave CALL TO ORDER ROLL CALL STATEMENT OF PUBLIC NOTICE NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: Discuss GFL EPL Phase 8 Construction Schedule with Nightshifts Memo to Landfill February 2024 - GFL Request for Extended Work Hours.pdf GFL EPL Phase 8 Schedule with Nightshifts.pdf EPL Cell 8 Land Disturbance Activities 2023_Plan Sheets.pdf CITIZEN COMMENTARY (Limited to 15 Minutes) Time for citizens to respond to agenda items discussed at this meeting. ADJOURNMENT NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE -STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE -STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO CITY HALL, (262) 679-4100. CITY OF MUSKEGO Staff Report to Landfill Committee To: Landfill Committee From: Scott Kroeger, PE, PLS, Public Works and Development Director Subject: GFL Request for Extended Work Hours Date: February 19, 2024 GFL is requesting two extended work hours. These requests are to meet the completion schedule of October 2024 for the new cell to ensure that waste does not need to be diverted and the site can continue to meet our customer needs. (Please refer to attachments for construction schedule and maps). • On Saturdays from 12:00 noon to 4:00 pm starting February 17th through May 18th 2024 • Operate a second shift from 6:00 pm to 6:00 am for mass excavation activities. The second shift would run from February 261" thru May 31" Monday through Friday, weather dependent. No overnight shift on Saturday and no Sunday operation. GFL had a construction meeting discussing all alternatives. This was decided at this meeting as the best option to getting the cell construction completed in a timely manner. In order to minimize potential impacts to our neighbors, the contractor has agreed to the following • Once WDNR approval is received, begin immediately on the screening berm to the south of the excavation area. This will provide significant screening of the construction area. The contractor expects approximately 20 working days to complete that screening berm. • During the second shift hours, only the stockpiles to the north of landfill will be used for stockpiling material. No stockpiling of soils to locations along 8-mile Road will occur. • All lighting needs for the excavation area will be directed down into the excavation area. All lighting needs along the access roads and the stockpiles will be directed away from any residential areas and HWY 45. • In order to minimize equipment alarms, the contractor will set up operations in the excavation and at the stockpiles to minimize backing of equipment. The contractor will also evaluate methods to minimize the noise levels of the alarms while still maintain compliance with regulatory requirements. The City Attorney has reviewed this matter from the prospective of granting GFL's request. The approval to extend the hours is a two step process. First, per the terms of the Landfill Contract, the Standing Committee has been given the authority to amend the days and hours of operation established in the Contract by means of a written Agreement. This is a Committee decision as a whole as opposed to any one member of the Committee or other City Official. Therefore, this meeting was called as an emergency condition as allowed in the Contract, for a discussion and decision on whether or not to grant GFL's request to extend hours of operation. In the event GLF's request will be granted by the Committee, it must be in written form. Page 1 of 2 2 The second part of the permission process has to do with the City's Noise Ordinance at construction sites. Should the Standing Committee authorize GLF's request, the Mayor would need to grant GFL a waiver from the restrictions contained within the Ordinance to ensure its operations would not be in violation of it. Again, this is handled by the Mayor and does not need to be addressed by the Standing Committee. Page 2 of 2 3 ID Task Name Duration Start Finish Predeces! 1 Mass Excavation and Phase 8 Cell 181.25 Mon 2/26/24 Fri 10/4/24 Construction days 2 Mass Excavation 95.63 day Mon 2/26/24 Thu 6/13/24 Mass Excavation (assumes 5 night 70 days Mon 2/26/24 Wed 5/15/24 3 shifts per week and working Saturday dayshift) Aux task with stockpiles (silt sock, 20 days Wed 5/15/24 Fri 6/7/24 3 4 ditches, etc.) 5 Stockpile Restoration 20 days Wed 5/22/24 Thu 6/13/24 3 Cell Construction 118 days Wed 5/8/24 Fri 10/4/24 6 ® Subbase Prep 10 days Wed 5/8/24 Sat 5/18/24 7 Undercuts/Fills 7 days Mon 5/13/24 Tue 5/21/24 7FS-5 da 8 Underdrain System 15 days Mon 5/13/24 Thu 5/30/24 7FS-5 da 9 Clay Liner 32 days Tue 5/21/24 Thu 6/27/24 8 10 Geosynthetics 13 days Thu 6/27/24 Thu 7/11/24 10 11 Drainage Layer 16 days Thu 7/11/24 Fri 8/2/24 11 12 SSR and Leachate Collection 15 days Fri 8/2/24 Fri 8/23/24 12 13 GCCS/FM/Airline 10 days Fri 8/23/24 Fri 9/6/24 13 14 Access Road 20 days Fri 9/6/24 Fri 10/4/24 14 15 '2 Mar 17 ' Mar 31 Apr 14 ' Ayr 28 'd May 12 ' May 26 ' Jun 9,241 Jun 23 '2 Jul 7 '24 1 Jul 21 '2 Aug4 ' 111511912312713114 18 1121161201241281216 11011411812212613013 17 111115119123127111519 1131171211251291216 10' YO 0% 0% 0% 0% i O% Task Project Summary Manual Task o o Start -only Q Deadline Project: GFL Emerald Park Phas Split Inactive Task Duration -only Finish -only Progress Date: Wed 2/14/24 Milestone O Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary Inactive Summary Manual Summary External Milestone Page 1 CA ID Task Name Duration Start Finish Predecesso 'J Feb 18 ' Mar 3 '2 Mar 17 ' Mar 31 Apr 14 ' Ayr 28 'd May 12 ' May 26 'J Jun 9 '241 Jun 23 '21 Jul 7 '24 1 Jul 21 '2A Aug4 '2 Au 18 ' Se 1 '2 Se 15 ' Se 29 ' Oct 13 '2 Oct 0 121161201241281317 11111511912312713114 81121161201241281216 11011411812212613013 7 1115192327 1 5 9 11311712112512912 6 10141181221261301317 1115192327 1 1 5 19 1131171211251291 16 Site Restoration 10 days Fri 9/6/24 Fri 9/20/24 14 B B 0% Task Project Summary Manual Task Start -only Q Deadline b Project: GFL Emerald Park Phas Split Inactive Task Duration -only Finish -only Progress Date: Wed 2/14/24 Milestone O Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary J Inactive Summary Manual Summary U J External Milestone O Page 2 N M N O cli z w 0 0 Z 0 Z Q 0 0 a o T m 3 cD J .Q Y U O an I J d w Q 0 a N 0 a o 0 U Ld 00 (a O L d I N n 04 N Y Q 0 0 J Ld w w / H U w 0 of i L xx TEMPORARY SURFACE WATER BASIN jj /� //%' �312 2),/ j' EXISTING BUILDINGS AND SILO o 0 TO BE REMOVED DURING TO r` CONSTRUCTION goo // %//j/ // /j/! - APPROXIMATE LIMITS OF PROPOSED SAND STOCKPILE ' /j IKA IN r�(ACTIVEI 7B NOF�.-H 2014) h / f o 0 P §E I III l' 21 . ,� l _ 1EXISTING SEDIMENTATION WETLAND P (IC U RE I ND PROTECTION BASIN II / AREA SIGNAGE (TYP.) SEE / DETAIL 7 08 � EXISTING MONITORING WELL AND PIEZOMETER (TO BE 0000, j ABANDONED BY OTHERS) SF--= MW 104A o / LI' / Zjjj/jj///j�/� DRAINAGE CHANNEL DIVERSION BERM II jj///j INTO SEDIMENTATION BASIN (TYP.) -/ SEE DETAIL /j%%/j% 08 /j//j%/ +- i� / // // // // / /// // // /// // /j/� //// / // / /% / // / IIII ❑s ir/ j // /�////// j j o /�// ///////// //////////j/ a l /// /a / // SILT SOCK FILTER TYP. SEE DETAIL I III II ') APPROXIMATE LIMITS OF PROPOSED TOPSOIL STOCKPILE / / // 11 I // // // j / // j /,//// j /j/ j // j171111 j SILT FENCE (TYP.) / //�j j EXISTING STAFF GAUGE ; / // /// `� ///// ///////// /// /� SEE DETAIL / / / / 4 �/ (TO BE ABANDONED BY/j%I - OTHERS) EXISTING SEDIMENTATION BASIN j �/ j ////j///j/j//jj//////// EXISTING BIOFILTE 6 -- % j / //////// / //// i" ///// / _ // /7 % / %/ F� // // // // // // Q� o- LEGEND PROPERTY BOUNDARY o ° o I 00 8 0 mrc //V// // ///// //// SURFACE WATER BODY SILT SOCK FILTER (TYP.)/� SEE DETAIL 5 \ /// / ///, /% i// T/ , DRAINAGE CHANNEL DIVERSION BERM INTO SEDIMENTATION BASIN (TYP.) 1 SF - - - SF - - SF - - - SF - - - SEE DETAIL 1 �j -� 08jT/ STOCKPILED VOLUME 108,197 SF (2.48 SUMMARY ACRES) CUT (CY) FILL (CY) NET (CY) 500 33,800 33,300 (FILL) PROPOSED STOCKPILE AND SEDIMENTATION BASIN/ SUBJECT TO CHANGE - - sF� - / SILT FENCE (TYP.)/� SEE DETAIL 4 1 , - - - 08 ra 'r ens in e ectual property Ot Tetra Tech. Any modifi Lion to the riginal by Other than Tetra Tech personnel violates its original purpose and s76 v ges ma e c si ocument without express written consent of the originator. I + I EXISTING SEDIMENTATION - BASIN sommi L 0 I%/ j j, SEE DETAIL 6 08 I V % /�� PERMITTED SOLID WASTE BOUNDARY IPHASE BOUNDARY + N 5,200 //%/jj%//// DELINEATED WETLAND -�MPMMOMMMM AREA OF FINAL COVER (CLOSED) I / +MW--125A MONITORING WELL Q MW-125C PIEZOMETER I lb 4)PW-10 PRIVATE WELL LOCATION + GP19 GAS MONITORING PROBE I ® SG18 STAFF GAUGE EXISTING 2' CONTOUR + N 5, 000 — 1400 EXISTING 10' CONTOUR ----�- -- EXISTING VEGETATION / TREELINE EXISTING SURFACE WATER BODY - PROPOSED SUBGRADE 2' CONTOUR 1 400 PROPOSED SUBGRADE 10' CONTOUR } SURFACE WATER DRAINAGE DITCH / BERM - SF - - - SF - - - SILT FENCE 93 ROCK CHECK DAM + N 4,800: 4 SILT SOCK FILTER awl O WETLAND PROTECTION AREA SIGNAGE MW--125A MONITORING WELL (TO BE ABANDONED) _ Q MW-125C PIEZOMETER (TO BE ABANDONED) � -- - SG18 - ® STAFF GAUGE (TO BE ABANDONED) r I PROPOSED SAND STOCKPILE LOCATION L — — — — r _____ _ _I PROPOSED TOPSOIL STOCKPILE LOCATION PROPOSED TRUCK ACCESS ROAD WITH BREAKER N 4,---; RUN MATERIAL ' - PROPOSED TRUCK ACCESS ROAD PROPOSED STOCKPILE D AND SEDIMENTATION ® SG22 L - - - - - - - - BASIN SUBJECT TO CHANGE NOTES: 1. SEE PLAN SHEET 02 OF THIS PLAN SET FOR ADDITIONAL LEGEND, BASE MAP NOTES, AND CONTROL POINT LOCATIONS. j 2. PRESERVE AND PROTECT ALL MONITORING WELLS, PIEZOMETERS, / AND GAS PROBES. MONITORING PROBES TO BE ABANDONED IN CONSTRUCTION AREA SHALL BE PROTECTED UNTIL ABANDONMENTS ARE COMPLETED BY OTHERS. DAMAGED MONITORING DEVICES SHALL BE REPAIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE. 3. WETLANDS DELINEATED BY THE FOLLOWING SOURCES: \// •• WETLAND DELINEATION WITHIN EMERALD PARK LANDFILL PROPERTY BOUNDARIES WAS DETERMINED IN THE FIELD BY III I JOHNSON, JOHNSON & ROY/INC., MADISON, WISCONSIN, AND N 4,200, -NATURAL RESOURCES CONSULTING, INCORPORATED, WINDSOR, ��I I WISCONSIN. THE LATEST WETLAND DELINEATION BOUNDARIES MAP FOR THE AREA OF THE PROPOSED WESTERN EXPANSION, AND APPROVED BY THE WDNR, IS DATED OCTOBER 22, 2009. /// /� .. WETLAND DELINEATION TO THE NORTH, SOUTH, EAST, AND WEST OF EMERALD PARK LANDFILL PROPERTY BOUNDARIES IS BASED j j ON LIMITS DEFINED ON THE FOLLOWING WISCONSIN WETLANDS INVENTORY MAPS, PREPARED BY THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES BUREAU OF PLANNING:- TOWNSHIP 5 NORTH, RANGE 21 EAST, MILWAUKEE COUNTY, WI. DATED JULY 1979 AND REVISED OCTOBER 1995, TOWNSHIP 5 NORTH, RANGE (+ �� �N 4,000 20 EAST WAUKESHA COUNTY, WI. DATED JULY 1979 AND •• REVISED W TLAND DELINEATION WITHIN THE PROPOSED WESTERN EXISTING SEDIMENTATION EXPANSION WAS PERFORMED BY STANTEC IN OCTOBER 2013, If � BASIN OCTOBER 2014, MARCH 2O15, AND MAY 2015. MAY 2015 WETLAND BOUNDARIES WERE APPROVED BY THE WDNR AND ACOE IN JUNE 2015 AND CONFIRMED IN 2021 BY TETRA TECH. II \ N 3,800 STOCKPILE E VOLUME 189,788 SF (4.36 SUMMARY ACRES) CUT (CY) FILL (CY) NET (CY) 0 132,500 132)500 (FILL) REV DATE DESCRIPTION DWN BY DES BY CHK BY APP BY DATE OF ISSUE DRAWN BY RBN CHECKED BY N S D SEP. 2023 DESIGNED BY RBN APPROVED BY NSD 0 100 200 SCALE IN FEET ISSUED FOR CONSTRUCTION 10 SHEET NO. 05 PROJECT NO. 4231712 W. E N M I M N a V) z W 0 J 0 z 0 Z lu u, Of ID a a J 3 ct J 41 .Q Y O O N CL a w Q i 0 CL 0 0 O X W O 00 fN 0 0- N n_ M Y O_' CL a 0 Ld m w U w 0 W CL a X LZ CD op r� EXISTING SEDIMENTATION BASIN '�_ o e o D � � I M C -o- o 0 0 0 8 0 C, 1 EXISTING SEDIMENTATION BASIN = M�B�� ,n o BREAKER RUN MATERIAL /jjj FOR TRUCK ACCESS TO V//1 STOCKPILE AREA %/jj SEE DETAIL 6 08 WETLAND PROTECTION AREA SIGNAGE (TYP.) / j/ SEED TAIL 7 08 / //% —ems_ DRAINAGE CHANNEL DIVERSION BERM INTO SEDIMENTATION BASIN (TYP.) SEE DETAIL ; jj/ SILT SOCK FILTER (TYP.)SEE // / 5 / SILT FENCE (TYP.) SEE DETAIL 4 08 EXISTING SEDIMENTATION BASIN /a EXISTING SEDIMENTATION BASIN I '' j�j/jjj// � 0C --- - /° a nl D12j/o / /�/ \ ® SG22/// WETLAND PROTECTION Tom/ AREA SIGNAGE TYP. SEE DETAIL 7 + //jjj// f j j j/ // / j ,� / i , //�i// j/ j j/ + DRAINAGE CHANNEL DIVERSION BERM INTO SEDIMENTATION BASIN (TYP.) ❑s l // /// // ///% / // /////// SEE DETAIL S— EXISTING BIOFILTER j // �j/ jjj /�x / — EXISTING SEDIMENTATION j j/ j // SILT SOCK FILTER (TYP.) — — BASIN j/ j / /' SEE DETAILQi8) %% SILT FENCE (TYP.) SEE DETAIL c n STOCKPILE E VOLUME 189,788 SF (4.36 SUMMARY ACRES) CUT (CY) FILL (CY) NET (CY) 0 132,500 132,500 (FILL) -- �� ---------- TOPSOIL ON EXISTING STOCKPILE SHALL BE STRIPPED AND RE -USED I I I This drawing represents intellectual property of Tetr Tech. Any modification the original by other than Tetra Tech personnel violates its on inal purpose and as such is rendered void. Tetra Tech will not be held liable for any ch nges made to this docum Fit without express written consent of the originator. j STOCKPILE F VOLUME 380,900 SF (10.05 SUMMARY ACRES) CUT (CY) FILL (CY) NET (CY) 100 263,900 263,800 (FILL) REV DATE DESCRIPTION DWN BY DES BY I CHK BY APP BY DATE OF ISSUE DRAWN BY RBN CHECKED BY N S D SEP. 2023 DESIGNED BY RBN APPROVED BY NSD f-- ilal +l MW--125A Q MW-125C ° ® Pw-10 GP19 ® SG1S 1400 N 4,-000 C 1400 — SF — —— SF --- PROPERTY BOUNDARY PERMITTED SOLID WASTE BOUNDARY PHASE BOUNDARY DELINEATED WETLAND AREA OF FINAL COVER (CLOSED) MONITORING WELL PIEZOMETER PRIVATE WELL LOCATION GAS MONITORING PROBE STAFF GAUGE EXISTING 2' CONTOUR EXISTING 10' CONTOUR EXISTING VEGETATION / TREELINE EXISTING SURFACE WATER BODY PROPOSED SUBGRADE 2' CONTOUR PROPOSED SUBGRADE 10' CONTOUR SURFACE WATER DRAINAGE DITCH / BERM SILT FENCE SURFACE WATER BODY ROCK CHECK DAM u Q SILT SOCK FILTER O ❑s WETLAND PROTECTION AREA SIGNAGE PROPOSED TRUCK ACCESS ROAD WITH BREAKER N 4,-�500 RUN MATERIAL PROPOSED TRUCK ACCESS ROAD N 4,-400 SURFACE WATER BODY NOTES: 1. SEE PLAN SHEET 02 OF THIS PLAN SET FOR ADDITIONAL LEGEND, BASE MAP NOTES, AND CONTROL POINT LOCATIONS. ® PW 9 2. PRESERVE AND PROTECT ALL MONITORING WELLS, PIEZOMETERS, AND GAS PROBES. MONITORING PROBES TO BE ABANDONED IN CONSTRUCTION AREA SHALL BE PROTECTED UNTIL ABANDONMENTS N 4,>R00 ARE COMPLETED BY OTHERS. DAMAGED MONITORING DEVICES SHALL BE REPAIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE. 3. WETLANDS DELINEATED BY THE FOLLOWING SOURCES: WETLAND DELINEATION WITHIN EMERALD PARK LANDFILL PROPERTY BOUNDARIES WAS DETERMINED IN THE FIELD BY JOHNSON, JOHNSON & ROY/INC., MADISON, WISCONSIN, AND NATURAL RESOURCES CONSULTING, INCORPORATED, WINDSOR, WISCONSIN. THE LATEST WETLAND DELINEATION BOUNDARIES MAP FOR THE AREA OF THE PROPOSED WESTERN EXPANSION, j AND APPROVED BY THE WDNR, IS DATED OCTOBER 22, 2009. 4,-000 .. WETLAND DELINEATION TO THE NORTH, SOUTH, EAST, AND WEST OF EMERALD PARK LANDFILL PROPERTY BOUNDARIES IS BASED ON LIMITS DEFINED ON THE FOLLOWING WISCONSIN WETLANDS INVENTORY MAPS, PREPARED BY THE WISCONSIN DEPARTMENT OF NATURAL RESOURCES BUREAU OF PLANNING:- TOWNSHIP 5 NORTH, RANGE 21 EAST, MILWAUKEE COUNTY, WI. DATED JULY 1979 AND REVISED OCTOBER 1995.- TOWNSHIP 5 NORTH, RANGE 20 EAST WAUKESHA COUNTY, WI. DATED JULY 1979 AND REV •• WETLAND WD DELINEATION WITHIN THE PROPOSED WESTERN EXPANSION WAS PERFORMED BY STANTEC IN OCTOBER 2013, OCTOBER 2014, MARCH 2O15, AND MAY 2015. MAY 2015 WETLAND N 3,00 BOUNDARIES WERE APPROVED BY THE WDNR AND ACOE IN JUNE 2015 AND CONFIRMED IN 2021 BY TETRA TECH. ALL PROFESSIONAL ENGINEERING WORK IS PERFORMED BY DULY LICENSED PROFESSIONAL ENGINEERS UNDER THE APPROPRIATE STATE REGISTERED PROFESSIONAL ENTITY. m 11 N 3,0 N 0 100 200 SCALE IN FEET ISSUED FOR CONSTRUCTION EMERALD PARK LANDFILL, LLC MUSKEGO, WISCONSIN PHASE 8 MASS EXCAVATION CONSTRUCTION DRAWINGS STOCKPILE LAYOUTS SHEET NO. 06 PROJECT NO. 4231712 7 E C N M N a N N Z W J O Z Z a w r- O 0 0 O J m 3 r W