Loading...
CUG 224 Recorded North Cape Storage 20230404224 11 Conditional Use Grant Document Number II Document Title Please see attached A parcel of land located in Section 25, Town 5 North, Range 20 East, City of Muskego, Waukesha County, Wisconsin, Tax Key No. 2259.981.002 4712600 REGISTER OF DEEDS WAUKESHA COUNTY, WI RECORDED ON March 21 2023 09:31 AM James R 6ehrend Register of Deeds 7 PGS TOTAL FEE:$30.00 TRANS FEE: 0.00 Book Page :cording Area ime and Return Address: ity of Muskego ttn: Planning Department .O. Box 749 luskego, WI 53150 2259.981.002 Parcel Identification Number (PIN) This information must be completed by submitter. document title, name & return address, and PIN (if required). Other information such as the granting clauses, legal description, etc. may be placed on this first page of the document or may be placed on additional pages of the document. Note. Use of this cover page adds one page to your document and $2.00 to the recording fee. Wisconsin Statutes, 59.517. WRDA 2/96 Relates to No. CUG 2 (1967) Conditional Use Grant Grant No. 224 DOCUMENT NO. Acceptance of Conditions of Conditional Use Grant. pr THIS COVENANT, Made this day off'f WI , 2021 By Robert and Christine Arend, North Cape Real Estate, LLC., Grantor, for the use and benefit of all persons from time to time resident or owning property within the boundaries of the City of Muskego, Waukesha County, Wisconsin, and for the use and benefit of the said City of Muskego in its own right and as agent for the purpose of enforcing these presents on behalf of the above described class of person, Grantees. The premises affected by these presents (hereinafter called the Premises) are the following described lands in Township 5 North. Range 20 East, in the County of Waukesha and State of Wisconsin, to -wit: THIS SPACE RESERVED FOR RECORDING DATA TAX KEY NO. 2259.981.002 RE I URN TO: Attn: Planning Department City of Muskego W 182 S8200 Racine Ave Muskego, WI 53150 A parcel of land located in the SE '/4 of Section 25, Town 5 North, Range 20 East, City of Muskego, Waukesha County, Wisconsin, known as Tax Key No. 2259.981.002, Grantors warrant and covenant that at the time of the ensealing and delivery of these presents they are all of the owners of the Premises and that no other person has any estate or interest therein except by reason of easements for public utilities, building restriction, dedications to the public or public bodies, instruments not of record, and mortgages to bans, savings and loan association or insurance companies. Grantors represent that petition on their behalf was made to the City of Muskego pursuant to the Zoning Code of the said City of Muskego, for grant of permission to erect and/or conduct on the Premises a use there permissible not by right but only by Conditional Use Grant; that in connection therewith Grantors made certain representations and agreements as to the site, building and operation plans which were incorporated into the Conditional Use Grant: that based thereon Conditional agreements as to site, building and operation plans which were incorporated into the Conditional Use Grant: that based thereon Conditional Use Grant No 224 was issued under date of June 7, 2022 and that a true copy thereof is on file with the Plan Commission of the City of Muskego. NOW, THEREFORE, Grantor hereby accept the said Conditional Use Grant and covenant strictly to comply with all of the terms and conditions thereof. This covenant shall run with the land and shall be binding on the Grantors and all person claiming any estate of interest in the Premises by, through or under the Grantors, as long as the said Premises are used as described in the Conditional Use Grant for the purpose of allowing mini warehouses in the B-4 High }v�a� Business Zoning District. In Witness Whereof, Grantors have hereunto set their hands and se this ((�D da. of �-� 2023. SIGNED AND SEALED IN PRESENCE OF t - ----- ---------------------(SEAL) Ro ertArend, North Ca e Real Estate, LLC. CORPORATION STATE OF WISCONSIN) )SS WAUKESHA COUNTY) Personally came before me this day of 12012. President and Secretary of the above name corporation to me known to be such persons and officers who executed foregoing instrument and acknowledged that they executed same as such officers, by its authority, for the purposes contained. THIS INSTRUMENT WAS DRAFTED BY Ale'd nr691t-(_ (SEAL) STATE OF WISCONSIN) )SS WAUKESHA COUNTY) Personally came before,, . thi4 ay of �'_ 2023, the above natr d ragpa s el me known to be the person,BVo�'� /C the foregoing instrument and acknowledged i e. --��- }l _ • 1 v rP Notary Public, State of Wisc nsia = My Commission expires ate° ' S• t SC OF ----------------(SEAL) Christine Arend, North Cape Real Estate, LLC. STATE OF WISCONSIN) )SS WAUKESHA COUNTY,) Personally came before this day of �2023, the above named f�ebift ''C i" to me known to be the persons who executed w �`'� �°"'�:. th �or' oing instrument and ac o ledged the r "k rr 1` A 15 Notary Public, State of Wisconsin _ L� My Commission expires(°6►, _x (Section 59.51 (1) of the Wisconsin Statutes provides that all instruments to be recorded shall have plainly printed or typewritten theron the names of the grantors, grantees, witnesses and notary. Section 59.513 similarly requires that the name of the person who, or governmental agency which, drafted such instrument, shall be printed, typewritten, stamped or written theron in a legible manner ) No. z CUG 1 (1967) CONDITIONAL USE GRANT Grant Number 224 Secs. 62.23, 61.35, 60.74 and 59.97 Wis. Stats. Before the Plan Commission of the City of Muskego, Waukesha County, Wisconsin, in regards to Premises at W124 S9996 North Cape Road in Township 5 North, Range 20 East, Waukesha County, State of Wisconsin, further described as follows: A parcel of land located in Section 25, Town 5 North, Range 20 East, City of Muskego, Waukesha County, Wisconsin, Tax Key No 2259.981.002. WHEREAS the Zoning Code and Zoning District Map of the above named municipality, pursuant to State Statute, provide that the premises may not be used of right for the purpose hereinafter described but that upon petition such use may be approved by the municipality as a Conditional Use Grant in particular circumstances as defined by the standards in the Zoning Ordinance; and Petition therefore having been made, and public hearing held thereon, and the Plan Commission of the City of Muskego having determined that by reason of the particular nature, character and circumstances of the proposed use, and of the specific and contemporary conditions, grant of such use upon the terms and conditions hereinafter prescribed would be consistent with the requirements of the Zoning Ordinance: Now, therefore, IT IS GRANTED, subject to compliance with the terms and conditions hereinafter stated, that the Premises may be used as described in the Conditional Use Grant for the purpose of allowing mini warehouses in the B-4 Highway Business Zoning District. GRANTED by action of the Plan Commission of the City of Muskego the 7"' day of June 2022. Attest: ------ - - ----- --- -------------------------(Seal) Richar etfalski, ````00%1�1li�11114�' --- - -- ----- ---- -------------- Title Mayor % o . , mug"', Kerrl 011er (Mayor, President, Chairman)\��V��' �`•ti�C��� Title Clerk Z j GpRPO�T ::O L5Lr,1 L, (City, Village, Town County) Clerk iz •� r � Original filed in the office of the Plan Co issi n of he City of Muskeg$'"OOKESN��l Signed: The CONDITIONS of this Grant are: 1. This Grant shall become effective upon the execution and recording by the Owners of the Premises of an acceptance hereof in such form as to constitute an effective covenant running with the land. 2. This Grant shall be void unless proper application, pursuant to the building and zoning codes of the municipality, for appropriate Building, and Zoning Use and Occupancy Permits in conformity to this Grant, is made within N/A months of the date hereof. 3. This Grant is subject to amendment and termination in accordance with the provisions of the Zoning Code of this municipality. 4. Construction and operation of the use granted shall be in strict conformity to the approved site, building and operation plans filed in connection with the Petition for this Grant, and annexed hereto. 5. Any of the conditions of this Grant which would normally be the responsibility of tenants of the premises shall be made a part of their lease by the Owner, which shall contain provisions for posting of the pertinent conditions to notify employees thereof. NIEDECKEN 467N MILWAUKEE (OVER) 6. Conditions on the Operations See attached Resolution #P.C. 038-2022 a. Hours of operation b. Performance standards relating to noise, vibration, odor, smoke or dust: c. Water supply requirements: d. Provisions for sewage disposal: e. Other: 7. Conditions on the Buildings See attached Resolution #P.C. 038-2022 a. Facade material of each building side: b. Entrances, Design and Location c. Signs attached to the Building, Location, Size, Design (including lighting): d. Exterior Lighting of the Building: e. Other: 18. Conditions on the Site See attached Resolution #P.C. 038-2022 a. Street Access (number, location, design): b. Off -Street Parking (location and design including screening thereof): c. Loading and Service Areas (location and design): d. Outside Storage of Materials, Products or Refuse (location and screening thereof): e. Finish topography and building grades, retaining walls, storm water run-off: f. Landscaping of the Site and Buildings (including plant types, size, spacing): g. Pedestrian walkways, terraces, malls (location and design): h. Signs (free standing) location, size, design (including lighting): i. Exterior Lighting of the Site, location design and power: j . Other: Receipt of a True Copy of this instrument on behalf of the petitioner acknowledged t e ;�day of � (, 2023. --------------1----------------------------------------------- Note: Where the conditions are shown on maps, drawings, photographs, or similar attachments, Enter: "See Exhibit 11 AMENDED RESOLUTION #P.C. 038-2022 APPROVAL OF A BUILDING, SITE, AND OPERATION PLAN AND CONDITIONAL USE GRANT FOR NORTH CAPE REAL ESTATE LLC. LOCATED IN THE SE % OF SECTION 25 (TAX KEY NO. 2259.981.002 / NORTH CAPE ROAD) WHEREAS, A submittal was received from Robert & Christine Arend of North Cape Real Estate, LLC. for approval of a Building, Site, and Operation Plan and Conditional Use Grant for an indoor mini -storage use within a series of five secure and fenced buildings located along the southern end of North Cape Road (Tax Key No. 2259.981.002), and WHEREAS, The property is zoned B-4 Highway Business District and the use is permitted within the B-4 District subject to Building, Site and Operation Plan and Conditional Use Grant approval, and WHEREAS, The 2020 Plan depicts the property as Commercial uses and the proposal is consistent with the Plan, and WHEREAS, The applicant is proposing to build a total of five (5) new self -storage buildings housing 109 individual units of varying sizes totaling 28,760 square feet, and WHEREAS, Operations for the storage facility will be handled from the existing office at the neighboring Loomis Court Storage Facility which is under the same ownership, and WHEREAS, Office hours of the business are proposed as Monday through Friday 8:00 am — 4:00 PM and Saturdays by appointment, while the storage units will be available from 6:00 am — 9:00 pm daily, and WHEREAS, This property is governed by the Durham Hill Design Guide and the General Design Guide, and WHEREAS, The General Design guide requires 50 percent masonry and four-sided architecture, and WHEREAS, The building facades that are visible from North Cape Road contain a 3-foot band of northern ash colored stone veneer wainscoting with the upper portion of the walls being an ash gray metal panel wall, and WHEREAS, The elevations that face away or are not visible from the roadway contain no masonry with all metal panel walls, and WHEREAS, The overhead doors, roof and building trim is proposed as a matte black finish, and WHEREAS, The most prominent elevation would be the west side of building 2, which has been proposed with approximately 27 percent masonry, and WHEREAS, Due to elevation changes, the plans show that part of a foundation wall is exposed on the west side of building 2 and the north side of building 1, and WHEREAS, Architectural features are also important and the Durham Hill South Design Guide notes that the buildings shall be constructed to be harmonious with their natural and built surroundings while avoiding repetition and monotony, and WHEREAS, On the most prominent building side (west side of building 2), the wall is approximately 270 feet in length with three cupulas and four windows and small overhangs, or eaves that are proposed on all four sides of the building, and WHEREAS, The proposed buildings will have a minimum of 25 feet between the buildings for two-way drive aisles as well as emergency services, and WHEREAS, There are not any striped parking stalls as there is typically no need for separate parking at the facility, and WHEREAS, The asphalt drive aisles/lot abut each of the storage buildings and includes a mountable curb in the northeast corner of the lot near the storm water pond, and WHEREAS, Metal decorative fencing is proposed on the north side of building 2 and on the south side of the site at the entrance, and WHEREAS, The metal fencing is not meant to be a full screen, but rather a security detail with an aesthetically pleasing appearance, and WHEREAS, There have not been any locations identified for a dumpster enclosure nor any place for outdoor storage so if either are proposed in the future, Plan Commission approval is required, and WHEREAS, Landscaping has been proposed along North Cape Road mostly focused at the corners of the west side of building 2 along North Cape Road and adjacent to the private drive on the south side of the project, and WHEREAS, The final landscape plan must be submitted for formal review by the City Forester and Planning staff before building permits can be issued, and WHEREAS, Outdoor wall -mounted lighting fixtures were included in the package and all appear to be zero -degree tilt and full cut-off fixtures, per code requirements, and WHEREAS, A final photometric plan and final lighting specs will need to be submitted prior to obtaining permits, and WHEREAS, Storm water management will be handled on -site and is subject to approval from Engineering for stormwater, grading, utilities and drainage, and WHEREAS, Future location of any mechanicals (i.e. transformers, meters, HVAC equipment, etc.) must be reviewed and approved prior to building permits being issued as all exterior mechanicals for the building/site must be fully screened. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan and Conditional Use Grant for North Cape Real Estate, LLC. located on North Cape Road (Tax Key No. 2259.981.002). BE IT FURTHER RESOLVED, That the masonry band on all elevations with masonry must be raised past the sill of the windows with that masonry height matching the remainder of the buildings with masonry. BE IT FURTHER RESOLVED, That any buildings with exposed foundation must have the masonry band extend down to grade. BE IT FURTHER RESOLVED, That additional landscaping must be shown on a landscaping plan and approved by City staff prior to Building Permits being issued. BE IT FURTHER RESOLVED, Separate sign permits will be required before any signage (temporary or permanent) can be installed and this includes any signage on the building or freestanding. BE IT FURTHER RESOLVED, The concrete curb and gutter should be located on the western and southern sides of the site and can be either vertical -face or mountable curb & gutter (if needed for snow clearing needs). BE IT FURTHER RESOLVED, The site plan is subject to Fire Department approvals before Building Permits can be issued and possible changes to the site plan may be required based upon the final Fire Department review. BE IT FURTHER RESOLVED, The final landscape plan must be submitted for formal review before building permits can be issued. BE IT FURTHER RESOLVED, Formal approvals from the Engineering Division will be required before the issuance of any permits as it relates to stormwater management review, grading, etc. BE IT FURTHER RESOLVED, Any bollards, railings, ladders, louvers, vents, etc. must be painted to match the colors of the principal structure. BE IT FURTHER RESOLVED, No outdoor storage or overnight parking is allowed at any time on site. BE IT FURTHER RESOLVED, That all roof top and/or ground mechanicals (including HVAC devices, electrical transformers, etc.) must be screened from view and/or incorporated into the design of the site/structure (screening, etc.) and should be approved by the Planning Division before the issuance of building permits. BE IT FURTHER RESOLVED, A final photometric plan will need to be submitted prior to obtaining permits and all lighting must be zero degree tilt and full cut-off and the concrete bases for any pole lights cannot exceed 6 inches in height above grade. BE IT FURTHER RESOLVED, The height of any light poles cannot exceed the greater of either 15 feet or the average wall/eve height of the building. BE IT FURTHER RESOLVED, That an annual review will be required in March every year to ensure all conditions of this approval are being met. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: June 7, 2022 Denied: Deferred: Introduced: June 7, 2022 ATTEST: Adam Trzebiatowski, Planning Manager