The Committee reviewed the Bellview/Bay Lane Sewer Project. A
request dated June 17, 1987 received from Glenn and Ruth Pellmann
asked that the value to be placed on the sewer easement through
their property be established at $4,000.00. Ald. Hilt moved to
recommend acceptance of the offer of $4,000. from Mr. and Mrs.
Pellmann and moved that risers be installed on Bay Lane.
Seconded by Ald. Dumke, motion carried. Mayor Salentine will
contact Mr. and Mrs. Pellmann to determine whether or not they
wish laterals to be installed at this time.
The Committee reviewed the Valley View request for sewer
service. The Engineers have determined that possibly a temporary
connection could be made from the manhole on Sunnyhill & Ridge
Road until the Schaefer farm is developed and a permanent
connection can be made. The Committee directed Mayor Salentine
• to discuss the required easement for this temporary connection
through the Schaefer property with Mr. Alvin Schaefer and
directed the City Engineers to prepare cost estimates of the
project. The Clerk's Office is asked to notify the residents who
did not sign the petition for sewer service of the proposed
project and indicate that further discussion will be held at the
July Public Sewer Committee meeting.
The Committee did a final review of the Wentland Assessment Roll
and Engineers report and established the rate of interest to be
8% and the installment plan in accordance with the Sewer
Assessment Policy. This project will be financed through the
Sewer Utility and the Utility will be reimbursed at a future
borrowing. The above conditions will also be in effect for the
two properties in the Wentland Addn. No. 1 project.
The estimate and timetable for the installation of the grinder
pump for the Oakhill Estates Sewer Project was deferred until
information is received from the contractor.
Mayor Salentine updated the Committee on the status of FLOW.
Contracts for the upgrading of the Lift Station have been signed.
Ite Committee reyiewed the status of the Northeast Pump Station
Is an onment and it was noted that they are waiting for more fill.
•
•
Public Sewer Committee - Page 2
June 18, 1987
The Committee reviewed corresondence from the Sewer Utility Clerk
in regard to the Ludwig/Strampe properties on Kurtze Lane that
have not connected to the sewer system. It was noted that the
connection fees for the two properties have been paid but a
plumbing permit has not been taken out. Ald. Dumke moved to
direct the Building Inspector to secure quotes for forced hook-up
for the two properties to be reviewed at the July Public Sewer
Meeting. Seconded by Ald. Hilt, motion carried. The property
owners had applied to the State for a permit to service both
homes with a single lateral and that permit has been received.
The Committee reviewed corresondence from the City Engineers
regarding the Adrian Heights Subdivision. The Committee directed
the Mayor to verify that the property in question is within the
contract service area of MMSD.
Ald. Dumke moved to approve sewer extension plans for Tans Drive
(Richard Zach Development). Seconded by Ald. Hilt, motion
carried.
Ald. Hilt moved to approve sewer extension plans for the proposed
Woodcrest Height Subdivision. Seconded by Ald. Dumke, motion
carried.
The Committee reviewed the Utility Plant Operator's report and
placed on file.
The meeting adjourned at 9:00 P.M.
ca
Respectfully submitted,
Ald. Edwin P. Dumke
Secretary
p
|
--���0- -- --------� ����
-'-'-------- --------'------------------ -
'---------- 7 ----------- --�------------'---'--