PWAM198605150 PUBLIC WATER COMMITTEE - CITY OF MUSKEGO
MINUTES OF MEETING HELD MAY 15, 1986
The meeting was called to order at 7:00 P.M. by Chairman Hilt.
Also present were Committee Member Patterson, Mayor Salentine,
Willard Bertram, Ald. DeAngelis and Dale Lofquist. Ald. Dumke
was absent.
Highway Superintendent Bertram reported that the stuck water
valve located in the Industrial Park has been repaired.
The projected water service area map that was supplied by City
Engineer Ken Ward was reviewed. The report recommended that the
Committee proceed in having all wells that have a potential of
being connected to the Water Utility tested for purity as well as
radium. Ald. Patterson moved to direct the City Engineers to
test the wells in Guernsey Meadows, Kristin Downs, Bay Lane
School, Muskego High School, Freedom Square, Sentry, Anamax and
Pioneer Center. Seconded by Ald. Hilt, motion carried.
Mr. Dale Lofquist appeared before the Committee requesting water
service to the north of the projected service area. A petition
was before the Committee on September 10, 1985, wherein they
• requested to be included in this area. At this time it is
questionable whether the present water tower being serviced by
the two existing connected wells have the capability of serving
this request. It was noted that the connecting of additional
wells could expand the immediate service area.
Ald. Patterson moved to recommend that the future billing for
water service be done on a quarterly basis. Ald. Hilt seconded,
motion carried.
The survey letter to be sent to the residents listed in the Waste
Management agreement was approved and the Clerk is requested to
mail to the affected residents. This letter will obtain the
necessary information to finalize specifications for bidding the
project.
The Committee is interested in providing water service to the
Hillendale request and extending the water service east on
Highway 24 to include Bay Lane School. Ald. Hilt moved to
request the Finance Consultant to determine the feasibility of
providing a deferred assessment on large parcels of undeveloped
land when watermains are extended past such property. Seconded
by Ald. Patterson,.motion carried.
The water tower is being drawn down so that painting can
40 commence.
Public Water Committee - Page 2
May 15, 1986
Superintendent Bertram reported that Enders Construction Co. had
placed additional fill in the area of the water tower at a cost
of $700. The Committee agreed that the decision to have the
grading done by Enders was timely since their construction
equipment was available.
The Committee noted that they were in agreement with installation
of the additional 30 feet of storm sewer pipe recommended by Na-
Con Services, Inc. in the amount of $360.00.
The meeting adjourned at 8:20 P.M.
ca
•
•
Respectfully submitted,
Ald. Patrick Patterson
Secretary