Loading...
PWAM19860410• PUBLIC WATER COMMITTEE - CITY OF MUSKEGO MINUTES OF MEETING HELD APRIL 10, 1986 The meeting was called to order at 7:00 P.M. by Chairman Hilt. Also present were Committee Member DeAngelis, Mayor Salentine, Chief E. J. Salentine (Tess Corners Volunteer Fire Dept.), Mrs. E. J. Salentine, Mr. Carl Mack (Muskego Volunteer Fire Dept.), Mr. Dan Butler (Ruekert & Mielke) and Financial Consultant Seegar Swanson. City Engineer Butler presented a written report which contained the following information: 1. Elevated Tank 2. Controls for operating of tower 3. Water Main to Waste Management 4. Certified Waterworks Operator 5. Water Rates 6. Ordinance Establishing Water Utility 7. Stuck Valve in Industrial Park Financial Consultant Swanson presented a written financial report listing four options for front foot assessments and MAC charges. After considerable discussion, the Committee • recommended for the Public Hearing a $16.00 per front foot assessment for Commercial & Industrial and a $14.00 per front foot assessment for Residential, with a MAC (Minimum Assessment Connection) charge of $475. The MAC equals meter size and type of 3/4" disk - 25 gallons per minute. The Committee directed Supt. Bertram to dig up the area in the vicinity of the Water Tower so that the stuck valve problem can be reviewed. Engineer Butler stated that the High Radium Counts were not a problem in the construction of Muskego Water Utility. He indicated that a deeper well drilled in a soft sandstone could have radium problems such as some subidivision wells. Engineer Butler indicated that the tower was filled and sanitized and that water could be consumed at this time. At a later date the tower will be emptied, sandblasted, painted and sanitized for permanent use. He estimates it will be from four to six weeks. New controls still have to be installed to operate well pump. Old control system will be replaced. The Highway 24 to Crowbar Water Project field work is being completed and the Bid date will be set for early July 1986, with completion scheduled for September 1986. The estimated cost will be $500,000 for the water extension to Crowbar. • Public Water Minutes - Page 2 April 20, 1986 The City of Muskego must have its own Certified Waterworks Operator. Ruekert & Mielke will have one of their engineers cover the operation until a City person is certified. This is in accordance with DNR regulations. The Tess Corners Fire Department representative Carl Mack, and Muskego Volunteer Fire Department representative Chief E. J. Salentine discussed fire protection, water pressures, fire hydrants, places to fill trucks, etc. The minutes of the previous meeting were reviewed and placed on file. The meeting adjourned at 9:30 P.M. • ca • Respectfully submitted, Ald. Frank DeAngelis Secretary