PUM20030818CITY OF MUSKEGO Approved
PUBLIC UTILITIES COMMITTEE MEETING
Minutes of Meeting Held Monday August 18, 2003
Chairman Eric Schroeder called the meeting to order at 7:07 p.m. Also present
were Committee members Aid. Rick Petfalski (7:28 PM), Aid Pat Patterson,
Utilities Superintendent Scott Kloskowski, Engineer and Building Inspection
Director Sean McMullen, Ruekert & Mielke representative Steve Schultz, and
those per attached list.
It was noted that the meeting was posted in accordance with the Open Meeting
Law.
Those present recited the Pledge of Allegiance.
APPROVAL OF MINUTES OF PREVIOUS MEETING
Aid. Patterson moved to approve minutes of July 21, 2003. Seconded by
Aid. Schroeder, motion carried 2-0.
STATUS OF PROJECTS
Ruekert-Mielke representative Steve Schultz updated the committee on the
attached status of on -going projects as follows:
• Janesville Road Water Main — Project complete, some paving and
restoration remain. Field data collection for record drawings started
July 315t, 2003.
• Freedom Square Water Project —Bids open on August 21st, 2003.
This item will be taken off the agenda and will be replaced with
Parkland Drive Water Project. The City has closed with Freedom
Square and is operating.
Status on potential impacts to Well #7/Stonebridge Groundwater
Remediation — Contact at the water section of the EPA has stated if
things do not get moving he will step in and declare an emergency.
Then the water supply group at the EPA will take over and they will
say the monitoring wells will go in and action will be taken.
• Well Site Exploration — Geophysical surveys will be conducted on
additional sites after harvest. Well site investigation report and
specifications are being prepared for DNR submittal and bidding in
Public Utilities Committee Meeting — August 18, 2003 Page 2
fall. A start should begin on the test well in late fall, early winter.
Early next year a permanent well should go in.
• Chamberlain Hill — DNR approval for moving of booster station from
Hillendale to Chamberlain Hill.
• Prairie Meadows — Road construction will be completed in
September. Curb was installed August 18', 2003.
Stonebridge Subdivision — Second plan review completed August
8, 2003 and delivered to City.
SEWER UNFINISHED BUSINESS
Status of Town of Norway Contract - Nothing new to report.
Review Accruing Deferred Assessment Interest report from Finance Director —
The Committee reviewed the report from the Finance Director. Ald. Petfalski
explained he is satisfied with the procedure but would like an explanation on the
interest rate. He further explained that if the City is borrowing at a rate of 2%
why do we charge 8%? Aid. Petfalski moved to defer and requested a
recommendation from the Finance Director as to what amount of increase
is added to the rate the City borrows for. Aid. Patterson seconded. Motion
carried.
Status of reouests from West Lake. Lake Lore and Lake Brittanv— Mr. Schultz
reviewed with the Committee the Report on the Water Levels Changes in Lake
Brittany, Lake Lore and West Lake. Mr. Schultz informed the Committee of the
four monitoring wells throughout southeastern WI that were studied, they
averaged three feet below normal levels. Based on the information in the report
the dewatering had zero significance on the lakes and is consistent with the drop
in water well levels and regional lakes. This report has been forwarded to the
USGS for review. The USGS should have their report done by the end of
September.
Further discuss Jacobus claim — Mr. and Mrs. Jacobus were present to discuss a
letter received from Superintendent Kloskowski. The City previously asked the
Jacobus' to put their house for sale for 120 days. Mr. Jacobus stated he never
had an offer due to sewer backup. Cheryl Endter, the Jacobus' current realtor,
was present and stated because of the sewer back up there was no interest. Ms.
Endter stated no one would be willing to sign a release to the City that if there
was another sewer back up the City would not be liable. Superintendent
Kloskowski clarified that the City has never asked for a release to be signed.
Superintendent Kloskowski explained the agreement in the past was for the
Jacobus' to have an appraisal done and bring that back to the City. The City first
Public Utilities Committee Meeting — August 18, 2003 Page 3
now received the appraisal from the Jacobus' attorney. Superintendent
Kloskowski stated the City Assessor agrees to this appraisal and does not feel
another appraisal is necessary. It was never guaranteed by the City that the City
would pay the difference of any offer the Jacobus' received. The McShane
Storage Facility was built to alleviate future sewer backups. Mr. Jacobus
introduced Tony Raymond, who is considering making an offer to purchase the
house. Mr. Raymond explained he would like to repair the one wall and is
considering lifting the house. Director McMullen stated the City would not object
to making the house higher and would be willing to meet with Mr. Raymond to
discuss. Ald. Schroeder explained that the City would not require Mr. Raymond
to sign a release to the City. Mr. Raymond stated he would take this into
consideration and discuss with his brother who would be purchasing the house
with him. Superintendent Kloskowski noted that at the time, the Committee felt
the Jacobus' could sell the property within 120 days. He also noted that the
house across the street with the same damage sold within two weeks. Aid.
Petfalski moved to deny the claim. Aid. Patterson seconded for
discussion. The Committee could not justify paying the Jacobus' when the City
has no liability, and the City would not do this for everyone else. Upon voice
vote motion carried 3-0.
SEWER NEW BUSINESS - None
111% WATER UNFINISHED BUSINESS None
WATER NEW BUSINESS
Discuss marking of fire hydrants — Superintendent Kloskowski explained that
every year at the request of the Fire Department the Utility Department is asked
to paint of 20 foot stripe in front of all the fire hydrants. Last time it was done the
residents of the newer subdivisions were upset. It is part of the ordinance and if
the Committee did not want it done the ordinance would have to be re -written.
Director McMullen is in the process of rewriting the ordinance. Superintendent
Kloskowski stated Fire Department feels it helps them locate the hydrant. In a
subdivision the fire hydrants are not more than 10 feet off of the road, but in rural
areas they could be set back much farther. Aid. Patterson suggested having the
markings consistent throughout the City. The Committee would like a
representative from Tess Corners and Muskego Fire Deparments invited to the
next meeting. Director McMullen will send a letter to both Fire Departments and
if they are unable to attend the City is requesting a letter with their
recommendations. Aid. Patterson moved to defer. Aid. Schroeder
seconded. Motion carried unanimously.
Discus Lakewood Meadows Feasibility Study — Mr. Schultz reviewed with the
Committee a letter dated August 11, 2003 on the Lakewood Meadows Feasibility
Study. Mr. Schultz explained that the study consists of an inventory of the
existing system and physical condition. Also, a value of repairs on the existing
Public Utilities Committee Meeting — August 18, 2003 Page 4
(% system was studied. The study looked at the water quality and compared that to
the City's standards. Superintendent Kloskowski noted that if the City were to
take the system over it would run as a stand alone system. Tannins were found
in the water, but are not a health hazard. In conclusion the well pumping station
and reservoir are in good condition. Routine maintenance and record keeping
has occurred. Deficiencies are: roof peak shingles are missing, leaving peak and
venting unprotected, exterior metal door and frame need repainting, interior
piping needs repainting. Superintendent Kloskowski stated he does not see a
downside. There will be maintenance but for the most part the system looks
good. Superintendent Kloskowski further explained the City will be gaining users
and the area could possibly expand. The City will take all requests to take over
water trusts on a case -by -case basis. Aid. Petfalski moved to invite residents
to Lakewood Meadow water trust to further discuss. Seconded by Aid.
Schroeder. Motion carried 3-0.
Review water main (Mystic Drive) — Quietwood South — Director McMullen stated
on the Mystic Drive CSM there are 5 units being serviced by an 8" main. A 1.25"
service is needed for an existing home. It can be serviced only off of Mystic.
Aid. Petfalski moved to approve. Seconded by Ald Patterson. Motion
carried 3-0.
SUBDIVIDER'S EXHIBTS - None.
I`TA
ACCEPTANCE OF IMPROVEMENTS — Nothing to report.
REVIEW OF DEFERRED ASSESSMENTS/SEWER & WATER — None.
ACCEPTANCE OF IMPROVEMENTS — Discussion, update and possible action
may be taken on any or all of the following:
REPORT OF THE UTILITY SUPERINTENDENT — Nothing to report.
— Nothing to
report.
COMMUICATIONS AND ANY OTHER BUSINESS AS AUTHORIZED BY LAW
— None.
Aid. Patterson moved to adjourn at 9:32 PM. Seconded by Aid. Petfalski,
motion carried 3-0.
Respectfully submitted,
eEw-
Kellie Renk, Recording Secretary
CONSULTANTS REPORT FOR:
Public Utilities Committee Meeting —August 18, 2003 Page 5
' PUBLIC UTILITIES COMMITTEE
Monday August 18, 2003
Submitted August 13, 2003
BOLD ITALICS INDICATE NEW INFORMATION
CITY PROJECTS:
FREEDOM SQUARE WATER SYSTEM
First floor elevation of pump house has to be more than 2 feet above regional flood.
Working on proposal to modify Freedom Square pond outlet to lower this elevation.
DNR will allow facilities to be acquired by easement (August 1, 2002)
Utility Superintendent forwarded easements to Condo Association to obtain from
Parkland Development Group
Connection approved by DNR October 30, 2002
Revised easements submitted to City April 10, 2003 for connections to Parkland Drive
Parkland Drive water main plan approved by DNR
Final plans and bidding documents submitted for City review Julyl 1, 2003
City is discussing water main vault by pass through Blockbuster parking lot
Bids open August 21, 2003 at 11 AM
JANESVILLE ROAD BOX CULVERT UTILITY RELOCATES
Design alternate selected August 28, 2002
County does not anticipate box culvert reconstruction prior to Fall 2003
Design to be sent to City for review by May 15, 2003
After City review, plans must be sent to County and State for approvals
Plans sent to County for review June 4, 2003
JANESVILLE ROAD WATER MAIN — JEWEL-OSCO TO COLLEGE AVENUE
City authorized design to College Avenue September 12, 2002
Plans for entire project to be submitted by January 17, 2003
Project revised to be from Kohl's to 1000 feet East of Tess Corners Drive
Potential contaminated soils discovered on site June 6, 2003, BLS Environmental
retained to assist City.
Additional contaminated soils encountered week of July 7, 2003
Project complete, some paving and restoration remain
Field data collection for record drawings started July 31, 2003
Mc Shane Pump Station — Bluhm Drive Storage Facility
Start up completed
Site grading and punch list items in process
Storm sewer and road installation completed
Post construction well level monitoring complete
Restoration by seeding completed Need substantial grass growth
Project close out paperwork in process
Request for USGS review of declining groundwater levels to be sent August 15
I PAGE 2
Consultant's report for
Public Utilities Committee Meeting — August 18, 2003 Page 6
O"N PUBLIC UTILITIES COMMITTEE
Monday August 18, 2003
Moorland Road Water Main
Sample by City tested safe
Punch list repairs completed
Well Site Exploration
Contract for exploratory wells to Layne Northwest
Test borings completed in Woods Road area
Geophysical surveys conducted at Big Muskego Estates site
Three exploratory wells drilled in Big Muskego Estates area week of March 3, 2003,
Additional resistivity tests completed Quietwood East
Geophysical surveys will be conducted on additional sites after harvest
Well site investigation report and specifications being prepared for DNR
submittal and bidding in Fall
DEVELOPMENTS:
Big Muskego Estates
First review letter sent to City March 6, 2003
Second review letter sent to City April 8, 2003
CANDLEWOOD (INTERIOR)
Repairs completed, manhole now passed tests.
Chamberlain Hill
Design engineer picked up print of sanitary system map August 6 for design use
Initial plan review completed January 28, 2003
A portion of this project was determined to be in the boosted pressure area on April 2,
2003
Site grading has begun
Underground utility construction to begin the week July 15, 2003
DNR approval received August 1, 2003
LAKEWOOD CONDOMINIUMS (OVERLOOK BAY)
Punch list repairs completed
Record drawings for sanitary sewer submitted to MMSD November 14, 2002
Storm water system record drawings submitted to City, pending location of pond outfall
south of building number 4
Quietwood Creek Fast
First design review letter submitted on August 22, 2002
Second design review letter submitted on December 3, 2002
Final design review letter submitted January 09, 2003
Utility installation on hold pending final plat
Underground utility construction began July 7, 2003
PAGE 3
I Consultant's report for
PUBLIC UTILITIES COMMITTEE
Public Utilities Committee Meeting — August 18, 2003 Page 7
t"N Monday August 18, 2003
Prairie Meadows Estates
Construction continues.
Sanitary sewer installed, storm sewers installed, road installation required prior to sump
discharge line installation and final adjustments to the sewers
Road construction completed August 1, 2003
Waiting for sump discharge line installation
Reserve at Champions Village
Sanitary and Storm sewer main and water mains installed
Resubmitted sanitary sewer and water main record drawings to City August 1
Storm sewer record drawings submitted to City August 1, 2002
Punch list repairs completed.
Riverview Court
Utility installation completed and tested as of October 7, 2002 except for vacuum test on
sanitary manhole number 8
Second punch list sent to contractor on November 19, 2002
Field survey for record drawings completed December 3, 2002
Water main locator wire continuity test completed
Sanitary manhole 8 still has not passed vacuum test
Final record drawings submitted to City March 10, 2003
Manhole repaired and past test, late May 2003
' Rosewood Estates Addition Number 1
Utility construction completed February 21, 2003
Road paved week of July 7
Sump lines installed
SAL FERRITO SEWER (PRIVATE SANITARY SEWER)
DEWATERING WELL NOT REMOVED
LATERALS NOT CONNECTED YET
SARAH ESTATES (WOODS ROAD
Record drawings for Sanitary Sewer submitted to MMSD November 14, 2002
Storm Sewer record drawings on hold until adjustments before surface course paving
Punch lists are completed.
Stonebridge subdivision
Second plan review completed August 8, 2003
13-00000.010
SIGN -IN SHEET FOR CITY MEETINGS
PLEASE PRINT YOUR NAME AND AGENDA ITEM BELOW. THANK YOU.
,C ( �U'
Date: s
#ll�/V J, * `t- sub