PUM20030120CITY OF MUSKEGO Approved
PUBLIC UTILITIES COMMITTEE MEETING
Minutes of Meeting Held Monday, January 20, 2003
Chairman Eileen Madden called the meeting to order at 7:06 p.m. Also present
were Committee' members Aid. Rick Petfalski, Aid. Eric Schroeder, ,
Engineering/Building Inspection Director Sean McMullen, Public Utilities
Superintendent Scott Kloskowski, Ruekert & Mielke representative Steve
Schultz, Mayor Mark Slocomb, Aid. Butch Le Doux, and Mr. Randy St.
Lawrence (Lake Meadows Water System).
It was noted that the meeting was posted in accordance with the Open Meeting
Law.
APPROVAL OF MINUTES OF PREVIOUS MEETING
Aid. Petfalski moved to approve minutes of special Joint Public
Works/Public Utilities Committee meeting of April 9, 2002, which had been
approved by the Public Works Department but had been omitted by the
Public Utilities Committee, and the minutes of the Public Utilities
Committee of December 16, 2002. Seconded by Aid. Schroeder, motion
carried 3.0.
• The recording secretary read the notice of closed session.
STATUS OF PROJECTS
Ruekert & Mielke representative Steve Schultz updated the committee on the
attached status of on -going projects as follows:
• Janesville Road Water Main Project — The plans have been completed
and submitted. Bid Opening will be February 15, 2003.
• McShane Storage Facilities — Backfilling and exterior water -proofing has
now been completed. Wells are all shut off and level of West Lake has
now gone down a foot. Small building walls are up as well as interior
masonry walls for the bathrooms.
• Jewel-Osco/Kohls Offsite water main — All punch list items completed and
project can be closed if acceptable to the City.
• Quietwood Creek East — Final design review letter submitted January 9,
2003.
. Well Explorations Project — Phase I testing has been done by Ruekert &
Mielke on the Big Muskego Estates site and results verified the depth of
Public Utilities Committee Meeting — January 20, 2003 Page 2
the sand and gravel deposits. On the lake side it is approximately 180 ft.
and doesn't go up too much as you go further east. This is a good
potential for a well site. They also did some further testing to be able to
distinguish between clay and nonclay layers. This data is being
interpreted now and there will be a report by next meeting.
Status on potential impacts to Well #7/Stoneridge Ground Water
Remediation — The owners of the landfill have agreed to most of the items
that the City is requiring. The landfill owners have gone back to the EPA
to ask for alternatives on one type of well construction that has been
recommended by Ruekert & Mielke.
Engineering/Building Director Sean McMullen reported on the following projects:
• SEWRPC's 208 Plan Amendments — Blattner property was approved by
MMSD and SEWRPC to be included into the sewer service area. The
process is now being started to secure approval for the May property.
Hope to receive approval around the 15th of March.
SEWER UNFINISHED BUSINESS
Status of Town of Norway Contract - Mayor Slocomb advised the committee that
he has been conferencing with City Attorney Stan Riffle regarding the contract.
Attorney Riffle has been in contact with the Town of Norway and it has been
suggested that a meeting be scheduled to see if an agreement can be reached
prior to it going to circuit court.
Further review of Sewer Backup Manual — Utility Superintendent Scott
Kloskowski advised the committee that he will be working with the City Clerk and
city staff to come up with a hand-out that is simplistic and can be given to any
resident, in the future, that experiences a sewer backup. This handout would
explain, in detail, the insurance claim steps to be taken if a backup ever occurs.
Scott felt he should have something for committee review for the February
meeting.
Review 2002 sewer bill/Stoney Creek — Utility Superintendent Scott Kloskowski
explained that at the November 18, 2002 meeting, the committee agreed to give
the complex some relief because of the excessive gallons used for the P quarter
as a result of grass wateringy. At that meeting, Aid. Petfalski had requested that
the committee review the 4t quarter usage report when compiled. The
committee reviewed usage and placed on file.
SEWER NEW BUSINESS
Review MMSD & Town or Norway 4th Quarter Billing for 2002 - The committee
is reviewed and placed on file.
Public Utilities Committee Meeting — January 20, 2003 Page 3
Review MMSD Capital Charges — The committee reviewed and noted the
increase in capital charges. Utility Superintendent Scott Kloskowski explained
the increase from last year that was expected. When MMSD does water course
work that we are not attributed to, we receive a credit. They did less watercourse
work so we received a smaller credit. The report was placed on file.
Review Amended Final Sewer Resolution to refund for lateral (Lana Prooertv) —
Building/Engineering Director Sean McMullen explained that while compiling
information for the final review of Subdivider's Agreement and Letter of Credit for
the Lang Property, it came to his attention that they were charged for a 6" sewer
lateral for their property which was not installed. Aid. Petfalski moved to
recommend Common Council to do a Third Amended & Revised Final
Assessment resolution to delete the one 6" lateral for the Lang Property,
and refund the $3,140.40 Seconded by Aid. Schroeder, motion carried 3-0.
WATER UNFINISHED BUSINESS
Status of Request to PSC for water rate change — Utility Superintendent Scott
Kloskowski advised that the formal request has been sent to the PSC and the
City has received confirmation of this request. There is a lot of work to be done
and he feels that it will probably be at least three to four months before we
• receive information. Presently the increase looks to be about 20%. That is less
than originally anticipated.
Further review of agreement with Freedom Square Condominium — Utility
Superintendent Scott Kloskowski reported that he has received signed waivers
from a majority of the owners and feels that we are ready to formally sign
agreement realizing that there is one easement that is still required. Aid.
Petfalski moved to have the City Attorney proceed with the necessary
paperwork for the Utility to formally take over the water system. Seconded
by Aid. Schroeder, motion carried 3-0.
Status of WCA 10 District and water extension aareement with Towne Realtv —
The WCA 10 and water extension has been approved. A copy has been sent to
Attorney Molter's office and to Towne Realty. City is now waiting for a draft copy
of a Letter of Credit and a fully executed agreement. Looking at a late February
2003 bid date. Sean also advised that they are proposing to schedule a March
6th informational meeting to bring all of the affected property owners on Durham
Drive to discuss this project. This informal meeting is tentatively being scheduled
for 6:30 PM.
WATER NEW BUSINESS
' Review comments from the Informational Meeting for proposed Pioneer Drive
Water Project — Utility Superintendent Kloskowski advised that the general
Public Utilities Committee Meeting — January 20, 2003 Page 4
• consensus of property owners at the meeting was that there were not interested
in connecting to the municipal water utility. He advised that there is one property
owner, Willow Apartments, who are interested. Sean will contact them and
discuss a possible single connection.
Review radium standard compliance — Utility Superintendent Scott Kloskowski
and Steve Schultz, representative from Ruekert & Mielke, discussed with the
committee the need for a response letter to be sent to the DNR replying to their
notice of noncompliance with the Utility's radium standard. The draft letter to the
DNR explains the City's intent to abandon wells #4 and #6 as soon as a new
shallow well can be constructed and to use well #5 as an emergency well. The
letter also includes a timeline and states that the Utility would be agreeable to a
consent order using the timeline that will meet the 2006 deadline. Aid. Petfalski
moved to direct Utility Superintendent Scott Kloskowski to send letter to
the DNR requesting consent order. Seconded by Aid. Schroeder, motion
carried 3-0.
DEVELOPMENT EXHIBITS
Redman Development— Engineering/Building Inspection Director Sean
McMullen reviewed the water and sewer plans for this proposed development for
four (4) commercial properties and 55 units of duplex assisted senior living along
. the existing Moorland Road corridor. Aid. Petfalski moved to approve the
plans, as submitted, and to send plans to MMSD and DNR for approval.
Seconded by Aid. Schroeder, motion carried 3-0.
Quietwood Creek East— Engineering/Building Inspection Director Sean
McMullen reviewed the second rendition of water and sewer plans for this
proposed development noting that the project has been scaled back for the
original submittal. Aid. Schroeder moved to approve the plans, as
submitted, and to send plans to MMSD and DNR for approval. Seconded
by Aid. Petfalski, motion carried 3-0.
REPORT OF UTILITY SUPERINTENDENT — Utility Superintendent Scott
Kloskowski discussed with the committee the proposed informational meeting
scheduled for Monday, February 17, 2003, at 5:30 PM in the Muskego Room,
lower level of City Hall, to discuss a possible water project on Janesville Road,
Golden Country to College Avenue. He explained that he felt it would be good to
keep the affected property owners aware of the status of the proposed water
project that will be part of the TO district and paid for by Tax Incremental
Funding if it becomes a viable project.
REPORT OF ENGINEERING/BUILDING INSPECTION DIRECTOR—
Engineering/Building Inspection Director Sean McMullen advised the committee
' of a request that he has received from Mr. Charles York, S71 W19288 Hillview
Drive. Mr. York has been requesting municipal water service for a couple of
Public Utilities Committee Meeting — January 20, 2003 Page 5
• years and his second well is now starting to fail. Steve Schultz, Ruekert &
Mielke, advised that there is some grant funding available from the State for
situations like this where an elderly individual is on a fixed income and he will
send the materials to Sean so that he can give to the resident.
Aid. Petfalski moved convene into Closed Session pursuant to State
Statute 19.85(1)(e), Deliberating or negotiating the purchasing of public
properties, the investing of public funds, or conducting other specified
public business, whenever competitive or bargaining reasons require a
closed session; more specifically possible purchase of property for well
site. Seconded by Aid. Madden, motion carried 3-0.
Aid. Petfalski moved to reconvene into open session at 8:39 PM. Seconded
by Aid. Schroeder, motion carried 3-0.
Aid. Petfalski moved to adjourn at 8:40 PM. Seconded by Aid. Schroeder,
motion carried 3-0.
Respectfully submitted,
� hie MZnxderson
• Recording Secretary
J
Public Utilities Committee Meeting — January 20, 2003 Page 6
' CONSULTANTS REPORT FOR:
PUBLIC UTILITIES COMMITTEE
Monday January 20, 2003
Submitted Tuesday January 14, 2003
BOLD ITALICS INDICATE NEW INFORMATION
CITY PROJECTS:
FREEDOM SQUARE WATER SYSTEM
Design plans cannot be located by City or Freedom Square
Easements submitted to City for review and action week of May 13°i
First floor elevation of pump house has to be more than 2 feet above regional flood
elevation. Working on proposal to modify Freedom Square pond outlet to lower this
elevation.
DNR will allow facilities to be acquired by easement (August 1, 2002)
Utility Superintendent forwarded easements to Condo Association to obtain from
Parkland Development Group
Connection approved by DNR October 30, 2002
JANESVILLE ROAD BOX CULVERT UTILITY RELOCATES
Cost estimates to be submitted to City week of February 18
Estimates and design alternatives submitted to City for review February 21, 2002
Design alternate selected August 28, 2002
• JANESVILLE ROAD WATER MAIN — JEWEL-OSCO TO COLLEGE AVENUE
Preliminary field survey completed, Preliminary plans in progress
Preliminary design to 1000 feet east of Tess Corners Drive complete
City authorized design to College Avenue September 12, 2002
Additional survey completed
Plans for entire project to be submitted by January 17, 2003
First advertisement January 30, 2003
Bid opening February 13, 2003
MANHOLE REHABILITATION 2001
Project closeout paperwork and Final Payment Recommendation forwarded to the City
April 1, 2002
Martin Drive Relocation — Utility extensions
On hold pending WDNR Alternatives Analysis to Wetland impacts
DNR approvals received late November 2002
Mc Shane Pump Station — Bluhm Drive Storage Facility
Visible seepage leaks repaired, leak test completed Week of December 9, 2002
Discharge chamber walls poured, deck is being formed for casting
Tank concrete 99% complete
Exterior waterproofing complete
Backfill 85% complete
Control building walls and roof complete
•
Public Utilities Committee Meeting — January 20, 2003
Page 7
• Moorland Road Water Main
Sample by City tested safe
Punch list repairs in process
Well Site Exploration
Contract for exploratory wells to Layne Northwest to be executed soon
Four test borings completed
Working with City on planned development issues.
WOODS ROAD — BROOKE LANE TO EAST OF RACINE AVENUE
Project close out paper work sent to City July 25, 2002
DEVELOPMENTS:
CANDLEWOOD (INTERIOR)
Construction started July 26
Sanitary completed but not fully tested, water installed and tested
Storm sewer should be completed week of September 11
Sample test reports safe, wet connections completed
Punch list review after sump drains installed week of November 25, 2002
Punch list issued December 10, 2002 to Contractor for sanitary and water
Punch list for Storm sewer is pending cleaning of inlets by Contractor
Water and force main locator wire continuity tests completed
Chamberlain Hill
Design engineer picked up print of sanitary system map August 6 for design use
JEWEL — OSCO / KOHLS ONSITE UTILITIES AND LIFT STATION
Field change for the Lift Station relocation design changes completed and submitted to
City and Developer
Onsite construction completed and tested except for lift station
Punch list reviews to begin the week of September 12, 2002
Record Survey scheduled
All punch list items completed as of October 11, 2002
Water main locator wire continuity test not completed
Record drawings to be submitted week of December 11, 2002
Force main locator wire continuity test completed
JEWEL — OSCO / KOHLS Offsite water main
Record drawings submitted August 1, 2002 for City Staff review
Recheck of punch list items week of November 18, 2002
All punch list items completer) as of December 20, 2002
Project can be closed is acceptable to City.
LAKEWOOD CONDOMINIUMS (OVERLOOK BAY)
Punch list repairs completed
Record drawings for sanitary sewer submitted to MMSD November 14, 2002
Storm water system record drawings submitted to City, pending location of pond outfall
south of building number 4
Public Utilities Committee Meeting — January 20, 2003 Page 8
MUSKEGO CENTER/BERG
AS BUILTS COMPLETED
PUNCH LIST SENT TO CONTRACTOR
Ill • U• w :. e
PUNCH LIST RESENT TO CONTRACTOR
MMSD REVIEWED AS BUILTS FEBRUARY 2, 2000
CONTRACTOR TOLD R/M THEY WILL NOT COMPLETE DUE TO PAYMENTS
NOT RECEIVED
Nature Estates (Boehm— Woods Road)
Second plan review completed November 20, 2001
Revised plans received r/m January 16 for review
QUIETWOOD CREEK (CARITY)
Sanitary Sewer Record Drawings submitted to MMSD November 14, 2002
Storm Sewer record drawings resubmitted to City August 1, 2002
Quietwood Creels East
Design engineer picked up print of sanitary system map August 6, 2002 for design use
First design review letter submitted on August 22, 2002
Second design review letter submitted on December 3, 2002
Final design review letter submitted January 09, 2003
Prairie Meadows Estates
First plan review completed May 31, 2002
Second plan review completed June 2, 2002
RAUSCH SANITARY PRESSURE SEWER— WOODS ROAD
COMPLETED WEEK OF FEBRUARY 19Ta
Restoration is only remaining item.
Record drawings submitted to MMSD and City April 6, 2001
Reserve at Champions Village
Sanitary and Storm sewer main and water mains installed
Resubmitted sanitary sewer and water main record drawings to City August 1
Storm sewer record 'drawings submitted to City August 1, 2002
Punch list repairs completed.
Riverview Court
Sanitary Sewer System map submitted to MMSD July 24, 2002
Construction started week of August 27"'
Sanitary installed but not tested, water main installed working on laterals
Utility installation completed and tested as of October 7, 2002 except for vacuum test on
sanitary manhole number 8 and
Second punch list sent to contractor on November 19, 2002
Field survey for record drawings completed December 3, 2002
Water main locator wire continuity test completed
Rosewood Estates Addition Number 1
Public Utilities Committee Meeting — January 20, 2003 Page 9
• Construction plans received for review August 5, 2002
City picked up Sanitary Sewer System Map September 23, 2002
Saint Leonard's water main (East Tower Drive)
Construction completed
Punch list repairs in process
Locator wire tested Monday September 9, 2002
All punch list items completed
Record drawing sent to City for first review September 27, 2002
SAL FERRITO SEWER (PRIVATE SANITARY SEWER)
DEWATERING WELL NOT REMOVED
LATERALS NOT CONNECTED YET
SARAH ESTATES (WOODS ROAD
Record drawings for Sanitary Sewer submitted to MMSD November 14, 2002
Storm Sewer record drawings on hold until adjustments before surface course paving
Punch lists are completed.
VICTORIAN VILLAS
VIDEO OF SEWER NOT YET RECEIVED
City has hired Visu-Sewer
COMPLETED PROJECTS ONLY AWAITING MMSD APPROVAL OF RECORD
DRAWINGS (AS BUILTS):
CHAMPIONS VILLAGES —ADDITION 2 (PHASE THREE)
HOLTZ - ARROWOOD
KNUDSON FORCE MAIN
NORTH CAPE FARM
WISA FORCE MAIN — HILLENDALE DRIVE
13-00000.010