Loading...
PUM20010820CITY OF MUSKEGO Approved PUBLIC UTILITIES COMMITTEE MEETING Minutes of Meeting Held Monday, August 20, 2001 Acting Chairman Mark Slocomb called the meeting to order at the Municipal Garage at 5:30 p.m. for the purpose of viewing a sewer camera equipment demonstration performed by Cues, Inc. Also present was Committee member Aid. Rick Petfalski, Mayor David DeAngelis, Utilities Superintendent Scott Kloskowski, Building/Engineering Director Sean McMullen, Ruekert & Mielke representative Rich Eberhardt, and those per the attached list. Aid. Dave Sanders was absent. After the demonstration, the meeting convened at City Hall at 8:07 p.m. It was noted by Acting Chairman Slocomb that the meeting was posted in accordance with the Open Meeting Law. APPROVAL OF MINUTES OF PREVIOUS MEETING Aid. Petfalski moved to approve minutes of meeting held July 16, 2001 Seconded by Aid. Slocomb, motion carried. STATUS OF PROJECTS — Rich Eberhardt presented status of projects listed dated August 15, 2001 as attached. The Committee discussed correspondence from Pat Wohlers of Ruekert & Mielke relating to changing the service at the North Shore Lift Station from 240 volts to 480 volts. SEWER UNFINISHED BUSINESS Status of Town of Norway Contract/Current Sewer Rates — There was nothing new to report. Status of Sewer Metering — Utilities Superintendent Kloskowski reported that most required meters have been installed or property owners have contacted the City to notify that they have plumbers hired to do the installation. Status of MMSD Proposed Stormwater Rules — Building/Engineering Director McMullen updated the Committee on the proposed stormwater rules. Status of Alternatives for In -Line Storage at McShane Lift Station - Utilities Superintendent Kloskowski reported on the progress of this project. New cost estimates and five alternatives were reviewed. Storage volume, cost per gallon of storage, and total estimated project cost were reviewed for each alternative. Further Discussion on Acquisition of Sewer Televising Equipment/Review Quotes - The Committee discussed the demonstration of the Cues, Inc. • Public Utilities Committee — August 20, 2001 - Page 2 equipment which they had viewed earlier in the evening. It was decided that another demonstration should be scheduled for Friday, August 24, 2001 and that another Notice of Meeting should be given. SEWER — NEW BUSINESS Discuss Krause Deferred Sewer Assessment - North Cape Drive — Mr & Mrs. Chris Krause were present and were requesting that their deferred sewer assessment for their property (Tax Key #2257.993.002) be forgiven and that they be reimbursed for extra laterals. Aid. Slocomb moved to forgive deferred assessment if deed restriction barring any future divisions of this property and their parent's parcel if land swap is achieved. Aid. Petfalski seconded, motion carried 2-0. Review Ready -To -Serve Properties — The Committee reviewed list of properties provided by Sewer Utility Clerk dated 2001 Aid Slocomb moved to make no changes to list as provided. Seconded by Aid. Petfalski, motion carried 2-0. Review 2nd Quarter Sewer Usage Charge for Boldt — Tax Key #2165.978 — • Due to a leak discovered at the Boldt property, the Committee discussed billing for second quarter sewer usage. Documentation from Kowalkowski Plumbing was reviewed which explained the leak that was discovered. Aid. Petfalski moved to calculate sewer usage based on history from previous four quarters. Aid. Slocomb seconded, motion carried 2-0. Review Quarterly Bills for Town of Norway — The Committee reviewed 2nd quarter bill for 2001 for the Town of Norway in the amount of $62,346.70. Aid. Slocomb moved to approve payment in the amount of $62,346.70. Seconded by Aid. Petfalski, motion carried 2-0. Review Quarterly Bills for MMSD - The Committee reviewed 2nd quarter bill for 2001 for MMSD in the amount of $132,469.27. Aid. Petfalski moved to approve payment in the amount of $132,469.27 Seconded by Aid. Slocomb, motion carried 2-0. WATER UNFINISHED BUSINESS Status on Potential Impacts to Well #7/Status of Stoneridge Groundwater Remediation — Utilities Superintendent reported that Ruekert & Mielke have responded in writing to the Waste Management plan. • Status of Proposed Electrical Power Plants — Muskego/New Berlin — There was nothing new to report. • Public Utilities Committee — August 20, 2001 — Page 3 Status of Repainting of Water Tower - Utilities Superintendent Kloskowski reported that the contracts from the contractor are due back shortly and work is to commence in September Status of Freedom Square Water Service/Possible Inclusion in WCA District — Utilities Superintendent Kloskowski reported that a favorable response has been received from the Board of Directors of the Freedom Square Condominiums. Status of Proposed Janesville Road Water Project — Utilities Superintendent Kloskowski reported that a September 12, 2001 meeting date has been set and affected property owners will be invited to discuss the proposed project. Review of Water Study — Utilities Superintendent Kloskowski reported on the Preliminary Report submitted by Steve Schultz of Ruekert & Mielke. WATER NEW BUSINESS Discuss Water Assessment for Krogman's 1st Addition — Little Muskego • Lake Access Lot — Property owners responsible for payment of fees for Little Muskego Lake Access Parcel (Tax Key #2193.032.001) have requested that water assessment for this parcel be forgiven. Aid. Petfalski moved to forgive assessment if easements are given for sanitary and storm sewers on this lake access parcel located at the end of Center Drive. Seconded by Aid. Slocomb, motion carried 2-0. Determination on Municipal Water Requirement/Rosewood Addition — Utilities Superintendent Kloskowski explained how this requirement came about. Aid. Petfalski moved to not require municipal water for the nine lots in question. Seconded by Aid. Slocomb, motion carried 2-0. Review Disputed Sewer and Water Usage Bills — Maciolek — Utilities Superintendent Kloskowski reported to the Committee on the dispute regarding charges on sewer and water bills for the Maciolek property. Aid. Slocomb moved to defer Aid. Petfalski seconded, motion carried 2-0. It was noted that the 'Report of City Engineer" item should be changed to 'Report of Director of Building & Engineering on future Committee agendas. 0 • Public Utilities Committee — August 20, 2001 — Page 4 Ald. Pettalski moved to adjourn at10:20 p.m. Seconded by Ald. Slocomb, motion carried. Respectfully submitted, Scott Kloskowski Public Utilities Superintendent • L� 9 %eL Ca 61e /U�ryte AV eeu 2Popsav✓ 96b3 A). ape P-d 173co d., s &b c�T Ili-"o(s>h�.U/� Lv M2 s 7 (/ 7/ �(-4NkuoA J b f ��, bDi y>�� d07— 7V73 C94fer D,, !� t r� �\P G N q2 w l% a 57 441 `Qe r JV U c�•l5a- hl-1"119 n u.cLfr -, 4iarY 5fy vt r, 4 a k fir. 40 - K L( So9010- lLrcymu,,,,1 rK{ ��ro�Mcin�� Sub�JY�sar� m • CONSULTANTS REPORT FOR: PUBLIC UTILITIES COMMITTEE MONDAY, August 20, 2001 Submitted Wednesday August 15, 2001 BOLD ITALICS INDICATE NEW INFORMATION CITY PROJECTS: BOXHORN, RYAN, GROVEWAY CLOSEOUT BEING HANDLED BY THE CITY HIGHVIEW ACRES WAITING ON CHIMNEY SEAL REINSTALLATION HILLENDALE DR 1300 FT S TO 3500 FT S OF JANESVILLE RD Has the city processed final payment? MANHOLE REHABILITATION 2001 Resolving final quantities with contractor Project close out to follow. Mc Shane Pump Station — Bluhm Drive Storage Facility Design in process Low basement survey completed Met with contractor and supplier to discuss design and material options . NORTH SHORE LIFT STATION GENERATOR GENERAC, general contractor and supplier still working on finding solution to problem with phase outage detection. Options to resolve fault are limited to: 1) do nothing and physically check pump operations when alarms sound 2) replace grounded B power supply with three phase Letter sent to contractor WEPCO proposed changes to equipment NORTH CAPE ROAD / RYAN RD TO 500 FT N. OF BOXHORN DR. Construction continues. All pipeline construction completed WOODS ROAD — BROOKE LANE TO EAST OF RACINE AVENUE Project close out paper work sent to contractor DEVELOPMENTS: CANDLEWOOD (INTERIOR) Phase one plans have been reviewed. DYER EASEMENT — HILLENDALE DRIVE PUNCHLIST COMPLETED EXCEPT FOR RESTORATION RECORD DRAWING SUBMITTED TO CITY FEBRUARY 2 11 • PAGE 2 PUBLIC UTILITIES COMMITTEE Monday August 20, 2001 EPI LIFT STATION / FORCE MAIN Shop drawing submittal and approvals almost complete. Storage building - roof and trim installed Tracer wire repaired at old 36 Decks installed Contractor waiting for EPI internal sewer approval to make connection in wet well before finishing site grading and paving JEWEL — OSCO FORCE MAIN AND LIFT STATION Revised plans reviewed LAKEWOOD CONDOMINIUMS (OVERLOOK BAY) SAFE SAMPLE RECEIVED WET CONNECTION OF WATER MAIN WAS COMPLETED Paving recently installed, Field survey for record drawings scheduled MUSKEGO CENTER/BERG AS BUILTS COMPLETED PUNCH LIST SENT TO CONTRACTOR MUSKEGO MOTOR CAR CO PUNCH LIST RESENT TO CONTRACTOR • MMSD REVIEWED AS BUILTS FEBRUARY 2, 2000 CONTRACTOR TOLD R/M THEY WILL NOT COMPLETE DUE TO PAYMENTS NOT RECEIVED QUIETWOOD CREEK (CARITY) INTERNAL CONSTRUCTION CONTINUES RECORD DRAWINGS STARTED ON PORTIONS ALREADY PAVED. Punch list of leaks in manholes in Woods Road sent to Contractor. Janesville Road water main wet connection was made Internal road construction continues. Martin Drive, east of, and Columbine Court (now Burr Oak Court), sanitary sewer available for connections. Three additional riser repairs completer. Contractor is re -testing these lines Curb and gutter installed in rest of development. After pavement is installed survey and punch list inspections will be scheduled. RAUSCH SANITARY PRESSURE SEWER — WOODS ROAD COMPLETED WEEK OF FEBRUARY 19T" Restoration is only remaining item. Record drawings submitted to MMSD and City April 6, 2001 SAL FERRITO SEWER (PRIVATE SANITARY SEWER) DEWATERING WELL NOT REMOVED LATERALS NOT CONNECTED YET • PAGE 3 PUBLIC UTILITIES COMMITTEE Monday August 20, 2001 SARAH ESTATES (WOODS ROAD) Underground utilities installed except for water main connection in Parkland Drive and wet connections at Woods Road and Green Street VICTORIAN VILLAS VIDEO OF SEWER NOT YET RECEIVED City has hired Visu-Sewer COMPLETED PROJECTS ONLY AWAITING MMSD APPROVAL OF RECORD DRAWINGS (AS BUILTS): CHAMPIONS VILLAGES — ADDITION 2 (PHASE THREE) HOLTZ-ARROWOOD KNUDSON FORCE MAIN NORTH CAPE FARM WISA FORCE MAIN — HILLENDALE DRIVE • 0