PUM20010521CITY OF MUSKEGO PUBLIC UTILITIES COMMITTEE MEETING Approved Minutes of Meeting Held Monday, May 21, 2001 Acting Chairman Mark Slocomb called the meeting to order at 7:07 p.m. Present were Committee members Ald. Rick Petfalski and Ald. David Sanders (arrived 8:30 p.m.). Also present were Utilities Superintendent Scott Kloskowski and Ruekert & Mielke representative Rich Eberhardt. It was noted by Chairman Slocomb that the meeting was posted in accordance with the Open Meeting Law. Approval of Minutes of Previous Meeting Aid. Slocomb moved to approve minutes of meeting held April 23, 2001 Seconded by Aid. Petfalski, motion carried. Rich Eberhardt presented status of projects list dated May 16, 2001 as attached. SEWER UNFINISHED Status of Town of Norway Contract/Current Sewer Rates — There was nothing new to report. Status of Sewer Metering — Utilities Supt. Kloskowski updated the Committee on the status of meter installation for commercial/multi-family properties. Notices will be sent to property owners who have not had their meters installed. Status of MMSD Proposed Stormwater Rules — There was nothing new to report. Further Discussion on Claim from Zaharopoulos-Boxhorn/Groveway/Ryan Sewer Project — Ald. Slocomb, Utilities Supt. Kloskowski, and Bldg./Engineering Director Sean McMullen will meet with Mr. Zaharopoulos to discuss the situation. Aid. Slocomb moved to defer Seconded by Ald. Petfalski, motion carried. Status of Alternatives for In -line Storage at McShane Lift Station — Rich Eberhardt updated the Committee on the status of the project. The design work is ongoing. A letter will be sent to neighboring property owners requesting basement elevation measurements to facilitate setting the alarm at the proper height. Review of Connections/North Cape/Ryan & Loomis (Durham Hill Nursery/Possible Forced Hookups — Aid. Slocomb reported that Durham Hill Nursery currently has no plumbing facilities, but is now developing plans for installation of facilities. • Public Utilities Committee Minutes — 5/21/2001- Page 2 The Committee discussed connection of the Burke property at W125 S9782 North Cape Road (#2257.978.005). Aid. Slocomb moved to extend deadline for connection until the July meeting date. Seconded by Aid. Sanders, motion carried 3-0. The Committee discussed connection of the G.A.P of Wind Lake property located at W125 S9808 North Cape Road (#2257.976). The Committee directed that the Sewer Utility Clerk obtain a copy of the agreement from contactor who will be doing connection. NEW BUSINESS Review First Quarter MMSD Invoice — Aid. Slocomb moved to approve invoice from MMSD dated 5/25/2001 Seconded by Aid. Petfalski, motion carried 2-0. Review Amendment to the Regional Water Quality Management Plan (Plan Office) — Aid. Slocomb moved to approve. Seconded by Aid. Petfalski, motion carried 2-0. Review Town of Norway 1at Quarter 2001/Balance of 2000 — Aid. Slocomb • moved to approve invoice from Town of Norway dated 5/4/2001 in the amounts of $42,270.89 and $11,134.39. Seconded by Aid. Petfalski, motion carried 2-0. Acquisition of Sewer Televising Equipment — Committee discussed acquisition of sewer televising equipment. Funds are available from manhole rehab program for this purchase. Utilities Supt. Kloskowski will obtain further information for Committee review. WATER UNFINISHED BUSINESS Status of Potential Impacts to Well #7/Status of Stoneridge Groundwater Remediation — Rich Eberhardt discussed flow meter data for Stoneridge. Committee also discussed remediation plan which was sent to the EPA. Utilities Supt. Kloskowski requested a copy. Status on Proposed Electrical Power Plant — New Berlin — There was nothing new to report. Status of Repainting of Water Tower- Rich Eberhardt reported that Ruekert & Mielke in the process of drawing plans and specs with the intent to bid the project in June, 2001 • Aid. Sanders arrived. • Public Utilities Committee Minutes — 6/21/2001 — Page 3 Status of Water Rate Increase — Water rate increase to go into effect July 2, 2001 Aid. Slocomb moved to set 1 % as penalty charge. Seconded by Aid. Petfalski, motion carried 3-0. WATER — NEW BUSINESS Review Survey Results/Proposed Janesville Water Project — The Committee discussed survey results. It was decided that the Mayor's secretary should schedule a meeting during the month of September and invite property owners along Janesville Road from Moorland Road east to St. Paul's Church to discuss the issue further Discuss Freedom Square Water Service — Utilities Supt. Kloskowski reported that Freedom Square is looking into connecting their water system to the municipal water system. Ruekert & Mielke is investigating the value of their existing system. Aid. Petfalski moved to adjourn at 9:20 p.m. Seconded by Aid. Sanders, motion carried. Respectfully submitted, • Jean Zaremba Transcribing Secretary n U 06/09/01 11: 01 0 CITY OF MUSKEGO DPW/UTILITIES 4 262 679 4106 • CONSULTANTS REPORT FOR: PUBLIC UTILITIES COMMITTEF. �Q MONDAY, May 21, 2001 Submitted Wednesday May 16, 2001 BOLD ITALICS INDICATE NF_W INFORMATION CITY PROJECTS: BOXHORN, RYAN, GROVEWAY CLOSEOUT BEING HANDLED BY THE CITY HIGI-IVIEW ACRES WAITING ON CHIMNEY SEAL REINSTALLATION HILLENDALF. DR 1300 Fr S TO 3500 FT S OF JANESVILLE RD Has the city processed final payment? trf;t6iP4li;-E}R�-Wh-f=M4a°'�" . �,• ,,, � , s ,�� � ,. �v-�.."'"cam^-+".PFiF6�Fl�it&A46P1%I:ii N MANHOLE REHABILITATION 2000 CONTRACTOR HAS STARTED CLOSEOUT PAPERWORK PUNCH LIST TO BE REPAIRED IN SPRING • MANHOLE REHABILITATION 2001 Contracts sent to City Attorney for review. Under construction approximately 70 % complete While grouting caused a backup into 4 basements Contractor is working with residents to resolve damage repairs E•� u, -� r� I • U I C.trx rya tM-k,✓ Me Shane Pump Station — tiluhm Drive Storage Facility Design in process Low basement survey scheduled, owner informational letter sent out by City. NORTH SHORE LIFT STATION GENERATOR Updated punch list sent out March 12, 2001 Contractor said all will done by April 1, 2001 except for restoration (}grass) Contractor said Friday April 13 that he has not done the repairs, weather was not conducive to him completing punch list. Contractor was reminded that liquidated damages are adding up. The generator is on line and everything works, Waiting for Contractor to restore site. As of May 2"'f Contractor said the end of that week NORTH CAPE ROAD / RYAN RD TO 500 FT N. OF BOXHORN DR. Lateral stakes delivered. Construction started at Manhole 2, proceeding South first WOODS ROAD KURTZE LANE TO BAY LANE PltOJrCT MW26 99 • PROJECT CLOSE OUT PAPER WORK S'rARTED 06/06/01 11:03 CITY OF MUSKEGO DPW/UTILITIES 4 262 679 4106 001 PAGE PUBLIC UTILITIES COMMI'TTEL•' Monday May 21, 2001 WOODS ROAD BROOKE LANE TO FAST OF RACINE AVENUE CONTRACTOR REQUESTING FINAL PAYMENT DEVELOPMENTS: AVION ESTATES PUNCHLIST REMAINS CANDLEWOOD (INTERIOR) Phase one plans have been reviewed, CANDLEWOOD - WOODS ROAD WATER MAIN Some punch list items remain. CHAMPIONS VILLAGES - ADDITION 3 (PHASE FOUR) Punch list repairs completed DEER CREEK TWO PUNCH LIST SENT TO CONTRACTOR RESTORATION WAS DONL ADJACENT TO LAKE RIDGE • DYER EASEMENT - HILLENDALEDRIVE PUNCFiL1ST COMPLETED F,,XCEPT FOR RES'rORAT10N RECORD DRAWING SUBMITTED TO CITY FF,13RIJARY 2 EPI LIFT STATION I FORCE MAIN Shop drawing submittal and approvals almost complete. Construction continues force main is 9s% complete. Excavation for lift station has started. Contractor submitting for building permit for storage garage. Contractor is still waiting for delivery of valve for connection to force main. JEWEL- OSCO FORCE MAIN AND LIFT STATION PLANS AND SPECIFICATIONS ARE COMPLETE JEWEL -OSCO REVIEW OF LOCATION AND EXTERIOR OF GENERATOR BUILDING REQUIRED LAKEWOOD MEADOWS ADD NO 2 NOTHING NL•' W LAKEWOOD CONDOMINIUMS (OVERLOOK BAY) SAFE SAMPLE RECEIVLD WET CONNECTION OF WATER MAIN WAS COMPLETED LOUGHNEY/NETTESIIIEM (KELSFY DRIVE)/SALF.NTINL RESTORATION REMAIN RtCORO DRAWINGS SUBMITTED TO CITY AND TOWN OF NORWAY 11 06/09/01 11:04 CITY OF MUSKEGO DPW/UTILITIES 4 262 679 4106 D01 PAGE 3 PUBLIC UTILITIES COMMITTEE Monday May 21, 2001 MUSKEGO CENTER/BERG AS BUILTS COMPLETED PUNCH LIST SENT" t'O CONTRACTOR MUSKEGO MOTOR CAR CO PUNCH LIST RESENT 1'0 CONTRACTOR MMSD REVIEWED AS BUILTS FEBRUARY 2, 2000 CONTRACTOR TOLD R/M THEY WILL, NOT COMPLETE DUL TO PAYMENTS NOT RECEIVED QUIETWOOD CRL'EK (CARITY) INTERNAL CONSTRUCTION CONTINUES RECORD DRAWINGS STARTED ON PORTIONS ALREADY PAVED. Punch list of leaks in manholes in Woods Road sent to Contractor. Janesville Road water main started Internal road Construction started. RAUSCH SANITARY PRLSSURL SEWER— WOODS ROAD COMPLETED WEEK OF FEBRUARY 19T" Restoration is only remaining item. Record drawings submitted to MMSD and City April 6, 2001 ROSEWOOD ESTATES (FORMERLY WOODGATE ESTATES) POST PAVING PUNCFILIST (UNDERGROUND) COMPLF%D SAL FERRITO SEWER (PRIVATE_ SANITARY SEWER) DEWATERING WELL NOT REMOVED LATERALS NOT CONNECTED YET SARAH ESTATES (WOODS ROAD) Plans recommended for approval March 13, 2001 Site grading continues. VICTORLAN VILLAS VIDL'O OF SEWER NUT YET RECEI VED COMPLETED PROJECTS ONLY AWAITING MMSD APPROVAL OF RECORD DRAWINGS (AS B ULI.TS): CHAMPIONS VILLAGES — ADDITION 2 (PHASE THREE) HOLTZ•ARROWOOD KNUDSON FORCE MAIN NORTH CAPE FARM WISH FORCE MAIN —HILLENDALE DRIVE 0