PUM20010319PUBLIC UTILITIES COMMITTEE MEETING - CITY OF MUSKEGO Approved
Minutes of Meeting Held Monday March 19, 2001
Chairman David Sanders called the meeting to order at 7:03 PM. Present were committee members Aid. Mark
Slocomb and Aid. William Le Doux. Also present were Utilities Superintendent Scott Kloskowski, and Ruckert -
Mielke representative Richard Eberhardt.
It was noted by Chairman David Sanders that the meeting was posted in accordance with the Open Meeting Law.
Approval of Minutes of Previous Meeting
Aid. Slocomb moved to approve the minutes of the February 19, 2001 meeting. Seconded by Ald. Le Doux
motion carried.
Status of Projects
Richard Eberhardt reviewed the status of projects (as per attached) noting the following updates. EPI boring pits
started today. The contractor for Quietwood Creek will be checking with the Public Works Superintendent regarding
possibly the need for temporarily closing Daisy Dr. The committee noted that the developer had not yet produced a
sewer video for Victorian Villas. Scott suggested that the City will be having Visu — Sewer do some work and at that
time they could also complete the video for the Victorian Villas and charge the developer. Aid. Sanders expressed
his concern with the unsightly items that still need to be removed from the North Shore Lift Station. The punch list
should be completed by April 1, 2001. Utilities Superintendent reported the Manhole Rehab 2001 project started
today.
Status of Town of Norway Contract
Nothing new to report.
Status of Sewer Metering
Utilities Superintendent noted that 75% to 80% of the meters had been installed. There are several property owners
that have not yet picked up their meters that had been ordered. A notice will be sent out to remind them to pick up
their meters. New Berlin contacted Scott to ask questions regarding two properties that are required to install meters.
One property has been vacant for years, and the other property is a service garage which also has a house that both
are connected to the same well head which would be difficult to meter. The committee decided to continue to charge
the two properties by employee survey information sheet and to review the properties on an annual basis. The
concern will be if there is a change of use, then the committee will further discuss the requirements to be metered.
Status of MMSD Proposed Storm Water Rules
Nothing new to report.
Further discussion on claim received from Zaharonoulos — Boxhorn-Grovewav-Rvan Sewer Proiect
Mr. Zaharopoulos and his Attorney attended the meeting and had several questions on what the committee required in
order to settle this claim. The main issue that Mr. Zaharopoulos has is the replacement of an additional eight trees.
The original trees he did agree that the City would not be able to replace them due to the maturity of the trees, the size
of one - being a 12" diameter tree and availability of another (Walnut Tree) was not an option. The committee had
offered to settle the claim for $5,350.00 at this time and requested them to supply cancelled checks for items in claim.
The committee decided to do some further investigation on claims and defer this matter until next month. Aid.
Slocomb made a motion to defer in order to review copies of their cancelled checks to be sent in before next month's
meeting and to check with how other communities handled similar situations. Aid. Le Doux seconded, motion
carried.
Status of alternatives for in -line storage at McShane Lift Station
Mc Shane Underground Storage Facility was discussed noting that the telephone lines had not been marked on the
original plans. Mr. Eberhardt brought in corrected plans. The committee discussed ways to prevent leakage, with
possibly sealing the joints with an exterior sealant, also lining the interior of the pipes. Mr. Eberhardt suggested
several options and will present the cost and ideas at a future meeting. One of the concerns is location of the
underground storage tank. The Parks Department possibly will be constructing a ball diamond at Bluhm Field and
the timing would be an issue. The Utilities Superintendent will confer with the Parks and Recreation Director.
Public Utilities Committee Minutes — 3/19/2001 — Page 2
•Review Deadline of Sewer Connections
The property owner of S69 W 16643 Martin Dr. (#2171.113) had been given an extension of the original deadline to
connect to the sewer system. The property connected to the sewer system on February 27, 2001.
SEWER NEW BUSINESS
Review Bids for Easement Jetter
The committee reviewed the following bids for the project:
Contractor Base Bid
Sewer Equipment of America $ 18,700.00
Aid. Sanders made a motion to accept the quote from Sewer Equipment ofAmerica far a Self -Propelled Easement
Machine $16,460.00, and price for the Trailer $2,240.00 at total of $18, 700.00. Ald. Slocomb seconded, motion
carried.
WATER UNFINISHED
Status of Stoneridge Ground Water Remediation
Nothing new to report
Status on proposed electrical power plant — New Berlin
Nothing new to report.
Status of Repainting of the Water Tower
•The committee reviewed a letter on behalf of LaBrandt & Associates, et al, requesting an extension of the time to
respond to the claim. The committee stated the issue was with the contractor who needs to fix the paint.
11
WATER NEW BUSINESS
Review request to apply for 2001 Simplified Rate Case Water Rate Increase
The committee discussed the memo from the Finance Director advising the committee the need for the increase.
Ald. Slocomb made a motion to have the water utility apply for a 2001 Simplified Rate Increase. Ald. Le Doux
seconded, motion carried.
Mr. Rich Eberhardt was dismissed at 8:05 p.m.
REVIEW OF DEFERRED ASSESSMENTS/SEWER & WATER
Nothing new to report.
REVIEW OF FIVE-YEAR CAPITAL PLAN
The committee will be discussing in the future a possible water extension for Moorland South.
ACCEPTANCE OF IMPROVEMENTS
Ald. Le Doux made a motion to defer the acceptance of improvements for Kelsey Dr. Loughney/Salentine until they
have a recommendation. Ald. Sanders seconded, motion carried.
REPORT OF UTILITIES SUPERINTENDENT/REPORT OF CITY ENGINEER
Utilities Superintendent Kloskowski reported that he had positive feed back from the property owners on Janesville
Road for a future water main extension. An information meeting is scheduled for Thursday, March 22, 2001 at City
Hall.
Public Utilities Committee Minutes — 3/19/2001 — Page 3
• COMMUNICATIONS AND ANY OTHER BUSINESS AS AUTHORIZED BY LAW —None
Aid. Slocomb moved to adjourn at 8:47 P.M. Seconded by Ald. Sanders, motion carried.
Respectfully submi ed,
Ren�k,
Recording Secretary
•
n
U
0 CITY OF MUSKEGO MEETING GUEST SIGN -IN SHEET
MEETING
vao
NAME (Please Print) AGENDA ITEM
rtcy,dAq ;?MA/T-dPL?a66-<�
• CONSULTANTS REPORT FOR:
PUBLIC UTILITIES COMMITTEE
MONDAY, March 19, 2001
Submitted Wednesday March 14, 2001
BOLD ITALICS INDICATE NEW INFORMATION
*Revisions as of Friday March 16, 2001
CITY PROJECTS:
BOXHORN, RYAN, GROVEWAY
CLOSEOUT BEING HANDLED BY THE CITY
HIGHVIEW ACRES
WAITING ON CHIMNEY SEAL REINSTALLATION
HILLENDALE DR 1300 FT S TO 3500 FT S OF JANESVILLE RD
PROJECT CLOSE OUT IN PROCESS
LOOMIS DRIVE / NORTH CAPE RD - US45 / MSS-1 C-96 -
LETTER SENT WITH FINAL PAPERWORK REQUIREMENTS
PROJECT FINAL PAYMENT ON HOLD PENDING LIEN RESOLUTION
MANHOLE REHABILITATION 2000
CONTRACTOR HAS STARTED CLOSE OUT PAPERWORK
PUNCH LIST TO BE REPAIRED IN SPRING
• MANHOLE REHABILITATION 2001
Contracts sent to City Attorney for review.
Mc Shane Pump Station — Bluhm Drive Storage Facility
Existing conditions plan submitted for City review March 14, 2001
Additional existing utilities marked recently will be added to the plans.
NORTH SHORE LIFT STATION GENERATOR
Updated punch list sent out March 12, 2001
Contractor said all will done by April 1, 2001 except for restoration (grass)
NORTH CAPE ROAD / RYAN RD TO 500 FT N. OF BOXHORN DR.
Lateral stakes delivered.
*Awarded by Council March 13 subiect to Property acquisition.
WOODS ROAD — KURTZE LANE TO BAY LANE PROJECT MW-26-99
PROJECT CLOSE OUT PAPER WORK STARTED
WOODS ROAD — BROOKE LANE TO EAST OF RACINE AVENUE
CONTRACTOR REQUESTING FINAL PAYMENT
DEVELOPMENTS:
AVION ESTATES
• PUNCHLIST REMAINS
• CANDLEWOOD (INTERIOR)
PHASE ONE NOT SUBMITTED
PAGE
PUBLIC UTILITIES COMMITTEE
Monday March 19, 2001
CANDLEWOOD — WOODS ROAD WATER MAIN
Crossing at Ladwig Drive started Tuesday March 13
*Safe sample remains to be completed.
CHAMPIONS VILLAGES — ADDITION 3 (PHASE FOUR)
PUNCH LIST SENT TO CONTRACTOR DECEMBER 1, 2000
CONTRACTOR WORKED ON PUNCH LIST
MANHOLE FRAME RESET SEAL REINSTALLED
DEER CREEK TWO
PUNCH LIST SENT TO CONTRACTOR
RESTORATION WAS DONE ADJACENT TO LAKE RIDGE
DYER EASEMENT — HILLENDALE DRIVE
PUNCHLIST COMPLETED EXCEPT FOR RESTORATION
RECORD DRAWING SUBMITTED TO CITY FEBRUARY 2
EPI LIFT STATION / FORCE MAIN
Supplier has submitted brick and color samples for choice.
• Preconstruction conference held Thursday March 8, 2001
Start tentatively scheduled for Monday March 19.
Pipe delivery started Wednesday March 14.
JEWEL — OSCO FORCE MAIN AND LIFT STATION
PLANS AND SPECIFICATIONS ARE COMPLETE
JEWEL — OSCO REVIEW OF LOCATION AND EXTERIOR OF GENERATOR BUILDING
REQUIRED
LAKEWOOD MEADOWS ADD NO 2
NOTHING NEW
LAKEWOOD CONDOMINIUMS (OVERLOOK BAY)
SAFE SAMPLE RECEIVED
WET CONNECTION OF WATER MAIN WAS COMPLETED
LOUGHNEY/NETTESHIEM (KELSEY DRIVE)/SALENTINE
RESTORATION REMAIN
RECORD DRAWINGS SUBMITTED TO CITY AND TOWN OF NORWAY
MUSKEGO CENTER/BERG
AS BUILTS COMPLETED
PUNCH LIST SENT TO CONTRACTOR
MUSKEGO MOTOR CAR CO
PUNCH LIST RESENT TO CONTRACTOR
MMSD REVIEWED AS BUILTS FEBRUARY 2, 2000
CONTRACTOR TOLD R/M THEY WILL NOT COMPLETE DUE TO PAYMENTS NOT
RECEIVED
• PAGE 3
PUBLIC UTILITIES COMMITTEE
Monday March 19, 2001
QUIETWOOD CREEK (CARITY)
INTERNAL CONSTRUCTION CONTINUES
RECORD DRAWINGS STARTED ON PORTIONS ALREADY PAVED.
Contractor's crew from Woods Road will move to Janesville Road and start on
16-inch water main from Bay Lane to the East.
Contractor said they would bore sanitary and water under Janesville Road at
Lakes Parkway.
*Contractor wants to close Daisy Drive for construction of sewer and water.
RAUSCH SANITARY PRESSURE SEWER— WOODS ROAD
COMPLETED WEEK OF FEBRUARY 19T"
Restoration is only remaining item.
ROSEWOOD ESTATES (FORMERLY WOODGATE ESTATES)
POST PAVING PUNCHLIST (UNDERGROUND) COMPLETED
SAL FERRITO SEWER (PRIVATE SANITARY SEWER)
DEWATERING WELL NOT REMOVED
LATERALS NOT CONNECTED YET
SARAH ESTATES (WOODS ROAD)
PLANS RECEIVED FOR REVIEW FEBRUARY 12, 2001
• Plans recommended for approval March 13, 2001
VICTORIAN VILLAS
VIDEO OF SEWER NOT YET RECEIVED
COMPLETED PROJECTS ONLY AWAITING MMSD APPROVAL OF RECORD DRAWINGS (AS
BUILTS):
CHAMPIONS VILLAGES — ADDITION 2 (PHASE THREE)
HOLTZ-ARROWOOD
KNUDSON FORCE MAIN
NORTH CAPE FARM
WISA FORCE MAIN — HILLENDALE DRIVE