PUM20000417PUBLIC UTILITIES COMMITTEE MEETING - CITY OF MUSKEGO Approved as
• Minutes of Meeting Held Monday, April 17, 2000 Corrected
The meeting was called to order at 7:06 p.m. by Chairman David Sanders. Present
were committee members Ald. Mark Slocomb, Ald. William Le Doux, Utility Supt. Scott
Kloskowski, Mayor and Ruekert-Mielke representative Richard Eberhardt.
It was noted by Ald. Sanders that the meeting was posted on 4/13/00 in accordance
with the Open Meeting Law.
Review of Minutes of Previous Meeting
The minutes of the meeting held on March 20 & 28, 2000 were reviewed and placed on
file.
Status of Projects
Mr Rich Eberhardt gave status of City Projects as attached.
_Hillendale Water Project - Waste Management
The committee reviewed and discussed the correspondence received from the
Loppnow (#2233.996.002) property on Hillendale requesting connection to municipal
water Waste Management has been unable to obtain an easement from the owner of
Tax Key (# 2233.996.003 & #2233.996.004) in order to supply the Loppnow property
. with water The Loppnows are requesting help from the City. The committee's concern
is how to get safe water to the existing resident. Ald. Slocomb made a motion to direct
the engineers to aceuire prepare an easement over the property south of the Loppnow
property (#2233.996.001) in order to install water service to the Loppnow property.
Ald. Sanders seconded, motion carried.
Woods Rd. Water Project - The paving should be done next week.
Muskego Motor Car Company The committee requested the engineers to forward a
copy of their punch list.
Status of Town of Norway Contract Nothing new to report.
Further Discussion on Policy on Connections (Capacity Utilization Permit)
The committee reviewed the Permit Application. The committee directed Scott to
recommend some of the possible changes that need to be made and report back to the
committee prior to sending the changes to the Attorneys.
Further Discussion on COM 83/Chapter 21
Nothing to report at this time. Item deferred to next month. Mayor will provide a copy
of the rules.
•
Public Utilities Committee -April 17, 2000
Page 2
• Further Discussion on Sewer Rate Study
A meeting was held at Attorney Molter's office on April 11, 2000, with staff and
representatives from Ruekert-Mielke's office, along with Don Vilione to review and
discuss possible options. The clerk will be designing a time line. Don Vilione will
continue working with the budget numbers to calculate an amount if the committee
decides to charge on a gallon rate. Ken Ward and Christy Cramer will continue to
review possible ordinance changes. The Sewer Utility Clerk provided a comparison
report on sewer usage charges by the rate per gallon verses the current REC charge.
Aid. Slocomb request a meeting with the Finance Director and Don Vilione and Scott to
discuss how he came up with his formulas. Item will be placed on next month's
agenda.
Review Penaltv Charaed for Sewer Usaae on Several Properties.
The committee reviewed correspondence sent by two property owners(#2252.985 &
#2257.073) that received a late penalty charge on the sewer usage bill. Ald. Slocomb
made a motion to forgive the penalty charge on the two properties (Tax Key #2252.985
& Tax Key#2257.073). Seconded by Ald Sanders, motion carried.
Review Request for Sewer Connection - RauschlWoods Rd.
The committee reviewed the Application for Capacity Utilization submitted by Pegarl
• L.L.P They are requesting a total of 12 units; 3 Bedrooms each for tax key #2228.998.
Several property owners (Eva Pierzchalski and Jerry Boldt) appeared and expressed
interest in working with the developer to be serviced by sewer Ald. Slocomb made a
motion to approve request for original 12 units, and agreed to revise the number next
month to include the additional property owners that want service by this main
extension. Ald. Sanders seconded, motion carried. The developer will be contacting
some of the property owners to see if they can work out an agreement to include them
in this main extension. Mayor has agreed to contact one of the property owners on
Woods Rd.
Review Quarterly Billing-MMSD & Town Of Norway
The committee reviewed the 1s' Qtr bill from MMSD in the amount of $130,431.54. The
committee had not received the Town of Norway bill submitted for the list quarter
Ald. Sanders made a motion to approve payment of the 1st quarter MMSD bill in the
amount of $130,431,54. Ald. Sanders seconded, motion carried. The committee will
be reviewing the Town of Norway's ls' quarter bill next month.
Discuss Removal of Outhouse in the City Right of Way - Denoon Point Rd.
The Mayor's office had sent a letter to invited the property owners of S110 W20362 Pt.
Denoon Rd. (#2287.033) to attend the meeting to discuss the illegal structure on the
property. Mr & Mrs. Christman, Ms. Strehlow along with Mr John Gnas appeared and
came to a verbal agreement among themselves to remove and fill in where the
• outhouse was located.
Public Utilities Committee - April 17, 2000
Page 3
• Status of Properties to be included in WCA Distict Extention-So Side of Woods
Rd./Moorland Corridor
Utility Superintendent reported the surveys had been returned and the results as
follows: 21 in Favor, 79 Against; 37 No Response; 137 Total Survey Cards Mailed.
Ald. Sanders made a motion to direct the Engineers to draw map & legal description to
amend the WCA District to include the property owned by Boehms which was original
part of the Diekfuss Farm and also the proposed Jewel Osco site. Ald. Slocomb
seconded, motion carried.
Review Proposed Water System Facility Plan for Well and Tower Sites
Deferred to next month's meeting.
Review Chapter 28 reaarding Meter Installation
Scott reported the requirement for installing Neptune Meters was not found in Chapter
28. Scott will locate the appropriate ordinance and recommend to the committee to
make the change to the type of meter required.
Review request to mount Cell Phone Antennae to Water Tower
Ted Torcivia and Jeff Fowle of Voice Stream, appeared to request connection of their
• wireless service to the water tower located in the Industrial Park. Ald. Sanders made a
motion to approve Voice Streams proposal contingent on an agreement drawn up to
support the maintenance of the system. Ald. Le Doux Seconded, motion carried. Ald.
Sanders made a motion to limit the number to a maximum of 4 antennas to be located
on the water tower in the industrial park, with one of them on the ball of the water tower
and up to 3 on the stem. Ald. Slocomb seconded, motion carried.
Mr Rich Eberhardt left at 9:30 p.m.
Utility Superintendent's Report - Scott reported on the Hale Park Water Trust issuing
a boiling water notice to their residents as a result of unsafe testing reports. After
chlorinating the well, they have received a clean water test and no longer have to boil
their water Scott, city engineer and city attorney will be meeting next week to continue
discussion on the problem with the painting of the water tower
ADJOURNMENT - Being no further business to discuss, Ald. Sanders moved to
adjourn at 10:25 p.m. Ald. Le Doux seconded, motion carried.
Res ectfully submitted, � '�
. Re ee Kowalik
Recording Secretary
�. CITY OF MUSKEGO MEETING GUEST SIGN -IN SHEET
w
MEETING
NAME (Please Print
AGENDA ITEM
S�i�✓' �,, %%�� �II //tee a �����e � pp 1
�a-r .EIU ldT __ SeW er oin %c)UJG�r 'L�
1
r
S ��
� dvvle Vv,tesfrnu,,,, w�relr<s
• CONSULTANTS REPORT FOR:
PUBLIC UTILITIES COMMITTEE
MONDAY, APRIL 17, 2000
Submitted Friday April 14, 2000
REVISED MONDAYAnril 17,200
BOLD ITALICS INDICATE NEW INFORMATION
CITY PROJECTS:
BOXHORN, RYAN, GROVEWAY
FINAL RESTORATION AND CLOSEOUT BEING HANDLED BY CITY
HIGHVIEW ACRES
WAITING ON CHIMNEY SEAL REINSTALLATION
HILLENDALE DR 1300 FT S TO 3500 FT S OF JANESVILLE RD
NEW LETTER SENT ON PUNCHLIST AND RESTORATION
CITY WILL INSPECT SERVICES INTO RESIDENCES
MC SHANE BYPASS PIPING/STORAGE BUILDING
PUNCHLIST SENT OUT
RESTORATION IN SPRING
NORTH SHORE LIFT STATION GENERATOR
CONTRACTS IN PROCESS OF REVIEW AND EXECUTION
• LOOMIS DRIVE / NORTH CAPE RD - US45 / MSS-IC-96 -
LETTER SENT WITH FINAL PAPERWORK REQUIREMENTS
NORTH CAPE ROAD / RYAN RD TO 500 FT N. OF BOXHORN DR.
WAITING ON PRELIMINARY AGREEMENT AS TO STATION LOCATION
WOODLAND CT / SLABICH LATERAL
PUNCHLIST SENT TO CONTRACTOR
WOODS ROAD — KURTZE LANE TO BAY LANE PROJECT MW-26-99
PAVEMENT AND RESTORATION REMAIN
PAVING CONTRACTOR SCHEDULED FOR WEEK OF 24TH OFAPRIL
WOODS ROAD — BROOKE LANE TO EAST OF RACINE AVENUE
PAVEMENT AND RESTORATION REMAIN
PAVING CONTRACTOR SCHEDULED FOR WEEK OFI7m OFAPRIL
TENTA TIVEL Y THURSDA YAPRIL 20
WOODS ROAD — SANDY BEACH FORCE MAIN
PRECONSTR UCTION CONFERENCE HELD APRIL 12, 2000
TENTATIVE START IS MAY 1, 2000
CONTRACTS ARE AT CITY FOR EXECUTION
•
• PAGE 2
PUBLIC UTILITIES COMMITTEE
MONDAY APRIL 17, 2000
REVISED MONDAYApril 17, 2000
DEVELOPMENTS:
AVION ESTATES
PUNCHLIST REMAINS
CANDLEWOOD
PHASE ONE PLANS TO BE RECEIVED SOON
WOODS ROAD WATERMAIN PLANS TO BE SENT TO DNR AFTER QUIETWOOD PLANS
CHAMPIONS VILLAGES — ADDITION 2 (PHASE THREE)
PUNCHLIST ITEMS COMPLETED
AS BUILTS SENT TO MMSD January 14, 2000
CHAMPIONS VILLAGES — ADDITION 3 (PHASE FOUR)
PRECONSTRUCTIONMEETING HELD APRIL 13, 2000
START CONSTRUCTIONAPRIL 24, 2000
DEER CREEK TWO
PUNCH LIST SENT TO CONTRACTOR
• EPI LIFT STATION / FORCE MAIN
RESENT TO WISCONSIN DOT FOR PERMIT
RESUBMITTED TO MMSD TO REPLACE LOST MATERIALS
WORKING WITH WDOT REGARDING DOUBLE WALL FORCE MAIN
WAITING FOR EPI RESPONSE TO MMSD PRETREATMENT OF LEACHATE
REQUIREMENTS
CITYAND RIM TO MEET ON DOT RESPONSE
HOLTZ-ARROWOOD
RESTORATION IS ALL THAT REMAINS
AS BUILTS SENT TO MMSD
KNUDSON FORCE MAIN
RESTORATION REMAINS
AS BUILTS SENT TO MMSD, FEBRUARY 11, 2000
LAKEWOOD MEADOWS ADD NO 2
NOTHING NEW
LOGHNEY/NETTESHIEM (KELSEY DRIVE)/SALENTINE
WAITING FOR THIRD RESUBMITTAL OF PLANS
MUSKEGO CENTEPUBERG
CONSTRUCTION COMPLETED
AS BUILTS COMPLETED
PUNCH LIST SENT TO CONTRACTOR
•
. PAGE 3
PUBLIC UTILITIES COMMITTEE
MONDAY APRIL 17, 2000
REVISED MONDAYAnrii 17,200
MUSKEGO MOTOR CAR CO
PUNCH LIST RESENT TO CONTRACTOR
MMSD REVIEWED AS BUILTS FEBRUARY 2, 2000
CONTRACTOR TOLD RIM THEY WILL NOT COMPLETE DUE TO
PAYMENTS NOT RECEIVED
INiRA r.[e7ItamwA:IM
CONTRACTOR INSTALLED WRONG MANHOLE FRAMES ORDERED HIM TO REPLACE
AS BUILTS SENT TO MMSD AUGUST 12, 1999
PUNCHLIST COMPLETED
OUTLOT 3 KIMBERLY ESTATES SEWER AND WATER
PUNCHLIST SENT TO CONTRACTOR, RESTORATION REMAINS
PIONEER DRIVE / PARKS GARAGE
FINAL PAPER WORK SENT TO CITY
QUIETWOOD CREEK (CARITY)
WAITING ON CHAPTER 30 PERMIT
UTILITY PLANS SUBMITTED TO MMSD. WDNR
• ROSEWOOD ESTATES (FORMERLY WOODGATE ESTATES)
UNDERGROUND INSTALLED
WAITING FOR ROAD CONSTRUCTION TO COMPLETE
SAL FERRITO SEWER (PRIVATE SANITARY SEWER)
DEWATERING WELL NOT REMOVED
LATERALS NOT CONNECTED YET
VICTORIAN VILLAS
VIDEO OF SEWER NOT YET RECEIVED
NOTE:
MMSD RULES NOW REQUIRE ALL SANITARY MANHOLES TO BE VACUUM TESTED.
THIS WILL ADD SIGNIFICANT COSTS TO ALL PROJECTS CONSTRUCTED THIS YEAR.
MMSD RULES NO LONGER REQUIRE AS BUILT APPROVALS BY MMSD BEFORE
CONNECTIONS CAN BE MADE. THERE IS LESS URGANCY IN THEIR REVIEWS OF THE
RECORD DRAWINGS.
MMSD HAS INFORMED RIM THAT THEY WILL BE OPENING
MANHOLES 30 DAYS AFTER BINDER PAVEMENT IS INSTALLED. IF
k n ° INTERNAL SEALS ARE NOT INSTALLED THEY PLACE THE CITY'S NAME ON
b� A LIST. EVERY THIRTYDAYS THEYRECHECK. IF YOUR NAME IS ON THE
4 LIST FOR THREE MONTHS INA ROW FOR A SINGLE PROJECT, MMSD WILL
0
STOPALL APPROVALS.
• PAGE
PUBLIC UTILITIES COMMITTEE
MONDAY APRIL 17, 2000
REVISED MONDAYAnril 17,200
COMPLETED PROJECTS ONLY AWAITING MMSD APPROVAL OF RECORD DRAWINGS (AS
BUILTS):
WISA FORCE MAIN - HILLENDALE DRIVE
0