Loading...
PUM19980428PUBLIC UTILITIES COMMITTEE - CITY OF MUSKEGO MINUTES OF MEETING HELD TUESDAY, APRIL 28, 1998 The meeting was called to order at 6:50 p.m. by Chairman Sanders. Also present were Committee members Slocomb and. Woodard, Mayor DeAngelis, and Superintendent Kloskowski. The Committee noted that the meeting was posted in accordance with the Open Meeting Law. The Committee reviewed design for Pumphouse #2 in Country Club Villages. The Committee reviewed letter dated 4/27198 from Ruekert & Mielke regarding same, as attached. Aid. Slocomb moved to allow building to be located perpendicular to road, provided easement (10' X 20') is identified on lot description of property to the north and all other Ruekert & Mielke concerns are addressed. Seconded by Aid. Woodard, motion carried 3-0. The Committee reviewed request for watermain extension to Pumphouse #2 in Country Club Villages. Aid. Slocomb moved to approve request with condition of installation of slurry backfill in road to 5' behind curb. Seconded by Aid. • Woodard, motion carried 3-0. Aid. Slocomb moved to adjourn at 7:07 p.m. Seconded by Aid. Woodard, motion carried 3-0. jz 0 :z7 ully submitted, Scott Kloskowski Public Utilities Superintendent Ruekert � Mielke 5�rr 1l. • Professional Engineers 3 Registered Land Surveyors since 1946 Mr. Matt Sadowski Director of Planning City of Muskego W182 S8200 Racine Avenue Post Office Box 903 Muskego, WI 53150 RE: Champions Village Lot 102 Well Pump House Design Drawing Review Dear Matt: April 27, 1998 We have reviewed the revised design drawings prepared by D&D Services for the referenced project. The drawing revision date is 4/24/98. We received the drawings on 4/27/98. The following recommendations apply to the revised drawings. 1 The conduit in the floor between the pump starter panel and the future flow • switch should terminate under the piping centerline at the flow switch instead of where shown. o� 2. With the new style pump, an air/vacuum release valve should be installed between revised lineshaft pump discharge head and the check valve. 01< 3. If the heater is to remain in the northeast corner of the pump house, the heater should be selected and installed such that the clearance under the heater is at least 7 feet and the clearance from the heater to the roof hatch is at least 1 foot. The following items are referenced to other submitted drawings 4. We received a submittal from Municipal Well & Pump, Inc. on 4/20/98 which included the well data requested in our 4/15/98 review letter. In addition, the City should be given a copy of the DNR approval letter for the well. The submittal also included a Proposed Grading Plan prepared by Municipal Well & Pump, Inc. dated 1/6/98 which does not agree with the grading shown on the water main design drawings prepared by Metropolitan Engineering, Inc. dated 4/9/98. This item was item 6 of the April 15, 1998 letter. 5. Slurry backfill should be used between the connection to the existing water main and the proposed valve. The water main design drawing prepared by Metropolitan Engineering, Inc. dated 4/9/98, revised 4/20/98 calls for gravel • backfill. W239 N1812 ROCKWOOD DRIVE WAUKESHA, WISCONSIN 53188-1113 (414)542-5733 FAX (414) 542-5631 Ruekert Mielke Professional Engineers & Registered Land Surveyors since 1946 • Mr. Matt Sadowski City of Muskego April 27, 1998 Page 2 6. Although we received a facsimile from Dick Milaeger regarding pump access, we anticipate there will be difficulty pulling the well pump if the pump house is oriented as shown on the drawings prepared by Metropolitan Engineering, Inc. There would be little clearance available for a pump pulling rig. Either the rig would have to be set up partially on the neighboring property or the rig would have to stop at the west edge of the pump house and lower its boom excessively. Access to the pump would be much easier if the pump house were rotated 90 degrees. Access for possible future work on the well also would be made easier by rotating the pump house. Please call if you have questions on the above. Very truly yours, RUEKERT & MIELKE, INC. • r� Daniel R. Butler, P.E. DRB/tag r:\client\13\1392012.1 10\corres\sadowski-19980427-design drawing review.doc cc: David L. DeAngelis, City of Muskego Scott Kloskowski, Utility Superintendent Don Pionek, Alderman Municipal Well & Pump Metropolitan Engineering Paul Votto, Burke Properties Kenneth Ward, Ruckert & Mielke, Inc. Michael Campbell, Ruekert & Mielke, Inc. Richard Eberhardt, Ruekert & Mielke, Inc. File W239 N1812 ROCKWOOD DRIVE WAUKESHA, WISCONSIN 53188-1113 (414)542-5733 FAX (414) 542-5631