PCR2022007 Baseler 4-lot CSMRESOLUTION #P.C. 007-2022
APPROVAL OF A FOUR LOT CERTIFIED SURVEY MAP FOR JAMES BASELER
LOCATED ON VACANT PROPERTY ALONG HENNEBERRY DRIVE / TAX KEY NO. 2239.997
WHEREAS, A Certified Survey Map (CSM) was submitted by James Baseler for a four (4) lot land division
located on vacant land along Henneberry Drive / Tax Key No. 2239.997, and
WHEREAS, This proposal is to create three new buildable lots and one outlot, and
WHEREAS, The proposed buildable lots range from approximately 2.8 acres to 14.9 acres in size along with
a 0.73 acre outlot, and
WHEREAS, The 2020 Comprehensive Plan depicts the area for rural density residential uses and the
proposed land division is consistent with the plan, and
WHEREAS, The proposed lots are currently zoned A-1 Agricultural District, which require minimum lot sizes
of 120,000 SF with a minimum average width of 300 feet per lot, and
WHEREAS, All lots will be served by private septic and well, and
WHEREAS, A new cul-de-sac will be built by the developer and will be dedicated to the City as a public
road.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted
by James Baseler for a four (4) lot land division located on vacant land along Henneberry Drive / Tax Key
No. 2239.997, subject to technical corrections as identified by the City Engineers, and payment of all
applicable fees and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, All technical corrections from the City will need to be addressed before the
Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, A digital file of this CSM shall be submitted to the City in accordance with
Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted: February 1, 2022
Defeated:
Deferred:
Introduced: February 1, 2022
ATTEST: Adam Trzebiatowski AICP, Planning Manager