PCa20110210CITY OF MUSKEGO
PLAN COMMISSION AGENDA
6:00 PM Thursday February 10, 2011
Muskego City Hall, W182 S8200 Racine Avenue
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
STATEMENT OF PUBLIC NOTICE
APPROVAL OF THE MINUTES OF THE DECEMBER 7, 2010 MEETING
OLD BUSINESS FOR CONSIDERATION The following agenda items have been deferred by
the Plan Commission and are recommended by the Community Development Department for
individual consideration.
None.
OLD BUSINESS SCHEDULED FOR DEFERRAL The following agenda items have been
deferred by the Plan Commission. Planning Department staff have reviewed each case and
determined that they have not met one or more specific criteria for approval and are
recommended for deferral en gross. However, the Plan Commission may take action on any
item herein.
None.
CONSENT BUSINESS The following agenda items have been received by the Community
Development Department and are recommended for approval en gross.
RESOLUTION #P.C. 002-2011 — Approval for the sale of fireworks for Vince and Heather
Siegel at the Jetz Fuel property located in the SW '/4 of Section 2 (Tax Key No. 2167.995.011 /
S69 W15461 Janesville Road).
RESOLUTION #P.C. 003-2011 — Approval of a three lot Certified Survey Map for the
Sellhausen property located in the SW '/4 & SE '/4 of Section 31 (Tax Key Nos. 2283.999.001 &
2283.999.002 / W216 S10884 Crowbar Drive).
NEW BUSINESS FOR CONSIDERATION The following agenda items have been received by
the Community Development Department and are recommended for individual consideration.
RESOLUTION #P.C. 071-2010 — Recommendation to Common Council to rezone a property
from RM-1 (Multi Family Residence) and RS-2 (Suburban Residence) to a Planned
Development for the Willow Glen Development and approval of a Building, Site, and Operation
Plan located in the SW '/4 & SE '/4 of Section 16 (Tax Key No. 2223.998.004, 2223.998.005,
2223.998.006 / W 182 S8450 Racine Avenue).
RESOLUTION #P.C. 001-2011 — Approval of a Right-of-way Vacation, Two Lot Certified
Survey Map, and a Condominium Plat for Rustic Trails/Trail Court located in the SE '/4 of
Section 7 (Tax Key Nos. 2188.032, 2188.033, 2188.034, 2188.035, 2188.036, & 2188.037 /
Trail Court).
Plan Commission Agenda, continued
February 10, 2011
RESOLUTION #P.C. 004-2011 — Approval of a Building, Site, and Operation Plan for L Spa
located in the NE'/4 of Section 2 (Tax Key No. 2165.985 / Janesville Road).
RESOLUTION #P.C. 005-2011 — Approval of a Building, Site, and Operation Plan Amendment
for Wal-Mart located in the NE '/4 of Section 3 (Tax Key No. 2169.999.003 / W159 S6530
Moorland Road).
#P.C. 006-2011 — Discussion of a Conceptual Land Division for Crystal Cove located in the SE
'/4 of Section 32 (Tax Key Nos. 2287.999.004 & 2288.996.003 / Racine Avenue - Crystal
Drive).
RESOLUTION #P.C. 007-2011 — Approval of a Building, Site, and Operation Plan Amendment
for O'Reilly Auto Parts located in the NW % of Section 10 (Tax Key No. 2198.984.001 / S74
W 16890 Janesville Road).
RESOLUTION #P.C. 008-2011 — Approval of a two lot Certified Survey Map for the Rozeski
property located in the SE '/4 of Section 13 (Tax Key No. 2212.994.001 / S84 W 12696
Schaefer Drive).
NEW BUSINESS PLACED ON FILE The following agenda items have been received by the
Community Development Department and assigned case numbers. Community Development
Department staff will review each case in the order received and will present each item for
consideration by Resolution at future meetings in the order received, subject to the time frames
provided by Municipal Code and Wisconsin Statutes.
DOCKET #P.C. 009-2011 — Approval of a removal of a Conditional Use Grant (#177) for
Ricco property located in the SW % of Section 26 (Tax Key No. 2263.998.003 / W151 S10178
Thode Drive).
MISCELLANEOUS BUSINESS
ADJOURNMENT
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF
THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE -STATED MEETING TO GATHER INFORMATION; NO ACTION
WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE -STATED MEETING OTHER THAN THE GOVERNMENTAL
BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE.
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT MUSKEGO COMMUNITY DEVELOPMENT DEPARTMENT, (262) 679-4136.
PAGE 2
CITY OF MUSKEGO
PLAN COMMISSION MINUTES
6:00 PM Tuesday December 7, 2010
Muskego City Hall, W182 S8200 Racine Avenue
Mayor Johnson called the meeting to order at 6:00 PM.
Those present recited the Pledge of Allegiance.
PRESENT
Mayor Johnson, Ald. Borgman, Commissioners Hulbert (6:20 PM), Noah, Stinebaugh and
Jacques and Director Muenkel and Recording Secretary McMullen.
ABSENT
Commissioner Burke
Recording Secretary McMullen noted that the meeting was properly noticed on December 3,
2010 in accordance with the Open Meeting Law.
APPROVAL OF THE MINUTES OF THE NOVEMBER 2, 2010 MEETING Commissioner Noah
made a motion to approve the minutes of the November 2, 2010 meeting. Commissioner
Jacques seconded. Upon a voice vote, motion to approve the minutes was ADOPTED
unanimously.
OLD BUSINESS FOR CONSIDERATION
None.
OLD BUSINESS SCHEDULED FOR DEFERRAL
None.
CONSENT BUSINESS
RESOLUTION #P.C. 079-2010 — Approval of a Two Lot Certified Survey map for the Ricco
property located in the SW '/4 of Section 26 (Tax Key No. 2263.998.003 / W151 S10178 Thode
Drive). Commissioner Jacques made a motion to ADOPT Resolution #P.C. 079-2010. Ald.
Borgman seconded. Upon a roll call vote, Resolution #P.C. 079-2010 was ADOPTED
unanimously.
NEW BUSINESS FOR CONSIDERATION
#P.C. 080-2010 — Discussion of a Conceptual Three Lot Certified Survey Map for the
Sellhausen/Sepulveda property located in the SW '/4 of Section 31 (Tax Key Nos. 2283.999.001
& 2283.999.002 / Crowbar Drive). Director Muenkel explained this item is for conceptual
approval due to controversy over past development proposals. The property is located on
Crowbar Road just south of Lake Denoon Park. The past owners wanted to divide the property
into a subdivision, which raised concerns over the number of docks, who would own the
wetlands and the density that would be allowed. The property has new owners who are looking
to divide the 41 acres into 3 parcels. They are proposing one large lot with the house and the
barn and then two smaller flag type lots. The two lots will have 80 feet of right of way, which is
required by code and will share one driveway via an easement. Staff is recommending approval
based on the conservation area being under one ownership and lot one being the only lot with
access to the water. The petitioner was present and stated his mom and fiance and his brother
would be the only owner's of the property, and they are not planning any future development of
the property.
Plan Commission Minutes, continued
December 7, 2010
RESOLUTION #P.C. 081-2010 — Approval of a Building, Site, and Operation Plan for Black Tie
Auto located in the SE 114 of Section 18 (Tax Key No. 2229.989.003 / Janesville Road).
Commissioner Stinebaugh made a motion to ADOPT Resolution #P.C. 081-2010.
Commissioner Jacques seconded. Director Muenkel explained a rezoning from M-3
Landfill/Extractive to M-2 General Industrial was approved for this property at the last meeting to
allow an auto service repair use. This submittal is for Building, Site and Operation approval.
Two 4,320 square foot structures are proposed on a one -acre parcel. The two buildings
proposed are to be constructed with metal siding and roofs and cultured stone. The General
Design Guide calls for 50% masonry product unless Planning Commission finds reasons to not
apply the requirement. The buildings, as proposed, do not meet the 50% requirement on all
sides. Calculations are determined with the windows and doors removed. Because of the grade
changes and trees, the buildings will be mostly unnoticeable. Staff recommended the following
contingencies:
• Metal siding and roofs are allowed due to location, vegetation, and topography on the
site.
• 50% masonry must be found on all sides of the structures except the west fagade of the
western structure and the north fagade of the eastern structure.
• That a second row of windows be applied to the overhead doors
• The overhead doors along Janesville Road must be kept closed when not in use.
Parking is shown as seven stalls, which meets the code requirement, but they will need to be
10'x20' instead of 9'x18' as shown on the site plan. The drive aisles will also need to be
adjusted to 24 feet of drive aisle area. There is no location for a dumpster at this time. If one is
needed, Community Development Department approval will be required. A landscape plan must
be submitted and approved by the City Forester before building permits are issued. Staff
recommended lining the entryway to the site with some landscaping, and if the tree line along the
eastern portion of the site is removed new trees may need to be planted. Any signage and
lighting will need Community Development Department approval. No outdoor storage including
junk vehicles will be allowed on the site. Roof top and ground mechanicals must be screened
from view.
Commissioner Noah stated he would like to see the buildings as close to 50% masonry as
possible while keeping a consistent line matching each fagade and each building.
Discussion took place relating to the foundation wall on the eastern fagade of the east building.
It was the consensus of the Commission that the exposed area be covered with the same
masonry material as the other facades. Upon a roll call vote, Resolution #081-2010 was
ADOPTED unanimously.
NEW BUSINESS PLACED ON FILE
DOCKET #P.C. 071-2010 — Recommendation to Common Council to rezone a property from
RM-1 (Multi Family Residence) and RS-2 (Suburban Residence) to a Planned Development for
the Willow Glen Development and approval of a Building, Site, and Operation Plan located in
the SW 114 of Section 16 (Tax Key No. 2223.998.004, 2223.998.005, 2223.998.006 / W182
S8450 Racine Avenue).
MISCELLANEOUS BUSINESS
PAGE 2
Plan Commission Minutes, continued
December 7, 2010
ADJOURNMENT
Commissioner Hulbert made a motion to adjourn at 6:30 PM. Commissioner Noah seconded.
Upon a voice vote, motion carried. With no further business to come before the Commission, the
meeting was adjourned.
Respectfully submitted,
Kellie McMullen
Recording Secretary
PAGE 3
City of Muskego
Plan Commission Supplement PC 002-2011
For the meeting of: February 1, 2011
REQUEST: Approval of an Annual Review to Permit Temporary Fireworks Sales at Jetz Fuel
S69 W 15461 Janesville Road / Tax Key No. 2167.995.011
SW '/4 of Section 2
PETITIONER: Vince and Heather Siegel
INTRODUCED: February 1, 2011
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 002-2011
Petitioner proposes to operate a temporary fireworks sales stand at the Jetz Fuel parking lot. A 20' x 40' tent is
proposed. Signage has been indicated as two 2.5' x 10' and one 4' x 20' temporary banners that will be hung from
each side of the tent and small directional signs at the entrances of the parking lot. Operations are proposed from June
15th — July 121h, from 8:00 am to 9:00 pm. Permission has been received from the property owner to use the site
and the restroom facilities.
DISCUSSION PC 002-2011
The proposal is consistent with operations of other vendors in Muskego.
A transient merchant license must be obtained from the City Clerk's Office.
In the past the Plan Commission addressed an issue stated under Resolution #072a-2003 that said that no outdoor
sales are allowed at this property. The outcome from last year, which will be carried over to this year, is that the
Resolution is drafted to allow this form of outdoor sales and any other on the property subject to Plan Commission
approval and the use as being temporary.
Also, in the past the Fire Department brought to the attention of the Planning Department their Wisconsin Chief Fire
Officer Guidebook. Within the guidebook it states that storage and handling of fireworks may not occur within 50
feet of a dwelling, public assembly, or where gasoline or volatile liquids are dispensed in quantities greater than 1
gallon. The proposed site meets the guidebook requirements.
Once again this year, as in the past, a storage container is proposed on site. There have been no problems with
the storage container in the past. The container will be located within a parking stall along the Moorland Road side
of the lot.
STAFF RECOMMENDATION PC 002-2011
Approval of Resolution #PC 002-2011
Resolution #PC 002-2011
LEGEND
Agenda Item(s)
Property
Zoning Districts
/"/ Right-of-way
Hydrography
Aerial Photo Date: April 2007
f 111 OF Prepared by City of Muskego
L-,M SIK i GO Planning Department
se —
- . 1/24/2011
Supplemental Map
Property Owner:
Vince and Heather Siegel
S69 W15461 Janesville Road
COLLEGE
SOS
PO
Area of Interest ti'I
JPNESNLLE � �' a
a�P
��SPD
RESOLUTION #P.C. 002-2011
APPROVAL OF AN ANNUAL REVIEW FOR SALE OF FIREWORKS FOR VINCE AND HEATHER SIEGEL
AT THE JETZ FUEL PROPERTY LOCATED IN THE SW '/ OF SECTION 2
(S69 W15461 JANESVILLE ROAD / TAX KEY NO. 2167.995.011)
WHEREAS, A request has been submitted by Vince and Heather Siegel to locate a temporary sales tent and
signs advertising the sale of fireworks at the Jetz Fuel property located at S69 W 15461 Janesville Road, and
WHEREAS, Fireworks sales were previously operated at this location, and that temporary sales vendors are
limited to one on site at any one time, and
WHEREAS, The tent canopy will be 20' x 40' in size, and
WHEREAS, Signage has been noted on the proposal as two 2.5' x 10' and one 4' x 20' temporary banners
that will be hung from each side of the tent and small directional signs at the entrances of the parking lot, and
WHEREAS, A site plan has been filed for Staff review and that proof of sanitary facilities accommodations
has been provided, and
WHEREAS, Outdoor sales are not allowed as per the BSO for Jetz Fuel and Resolution #P.C. 072a-2003,
although Plan Commission may make the determination that temporary fireworks sales is not restricted, and
WHEREAS, The Wisconsin Chief Fire Officer Guidebook notes that storage and handling of fireworks may
not be within 50 feet of a dwelling, public assembly, or where gasoline or volatile liquids are dispensed in
quantities greater than 1 gallon, and
WHEREAS, An electrical permit and inspection may be required by the Building Inspection Department for
the electricity hookup, and
WHEREAS, A Transient Merchant License will be required to be obtained from the City Clerks Office.
THEREFORE BE IT RESOLVED, That the Plan Commission approves the request for a temporary stand at
the Jetz Fuel parking lot for fireworks sales for Vince and Heather Siegel subject to the following conditions:
1. Dates of operation approved from June 151h, 2011 to July 12`h, 2011 and
2. Hours of operation permitted only from 8 am to 9 pm, and
3. A letter of approval from the property owner has been submitted to the Planning Department
approving rental space for Mr. and Mrs. Siegel, and
4. Applicable permits / licensing must be obtained from the Building Inspection department prior to
any site work on the property.
5. Petitioner to obtain a Transient Merchants License from the Clerk -Treasurer's Office.
BE IT FURTHER RESOLVED, That Plan Commission finds this use to be of a temporary nature and will
permit the use in contrary to Resolution #P.C. 072a-2003 as long as only one such use is permitted during
any one period of time subject to Plan Commission approval.
BE IT FURTHER RESOLVED, That the small directional signs cannot be within any right-of-ways or vision
corners and they can only be placed on the Jetz property.
BE IT FURTHER RESOLVED, That the location of the fireworks stand must be at least 60 feet (50' per Fire
Guidebook and 10' for the gasoline hose length) or greater from the gasoline dispensers.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: February 1, 2011
ATTEST: Kellie McMullen, Recording Secretary
American Fireworks And Novelties L.L_C
1330 Edwards St. Brooktae►d, WI 53005 262-641-9074
Business Operation Plan
A. Name of business operation: American Fireworks and Novelties, Vince and
Heather Siegel
B. Place of operation: Jetz Convenience Center, S. 69 W. 15461 Janesville
Rd. Muskego, VVI 53150
C. Name of Property owner(s): 1 Bob O'Connor, O'Connor Petroleum
D. Description of operation: To sell Independence Day fireworks permissible
by local and state laws. Items to be sold from a flame retardant 20'x 40' canopy
tent.
E. Signage: Two 2.5' X 10' and one 4' X 20' to be hung from tent. Small
directional signs prior to the entrances of parking lot. All signs are professionally
constructed and renderings are included with this packet.
F. Storage: fireworks and business related items to be stored in a storage
container on site.
G. Dates and hours of operation: June 15 - July 12, 2011. &00am - 9:00pm
H. Restrooms: American Fireworks customers/employees have permission to
use Jetz restrooms
I. Trash: to be removed daily from site.
Map Output
Page IofI
Heather Siegel
n
Z_ Co
y�
Legend
I> _
:R0VV
r
i
ONIN•
PROPERTY
+�T.�4�
PA VEM EDIT
ua7.
STRUCTURES
Land Use Current
aTs o„
- �
dingle Family Residential
Multi -Family Resirigntial
2f4T�i4S-0
-
r\
p
Retail and S6rvics
Govt, Inst. ano + Iitllity
Landfill, Extractive Operati
Manufacturing
#\j +r a^r.;• ?iJ;;-
l �
P e.creation • Private
MSp crested VIth AMIMS
n
-CoPyrigrd (C1 1992- �702EM inc r Feer
Recreation - Public
Agriculture and Open Spa,
EASEMENT
TN AS R\ A LTP 1' PLATS
1V
to VVATER
http:/planninizgis/scn-leVcom.esri.csriman.rsri3nav?Sen,iceNanie—Zuni i{,&ClientVersiun... 3C91'2004
American Fireworks Signage - Muskegs Je��
1 - 4' X 20' vinyl banner
m
2 5 x '1 0 V�r2'14 anne�s
mENICAN
OMME
EWORKSC)
City of Muskego
Plan Commission Supplement PC 003-2011
For the meeting of. February 1, 2011
REQUEST: Three (3) Lot Land Division — Sellhausen Property
W216 S10884 Crowbar Road / Tax Key Numbers 2283.999.001 & 2283.999.002
SW '/ & SE '/4 of Section 31
PETITIONER: Sharon Sellhausen
INTRODUCED: February 1, 2011
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 003-2011
The petitioner is proposing to divide two parcels by Certified Survey Map to create three (3) parcels. The
lots will range in size from 4.11 acres to 32.06 acres. Lot 1 contains a home and various outbuildings, Lot
2 contains one outbuilding, and Lot 3 is vacant.
PLAN CONSISTENCY PC 003-2011
Comprehensive Plan: The 2020 Plan depicts the area for Rural Density Residential uses. The
proposal is consistent with the Plan.
Zoning: The property is currently zoned RS-2 — Suburban Residence District,
which requires a minimum lot size of 40,000 SF and average lot width
of 220 feet per lot.
Parks and Conservation Plan: IThe 2007-2011 Plan does not depict any park areas on this site. The
Plan does show the wetlands on site as a High Conservation Priority,
but this area is not being affected as part of this proposal since
wetlands are already protected by state and local regulations. The
proposal is consistent with the Plan.
Street System Plan: Right-of-way is required to be dedicated as part of this CSM.
Adopted 208 Sanitary Sewer
Service Area: The parcels will be served with private on -site mound/septic systems.
The proposal is consistent with the Plan.
Dater Capacity Assessment The lot will be served with private well water. The proposal is
strict: (consistent with the Plan.
Stormwater Management
Plan: A grading plan will need to be submitted to the Engineering Department
(before building permits can be issued.
DISCUSSION PC 003-2011
Upon initial review of the CSM, the bulk requirements of the code appear to be met. Final engineering
review is pending and any review comments will need to be addressed before the CSM can be signed by
the City and recorded.
There are some notes that may need to be added to the CSM relating to one accessory on Lot 1 (to close
to the south lot line) and one accessory structure on Lot 2 (no accessory structures allowed on a vacant
lot).
Staff recommends approval subject to meeting all technical corrections received from the Engineering
Division. The Resolution is drafted accordingly.
STAFF RECOMMENDATION PC 003-2011
Approval of Resolution PC 003-2011
Resolution #PC 003-2011
LEGEND
Agenda Item(s)
Property
Zoning Districts
/"/ Right-of-way
Hydrography
Aerial Photo Date: April 2007
f I I 1 Or Prepared by City of Muskego
L—,M SIK i GO Planning Department
se —
- . 1/24/2011
Supplemental Map
Property Owner:
Sharon Sellhausen
W216 S10884 Crowbar Drive
RESOLUTION #P.C. 003-2011
APPROVAL OF A THREE LOT CERTIFIED SURVEY MAP FOR THE SELLHAUSEN PROPERTY
LOCATED IN THE SW 1/4 & SE'/4 OF SECTION 31
(TAX KEY NOS. 2283.999.001 & 2283.999.002 / W216 S10884 CROWBAR DRIVE)
WHEREAS, On December 20, 2010 a Certified Survey Map was submitted by Sharon Sellhausen for
a three (3) lot land division located in the SW 1/4 and SE'/4 of Section 31 (Tax Key Nos. 2283.999.001
& 2283.999.002 / W216 S10884 Crowbar Drive), and
WHEREAS, The three parcels vary is size from 4.11 acres to 32.06 acres, and
WHEREAS, Said property is currently zoned RS-2 — Suburban Residence District requiring minimum
lot size of 40,000 square feet and an average minimum width of 220 feet, and
WHEREAS, The 2020 Plan depicts the area for Rural Density Residential uses and the proposal is
consistent with the plan, and
WHEREAS, Said parcels will be serviced by private on -site mound/septic systems and private water
wells, and
WHEREAS, Lot 1 contains a home with various outbuildings, Lot 2 contains one outbuilding, and Lot
3 is vacant.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map
submitted by Sharon Sellhausen for a three (3) lot land division of the property located in the SW '/4
and SE '/4 of Section 31 (Tax Key Nos. 2283.999.001 & 2283.999.002 / W216 S10884 Crowbar
Drive), subject to resolution of technical discrepancies as identified by the City Planning Department
and City Engineers, and payment of all applicable fees in Section 18.14(3) of the Land Division
Ordinance and outstanding assessments if applicable.
BE IT FURTHER RESOLVED, That all technical corrections from the City will need to be addressed
before the Certified Survey Map can be signed and recorded.
BE IT FURTHER RESOLVED, That a digital file of this CSM shall be submitted to the City in
accordance with Common Council Ordinance No. 1118 and Resolution 196-2002.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: February 1, 2011
ATTEST: Kellie McMullen, Recording Secretary
JAN 1 7 Mil
CERTIFIED SURVEY MAP NO.
PART OF THE NORTHEAST AND THE NORTHWEST 114 OF THE SOUTHWEST 1/4 AND THE NORTHEAST
AND NORTHWEST I /4 OF THE SOUTHEAST 1/4 OF SECTION 31, TOWN 5 NORTH, RANGE 20 EAST. IN THE
CITY OF MUSKEGO, WAUKESHA COUNTY, WISCONSIN.
4DT Z I IQ - Li
CSM 10168 CSAI-1DTfi8
j CROWBAR DRIVE
N 0216'41" �W 778.10'
L
CORNER 2.0' S
LOT 1 1 S1pRr
CSMv10616 CARAGE
13UILUJNG
CORNER 2 !' 5
PO
3+
UNPLATTEU LAND
w
iD
N
W
L LINE SW 1/4 =
1331.44'
tt a2'40'38" w
SE COR SW 1/4
31--5-70
CONC MON
W/BRASS CAP 100
N. 312,526.51
E 2,480.484 68
t-
I INI'I A I II I l i AND
Cl 5.447 S.F. DEO. FOR
ROAD PURPOSES
G G
r~
N N
1,396,550 S.F.
32.06 ACRES
60' WIDE DRAINAGE
012
119,040 S I'
4 11 ACRES
N
W
L4
EC,31-5-20
y 177,07'
NUM
�4
UNPLAT7LD LAND
sa.W
BLOCK AND
FRAME BARN
5,531 S.E.
11,607 S.F. CROSS
1ST FL CAD E07
2NO EI CRD m
aRD FL CAD 823
METAL AND
CONCRETE1,-D
lJ01
�
5.F,
1[75,559
S.f
�149
j
NE COR SW 1/4
4.14 ACRES
31-5•-20
A FRAME 91E6
CONIC WON
'
CRD 8pB S,F
W/BRASS CAP
y
FRAME
N. 315,186,32
SITED
E. 2,488,360A0
FRAME BARN
�1 cJ P2B S.F-
99r ST 805 .
Bp7_. _
555.09'
L16
2663.60'
(M)
-2s6z.Be
PEAR
{R)
BLOCK AND
1
FRAME BARN
Hi ❑CK AND �.
_FRAME
1,214 ST CRp- BOB
FRAME BARN
FLOODPLAIN LINE `. 5•flIT sr. GRp at)"
DWELLING
1,BB8 5.E CRD- B17
> LEVr781.2 FRAML sueo
,357 S.F. CRO (Ica
15' WETLAND BUFFER/ i
PRESEJVATIOI� EASEidENT ,
. `
I}NPi ATTFD t AN{]
WETLANDS AS OEUNEATED�
• BY J. D. KNOWLES l +
& ASSOCIATES, INC.
ON APRIL 6, 2006
c0
N
ORDINARY HIGH WATER ' ■
�p MARK EL 800.5� LAKE
DENOON
V
GRAPHIC SCALE
m ma 0 130 300
ca �. Li❑
1 inch = 300ft.
THIS INSTRUMENT DRAFTED BY MICHAEE J, BERRY
F+tw~l
4c,ti . •'t
CAPITOL SURVEY ENTERPRISES
3457 N MAYFAIP RD SUIT 240
WAUWAY02A, WI 53226
PM.' 14141727.7�StO
FAX:
(41 4)727 751 E
WWW,CAFIT0L5URVRT COM
VICINITY SKETCW
SE 1/4 & SW 1/4
SEC. 31, T5N, R2DE
CROWBAR DRIVE
SW 1/4
SEC 31
C
rn
SE 1/4
SEC 31
LAKE
D£NOON
SCALE: I' = 2000
PREPARED FOR:
SHARON SELLHAUSEN
W21 6 S 10884 CROWBAR RD
MUSKEGO, WI 53150
0 INDICATES SOIL BORING LOCATION.
Q INDICATES 1 INCH DIA, IRON PIPE
FOUND.
Q INDICATES 1 INCH DIA. IRON PIPE, 18
INCHES IN LENGTH, WEIGHING 1.13 LHS
PER LINEAL FOOT, SET,
ALL DIMENSIONS SHOWN ARE MEASURED
TO THE
NEAREST HUNDREDTH OF A FOOT.
ALL BEARINGS SHOWN ARE REFERENCED
TO THE WEST LINE OF THE SE 1/4 OF
SECTION 31-5-20, WISCONSIN STATE
PLANE COORDINATE SYSTEM, SOUTH
ZONE, NAD 27,
PROPERTY ZONED: RS-2. SETBACKS;
FRONT - 40'. FIRST SIDE - 15'. OTHER
SIDES AND REAR - 20%
V. 1
OF
= MiCHAE=L J.
BERRY
•� a
1 ) R T,"
'Ir171I;r; l,i�1111i111�
1 r 1 �pPAGE t OF 6
City of Muskego
Plan Commission Supplement PC 071-2010
For the meeting of. February 1, 2011
REQUEST: Building Site and Operation Plan and Rezoning for Willow Glen Development
W182 S8450 Racine Avenue / Tax Key Nos. 2223.998.004, 2223.998.005, 2223.998.006
SW '/ and SE '/4 of Section 16
PETITIONER: DAAR Engineering on behalf of Hoffmann Management
INTRODUCED: February 1, 2011
LAST AGENDA: N/A
PREPARED BY: Adam Trzebiatowski, AICP
BACKGROUND PC 071-2010
The petitioner is proposing to construct eleven (11) new 4-unit buildings within their existing complex.
The proposal also includes renovations to the four (4) existing apartment buildings on the property and
the addition of two new garage structures, one with a commons area within it.
To facilitate all of this, a rezoning is required. The property is currently zoned RM-1 Multiple Family
Residence District and RS-2 Suburban Residence District and a petition for rezoning was submitted as
part of this proposal requesting that the zoning designation change to a Planned Development District
based upon the RM-1 and RM-2 zoning districts. The proposal fits within the densities identified within
the 2020 Comprehensive Plan. A Public Hearing for this rezoning request was held on September 28,
2010 and details from the hearing can be found below.
PLAN CONSISTENCY PC 071-2010
Comprehensive Plan: The 2020 Plan depicts the existing buildings as high density residential
use and the remaining areas as medium density residential use. The
proposal is consistent with the Plan.
Zoning: The property is currently zoned RM-1 Multiple Family Residence District
and RS-2 Suburban Residence District and a petition for rezoning was
submitted as part of this proposal requesting that the zoning
designation change to a Planned Development District based upon the
RM-1 and RM-2 zoning districts. Setbacks, offsets, floor area ratio, and
open space all meet the objectives of the code.
Parks and Conservation Plan: The 2007-2011 Plan does not depict any park areas on this site. The
Plan does show the wetlands on site as a Low Conservation Priority,
but this area is not being affected as part of this proposal since
wetlands are already protected by state and local regulations. The
proposal is consistent with the Plan.
Street System Plan: All roads have been dedicated to their ultimate widths. The proposal is
consistent with the Plan. As part of the proposal, the dedicated right-of-
way known as Willow Glen Road and the vacant right-of-way to the east
of the property will both need to be vacated.
Adopted 208 Sanitary Sewer Public sanitary sewer currently serves the property. Further analysis
Service Area: will need to be done to check for sizing and capacity. Improvements to
the system may be required. The proposal is consistent with the Plan.
Water Capacity Assessment The property is currently served by a private well, but as part of this
District: project public water service will be provided to this entire complex.
Preliminary reviews indicated that the water main may need to loop to
the existing water system in the subdivision to the east. Further review
will be required. The proposal is consistent with the Plan.
Stormwater Management Stormwater management will be accounted for in a new pond to the
Plan: rear of the property. There will be grading occurring through the site to
facilitate this new development and to correct existing problems. The
proposal is consistent with City ordinances.
DISCUSSION PC 071-2010
The proposal contains a narrative, site plans, a landscaping plan, grading plan, utility plan, floor plans,
building elevations, and a colored rendering.
RF70NING
In order for this project to proceed as proposed, a rezoning is required. The existing apartments are
zoned RM-1 Multiple Family Residence District and the remainder of the site is zoned RS-2 Suburban
Residence District. The petitioner is requesting a rezoning to a Planned Development (PD) District based
upon the requirements of the RM-1 and RM-2 zoning districts. The Planned Development district allows
the total lot area (including wetlands, floodplains, etc.) to be used within the density calculations. As part
of this rezoning request, no changes to the 2020 Comprehensive Plan are required or being asked for.
The 2020 Comprehensive Plan depicts the existing buildings as high density residential use and the
remaining areas as medium density residential use. The following show the breakdown of the density
calculations.
Existing Density Used:
RM-1 Zoning District (5,000 SF of land required per unit) and 2020 Comp Plan designated High
Density Residential Area
0 32 units existing x 5,000 SF = 160,000 SF required for 32 units
o Leaves 17,631 SF of area of unused density
Proposed Density Used:
Remaining RS-2 zoned lands = 577,516 SF
o 577,516 SF + 17,631 SF (unused RM-1 from above) = 595,147 SF (13.66 acres)
0 13.66 acres x 2.99 units (2020 Plan Medium Density Res. allowance) = 40 additional/new
units
o 40 new units + 10% possible bonus = 44 new units
Total possible unit count: 32 existing units + 44 new units = 76 total units
Note: The calculations provided for the RM-2 area on page 5 of the submittal do not include 17,631 SF of
unused density area within the RM-1 area, which are included above.
The 10% bonus that is listed above is not guaranteed, but is this case is being request by the developer.
The Zoning code states the following regarding the possible density bonus.
Density Bonus: The total allowable maximum density in a planned development may
increase no more than 10% above the amount of units calculated in Section 9.02(3)D
above upon recommendation of the Plan Commission that the increased density is
justified in terms of the relationship to open areas, service demand, and the total quality
and character of the project. In no case, however, shall the provisions of Section 9.04 be
waived.
Based upon this, the petitioner has stated the reasons that they are requesting the bonus units on pages
17-19 within their submittal.
This proposal would max out all possible densities, unless a Comprehensive Plan amendment would be
requested at a later date. The densities and sizes listed above assume that the existing Willow Glen
Road would be vacated. All approvals would be subject to this occurring.
SIDE NOTE: Routinely the Planning Commission requests what the current zoning might allow in density
opposed to using the Comp Plan as governing what density may be allowed on a parcel. Thus, staff has
calculated what the current RS-2 zoning district would allow the parcel in density for Council's reference.
The RS-2 zoning allows one unit per 20,000 SF. Given that approximately 595,147 SF of land is leftover
for development you might find approximately 29 units/parcels in this area (595,147/20,000). However, if
you were completing a yield plan you would most likely factor out about 30% for roads and stormwater
which would equate to about 20 units/parcels. Also, a single-family development may make it more
practical to connect the unimproved right-of-way to the east to this potential single-family development.
PUBLIC HEARING
The Public Hearing was held on September 28, 2010 for the rezoning request. The minutes from the
Public Hearing are attached showing the comments that where presented at the hearing.
ARCHITECTURE/BUILDING ELEVATIONS:
The building design is governed by the General Design Guide. Staff feels that the proposed building
meets the general requirements and will provide this site with a quality structure. The structures are built
with four-sided architecture in mind and have masonry materials on all elevations. The percentage of
masonry is as follows:
Each Side — 47%
Rear (Type A) — 63%
Rear (Type B) — 73%
Front — 40%
Overall Type A — 51.6%
Overall Type B — 54.3%
The materials include dimensional brick, cement board siding, vinyl clad windows, composite trim, and
architectural shingles. All of the new buildings have the same floor plan, but there are two varying roof
styles that are being proposed. At this time all of the new buildings are proposed to have the same color
scheme. The colors are earthtones as shown on the submitted rendering.
As part of the proposal, the four (4) existing buildings on site are also going to be remodeled to improve
the general look of the overall complex and to complement the newly proposed structures. These
structures are going to contain many of the similar materials and colors that are proposed on the new
buildings. There is going to be a new entry area added to the buildings, along with new windows, siding,
decking, soffit and fascia, and gable roof ends. These upgrades will be a nice improvement to the
existing complex. The proposal also includes the removal of the existing commons building. This is
going to be replaced with two new enclosed garage structures. One structure will contain four (4) new
enclosed stalls and the other will contain ten (10) new enclosed stalls with a two-story common area in
the center of the building. These garages are proposed to be clad with 100% cement board siding. Staff
suggests that per the design guide suggestions, there should be at least 50% masonry on the front and
sides of the garage structures. This will help them further blend with the remodeled existing building and
the newly proposed buildings.
Other than the minor concerns mentioned above, staff does not have an issue with the designs,
materials, or colors proposed. The proposed buildings are consistent with the General Design Guide
requirements.
SITE PLAN:
The existing site consists of a divided entry driveway leading back onto the property where the existing
buildings are set. Currently on site there are four (4) — eight (8) unit apartment buildings, along with a
commons building, two sheds, and a single-family home. As part of the proposal the single-family home
and the commons building will be removed. All parking is currently not enclosed in various small parking
areas.
The new units will be located along a new curbed semi -circle road (private) that will loop towards the east.
All of the new buildings will face inward to the new road. They are proposing seven (7) buildings on the
outside of the circle and four (4) on the inside of the circle.
As part of the overall site improvements, the entry drive is shown to be reconstructed to a non -divided
two-way road/drive. There will be grading done as part of this to alleviate past drainage issues with the
adjoining church property to the south. The plans currently show curbing only within the new looped
road, but staff suggests that curbing be added to all new paved areas, specifically along the new entry
drive, up to where the southern leg of the new loop starts.
PARKING:
Each new unit includes two (2) enclosed parking stall and two (2) driveway spots. This more than meets
the code requirements. There are two garage structures being added for the existing buildings. This will
add a total of 14 new enclosed parking stalls. The placement of these will eliminate some of the existing
parking. A new full site parking plan will need to be submitted before the issuance of permits to ensure
that there will be enough parking remaining throughout the entire site.
All driving lanes are currently illustrated at 24 feet or wider in width. Fire Department review is pending
and all concerns of theirs will need to be addressed before permits can be issued.
SITE LIGHTING:
No specific light details have been provided at this time. Any lighting (pole or wall mounted) will need
approvals from the Community Development Department. A photometric plan will need to be provided
showing that the lighting meets the City's 0.5 foot-candle requirements. All pole lights will have to adhere
to the 6-inch max base height requirement.
SIGNAGE:
No new signage is proposed at this time. Any new signage or signage changes (temporary or
permanent) will require formal approval from the Community Development Department.
LANDSCAPING
A landscape plan has been submitted. The City Forester is reviewing the plan and will forward any
corrections, additions, and/or comments to the petitioner. Some modifications may be necessary. The
resolution is drafted to allow City Forester approval of a plan before building permits are issued.
New landscaping is being shown through out the site. There is some landscaping being added to the
eastern portion of the site, which is within the permanent open space area. The Plan Commission will
need to decide if they are satisfied with the proposed plantings on the eastern portion of the site or if they
would like a denser screen. The current proposal will serve as a more natural landscape buffer, but will
not serve as a dense screening wall of vegetation. If a denser screening wall is desired, then the City
Forester's suggestions are to include a more concentrated, staggered line of coniferous trees. The
nearest home to the east of the proposed new buildings is about 500 feet away. There needs to be some
basic landscaping added around the existing buildings on site since improvements are occurring to these
too. This can be included on the revised landscape plan.
DUMPSTER ENCLOSURE:
Currently the refuse/recycle containers (including dumpsters) are all unscreened on site. With this
redevelopment, all (throughout the old and new areas) refuse/recycle containers must be located within
solid board on board enclosures. Plans of the enclosures and their locations will need to be submitted
and approved before permits can be issued for construction of the new buildings.
INFRASTRUCTURE:
As is noted above, the property is currently served by a private well, but as part of this project public
water service will be provided to this entire complex. Preliminary reviews indicated that the water main
might need to loop into the existing water system in the subdivision to the east. Further review will be
required.
Public sanitary sewer currently serves the property. Further analysis will need to be done to check for
sizing and capacity. Improvements to the onsite, as well as downstream system, may be required based
upon further information and review.
A new stormwater management pond is proposed in the northeast portion of the site. Formal review and
approval of the stormwater plans and calculations will need to occur before any permits can be issued.
PAST SUBMITTALS/REQUESTS:
The Plan Commission previously reviewed two different rezoning concepts. In 2007 the owner came
forward with a conceptual rezoning request through the Plan Commission. That proposal was for 44 units
on less acreage. This layout consumed the entire vacant area. There were not any large open space
areas present for buffers to the surrounding parcels. The 4 unit structures would have backed right up to
the single-family residences to the east. This concept was denied by the Plan Commission for a variety
of reasons, but most importantly because the plan did not meet the 2010 Comprehensive Plan.
In early 2010 the owner came back with a significantly revised plan for another conceptual rezoning
review. This new plan still included 40-44 new units, but now the site was more concentrated towards the
western half of the site, which then leaves the eastern portion of the site as open space. The plans also
included updates to the existing buildings on the property, the possible addition of new garages, and the
possible vacation of the un-built right-of-way stemming from the Country Brook Estates Subdivision.
Overall the Plan Commission seemed favorable with this general idea, as long as all of their concerns
were looked aUaddressed (vacate ROW from Country Brook Estates, keep open space buffer to
surrounding properties, rehab the existing apartments at same time as building any new units, redo
entryway road to development).
MISCELLANEOUS:
As part of the overall project, there are two right-of-ways that are proposed to be vacated. One is the
Willow Glen Road right-of-way, which is the area that encompasses the existing entry to the site. The
other one is the right-of-way that is unimproved that leads from the subdivision to the east to this site. As
part of this development, there is no chance that this right-of-way stub will continue or be improved, so it
is going to be vacated. This was one of the concerns of the neighbors to the east. All right-of-way
vacations will be done at the expense of the developer/owner of this project. These vacations will need to
be handled through a separate right-of-way vacation process.
Relating to the possible timeframes for this project, the petitioner has included a phasing/timing
milestones list. These phasing/milestones will need to become part of the Developers Agreement that will
be needed for this project. To summarize, the existing buildings would be modified first, along with the
site grading and infrastructure improvements/installations, then some new buildings would be constructed
along with the perimeter landscaping/screening, then more new building construction with the loop road
construction, then the new garage structures will be constructed, and finally the remaining building will be
built.
Along with the Developers Agreement and the right-of-way vacation, there will also need to be a formal
condominium plat approved and recorded for this development.
STAFF RECOMMENDATION PC 071-2010
Approval of Resolution PC 071-2010; Seeing that the proposed development meets the
Comprehensive Plan, the proposed multi -family land uses should work well in this area of the
community (the location is located off of a County Highway, close to existing multi -family uses,
and surrounded by numerous environmental features), and will provide a larger tax base.
NOTE: The resolution is written to recommend approval of the 10% density bonus the Planned
Development district allows. Plan Commission will need to determine if they see this as being fit
based on the developer's proposed reasons from pages 17-19 of their submittal.
Resolution #PC 071-2010
LEGEND
Agenda Item(s)
Property
Zoning Districts
/"/ Right-of-way
Hydrography
Aerial Photo Date: April 2007
�� [ [II 11v O)^Fr 1 Prepared by City of Muskego
1.1U,7Ii FG❑ PI/24/2011anning epartment
Supplemental Map
Property Owner:
David Hoffmann
W182 S10884 Crowbar Drive
RESOLUTION #P.C. 071-2010
APPROVAL OF A BUILDING SITE AND OPERATION PLAN AND RECOMMEDNATION TO
COUNCIL FOR A REZONING FROM RM-1 AND RS-2 TO A PLANNED DEVELOPMENT
DISTRICT FOR A MULTI FAMILY DEVELOPMENT KNOWN AS WILLOW GLEN
DEVELOPMENT LOCATED IN THE SW '/4 & SE'/4 OF SECTION 16 (TAX KEY NOS.
2223.998.004, 2223.998.005, 2223.998.006 / W182 S8450 RACINE AVENUE)
WHEREAS, Updated plans were submitted by DAAR Engineering on December 10, 2010 for a
Building, Site and Operation Plan and Rezoning for Willow Glen Development located in the SW
'/4 and SE '/4 of Section 16, and
WHEREAS, The petitioner is proposing to build eleven (11) new 4-family buildings on the
undeveloped portion of their property, and
WHEREAS, The proposal also includes renovations to the four (4) existing apartment buildings on
the property and the addition of two new garage structures, one with a commons area within it,
and
WHEREAS, Said property is currently zoned RM-1 Multiple Family Residence District and RS-2
Suburban Residence District and a petition for rezoning was submitted as part of this proposal
requesting that the zoning designation change to a Planned Development District based upon the
RM-1 and RM-2 zoning districts, and
WHEREAS, The 2020 Comprehensive Plan depicts the existing apartment buildings as high
density residential use and the remainder, and bulk of the property, as medium density residential
use and no amendments are required to the plan as part of this proposal, and
WHEREAS, The existing (32 units) and proposed (40 units plus 4 possible bonus units) density
fits within the allowance of the 2020 Plan, and
WHEREAS, With Planned Developments there can be up to a 10% unit/density bonus granted by
the City, thus four (4) extra units are being proposed to bring the total new unit count to 44 units,
and
WHEREAS, The overall site development, as proposed with 44 new units, would max out all
possible densities for this land area, unless a future Comprehensive Plan amendment would be
requested, and
WHEREAS, A public hearing was scheduled before the Common Council for the rezoning on
September 28, 2010, and
WHEREAS, The proposal conforms to the bulk requirements of the zoning district, and
WHEREAS, Said property is subject to the design standards outlined in the City of Muskego's
General Design Guide, and
WHEREAS, The structures are built with four-sided architecture in mind and has masonry
materials on all elevations, with the following percentages:
• Each Side — 47%
• Rear (Type A) — 63%
• Rear (Type B) — 73%
• Front — 40%
• Overall Type A — 51.6%
• Overall Type B — 54.3%
WHEREAS, The materials include dimensional brick, cement board siding, vinyl clad windows,
composite trim, and architectural shingles, and
WHEREAS, All of the new buildings have the same floor plan, but there are two varying roof styles
that are being proposed, and
WHEREAS, The colors proposed are earthtones as shown in the submitted rendering, and
WHEREAS, As part of the proposal, the four (4) existing buildings on site are also going to be
remodeled to improve the general look of the overall complex and to complement the newly
proposed structures, and
WHEREAS, These structures are going to contain many of the similar materials and colors that
are proposed on the new buildings and there is going to be new entry areas added to the
buildings, along with new windows, siding, decking, soffit and fascia, and gable roof ends, and
WHEREAS, The proposal includes the removal of the existing commons building, which is going
to be replaced with two new enclosed garage structures, and
WHEREAS, The two new garage structures are being added for the existing buildings and will add
a total of 14 new enclosed parking stalls, and
WHEREAS, One garage structure will contain four (4) new enclosed stalls and the other will
contain ten (10) new enclosed stalls with a two-story common area in the center of the building,
and
WHEREAS, The new garages are proposed to be clad with 100% cement board siding, and
WHEREAS, Currently on site there are four (4) — eight (8) unit apartment buildings, along with
commons building, two sheds, and a single-family home and the single-family home and the
commons building will be removed, and
WHEREAS, All parking is currently not enclosed in various small parking areas on site, and
WHEREAS, Each new unit includes two (2) enclosed parking stalls and two (2) driveway spots,
which more than meets the code requirements, and
WHEREAS, The new units will be located along a new curbed semi -circle (private) road that will
loop towards the east and all of the new buildings will face inward to the new road, and
WHEREAS, As part of the overall site improvements, the entry drive is shown to be reconstructed
to a non -divided two-way road/drive and there will be grading done as part of this to alleviate past
drainage issues with the adjoining church property to the south, and
WHEREAS, The plans currently show curbing only within the new looped road, and
WHEREAS, The parcels are currently serviced by municipal sanitary sewer and by private water,
and
WHEREAS, As part of the development plan, public water service will be provided to the entire
complex along with municipal sanitary sewer, and
WHEREAS, A new stormwater management pond is proposed in the northeast portion of the site,
and
WHEREAS, Each new unit includes two (2) enclosed parking stalls and two (2) driveway spots.
This more than meets the code requirements, and
WHEREAS, All driving lanes are illustrated currently at 24 feet in width or larger, and
WHEREAS, No signage is proposed at this time, and
WHEREAS, No specific light details have been provided at this time, and
WHEREAS, A landscape plan has been submitted showing landscaping throughout the site and
the City Forester is reviewing the plan and will forward any corrections, additions, and/or
comments to the petitioner, and
WHEREAS, As part of the overall project, the Willow Glen Road right-of-way, which is the area
that encompasses the existing entry to the site, and the right-of-way that is unimproved that leads
from the subdivision to the east to this site are going to be vacated, and
WHEREAS, Currently the refuse/recycle containers (including dumpsters) are all unscreened on
site, which is not allowed when sites are being upgraded or expanded.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building, Site and
Operation Plan and Recommendation to the Common Council for a rezoning from RM-1 and RS-
2 to a Planned Development (based upon the RM-1 and RM-2 requirements) for the proposed
improvements and additions for Willow Glen Development located in the SW '/4 and SE '/4 of
Section 16.
BE IT FURTHER RESOLVED, That a new full site parking plan will need to be submitted before
the issuance of permits to ensure that there will be enough parking remaining throughout the
entire site.
BE IT FURTHER RESOLVED, That per the design guide suggestions, there should be at least
50% masonry on the front and sides of the new garage structures, and
BE IT FURTHER RESOLVED, That curbing needs to be added to all new paved areas,
specifically along the new entry drive, up to where the southern leg of the new loop starts.
BE IT FURTHER RESOLVED, That formal reviews of the municipal sanitary sewer and municipal
water plans will need to occur and be approved, and based upon said review, changes and/or
upgrades could be required based upon preliminary reviews.
BE IT FURTHER RESOLVED, That changes and/or upgrades for the water could include the
water main looping into the existing water system in the subdivision to the east.
BE IT FURTHER RESOLVED, That changes and/or upgrades for the sanitary sewer could include
improvements to the onsite, as well as the downstream system.
BE IT FURTHER RESOLVED, That formal review and approval of the stormwater plans and
calculations will need to occur before any permits can be issued.
BE IT FURTHER RESOLVED, That all right-of-way vacations will be done at the expense of the
developer/owner of this project and these vacations will need to be handled through a separate
right-of-way vacation process that must occur before any new building permits can be issued.
BE IT FURTHER RESOLVED, There needs to be some basic landscaping added around the
existing buildings on site since improvements are occurring to these and this can be included on
the revised landscape plan.
BE IT FURTHER RESOLVED, That if a denser screen is desired along the eastern lot lines, then
the City Forester's suggestions are to include a more concentrated, staggered line of coniferous
trees.
BE IT FURTHER RESOLVED, That City Forester approval of the landscape plan must be
accomplished prior to the issuance of building permits.
BE IT FURTHER RESOLVED, That with this redevelopment, all (throughout the old and new
areas) refuse/recycle containers must be located within solid board on board enclosures and
plans of the enclosures and their locations will need to be submitted and approved before permits
can be issued for construction of the new buildings.
BE IT FURTHER RESOLVED, That all concerns from the Fire Department review will need to be
addressed before permits can be issued.
BE IT FURTHER RESOLVED, That any new signage or signage changes (temporary or
permanent) will require formal approval from the Community Development Department.
BE IT FURTHER RESOLVED, That a formal Developers Agreement will be needed between the
developer and the City before any work would be able to start on site.
BE IT FURTHER RESOLVED, That a formal condominium plat must also be approved and
recorded for this development.
BE IT FURTHER RESOLVED, That any lighting (pole or wall mounted) will need approvals from
the Community Development Department and a photometric plan will need to be provided
showing that the lighting meets the City's 0.5 foot-candle requirements and all pole lights will have
to adhere to the 6-inch max base height requirement.
BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building
Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise
authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution
shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred:
Introduced: February 1, 2011
ATTEST: Kellie McMullen, Recording Secretary
COMMON COUNCIL - CITY OF MUSKEGO Approved: 10/2612010
PUBLIC HEARING MINUTES OF MEETING HELD SEPTEMBER 28, 2010
PUBLIC HEARING
The public hearing notice was read to consider the petition of Mark Taylor to rezone
property known as Tax Key Numbers 2223.998,004, 2223.998.005, 2223.998.006 and the
Willow Glen Road Right-of-way located on Racine Avenue from RM-1 - Multiple Family
Residence District and RS-2 - Suburban Residence District to a PD Planned Development
District for the purpose of allowing additional multi -family development within the Willow
Glen complex. Planned Development zonings allow flexibility within the typical zoning
guidelines.
Mr, Muenkel stated that the petition was to rezone the property to a PD - Planned
Development District. A planned development allows the petitioner to go outside the
parameters of regular rezoning because they may want to establish some unique aspects
for the overall development.
The current zoning is RM-1 - Multiple Family Residence District and RS-2 - Suburban
Residence District. The RM-1 zoning allows one unit for every 5,000 square feet of land
area. The RS-2 district allows one single-family residence for every 20,000 square feet of
land area. The petitioner would like to base the density of the planned development using
the guidelines of the RM-1 and RM-2 zoning districts. The RM-2 zoning allows one unit for
every 10.000 square feet of land area. Mr. Muenkel noted that the proposal would not
require an amendment to the existing 2020 Comprehensive Plan.
Mr. Muenkel stated the parcel is located on Racine Avenue, just south of City Hall. The
petitioner is proposing to keep the existing four buildings, which consist of 32 units, and a
commons building. Those meet the existing RM-1 zoning. The new proposal is to add an
additional 44 units within 11 new buildings. The new units would be developed to the east
of the existing buildings. The density allowed for the portion of the parcel to be developed 'IS
40 units. However, a 10% density bonus is allowed under the Planned Development
Zoning District with the approval of the Common Council_ The petitioner is requesting the
bonus, which would result in a total of 44 new units.
The Plan Commission reviewed several concept plans for this parcel several years ago.
This year, the Plan Commission looked favorably at the type of concept being proposed
with several parameters being met prior to the rezoning being approved. Those include
updates to the existing buildings, a substantial amount of open space to serve as a buffer,
and the possible vacation of the right-of-way from the Country Brook Subdivision.
Ald_ Werner noted that however the parcel is developed, storm water management is a big
concern and must be addressed so there is no impact to the adjacent subdivisions.
The following individuals stated their concerns about the rezoning:
Donna Engler, W177 S8341 Clearbrook Drive
• Opposed
• Property values could be affected
• Prefers solitude and quietness of her subdivision
• Concerned that additional units will create drainage issues
Common Council PubliC Hearing Minu!,'s
Page 2
September 28. 2010
Warren Voeks. S83 W17457 Cedarcrest Lane
• Concerned with the egress and ingress
• Would like the unbuilt road right-of-way vacated
• Not opposed to the apartments
• Concerned with storm water issues
Troy Vande Yacht, S84 W17749 Orchard Court
• Opposed - keep existing zoning
• Prefers residential development vs, multifamily
• Would also like the road right-of-way vacated
• Concerned about the flexibility that the Planned Development District allows
Georgiane Berich, W177 S8375 Clearbrook Drive
• Lives next to the egress
• Concerned about the development of multifamily
• Significant number of unknowns regarding the development
• Would like to retain property values and integrity of the subdivision
Steve Dryia, W182 S8394 Racine Avenue
• Are sewer laterals large enough to handle additional units?
• Is existing access road large enough to handle additional traffic?
• Will crime increase?
• A previous concept plan was for 26 units: what happened to it?
• Is access sufficient for emergency vehicles to get to the site?
Mr. Mark Taylor of Landcraft Survey & Engineering appeared on behalf of the developer.
He noted that the plan did take the adjacent subdivision into consideration. He agrees that
the road right-of-way should be vacated and that as much open space as possible should
be preserved. Mr_ Taylor also noted the following about the proposal:
• The buildings are more than 420 feet away from the property line.
• Storm water management will be addressed. The developer is required to control all
the water from the site. The development would actually provide for an on -site
retention pond where there currently isn't any.
• Entry road would be rebuilt. The issue of access for emergency vehicles would be
addressed.
• The existing buildings will be upgraded. Some of the improvements, such as window
replacement, have already begun.
• More landscaping will be done to improve the development.
• Private outdoor entries and two -car garages will be provided. All the garages will face
into the property.
• The existing buildings are on wells. It is proposed that all the buildings would connect
to City water service.
• The existing community building would be demolished and replaced with a new one.
The Mayor closed the public hearing.
.A
=rc.+LME ARE^ -6:54: 51
WA , .Ftr.A4Rw :-I-W 5% IN 5F
ct6% u 3 %
�!6
w
^AGaCf AEA SF 1 306 5F
V U R AC.EA 301 Y b14 SJ
PEA!!!
I!fi.,kLW- AJUA aw v
WA5WZY AREA: i59 v
Project: Willow Glen Neighborhood Phasing Timing Milestones
Us 'nOctober 201C
Rev: 14 January 2011
Phase 1(a)
Remodel of Existing Buildings Early Spring (Aprils worts will begin on the first two buildings for exterior
improvements as presented in our plan.
Phase 1(b)
Site Grading and infrastructure Following Phase 1(a) and upon final engineering plan approval work will
begin with mass grading, stormwater management work and utility
placement.
Entry Road Reconstruction Reconstruction of the entry road will also include a first lift for the first four
new buildings.
Remodel of Existing Buildings Concurrent with the other components of this Phase the exterior
improvements on the remaining two buildings will be underway.
Phase 2(a)
New Building Construction We are currently scheduling the construction of two new buildings to occur
in mid to late summer.
Site Landscaping Improvements Site landscaping elements will be underway focusing on perimeter
screening and open space areas.
Phase 2(b)
New Building Construction New building construction will continue beginning late fall or early spring of
the following year. Construction of units will occur at minimum of 2
buildings at a time until a minimum of 6 new buildings are constructed on
site.
Loop Road Development
Phase 3
The first lift of the loop will be completed to assure proper emergency
service is available.
New Garage and Community Room Following the construction of at least 6 new buildings, the next
construction season is scheduled for implementation of the new garage
and community room facilities. We would like to reserve the ability to
move the construction of these facilities further up in the schedule should
the development performance exceed our expectations.
Phase 4
New Building Construction The remaining five buildings will be constructed at either one or two
structures at a time.
Table of Contents:
DAAR Engineering, Inc.
Engineers - Planners - Surveym - Arctnrtecls
Project Information 2
Site and Environmental Information 3
Site Development Plan 5
Operational Considerations 9
Building Design 13
Other Pertinent Information 19
Appendix; Site Design Evolution 20
DLL lU2010
Me of land Development Services
I
FLoject__Infor.mation;
1) Owner: Hoffmann Management
P.O. Box 180552
Delafield, WI 53018
Contact: David P. Hoffman, 262.391 .7475
2) Representative: DAAR Engineering, Inc.
325 E. Chicago St, Suite 500
Milwaukee, WI 53202
Contact: Mark C. Taylor, AICP, Assoc. AIA, 414.935.4426
3) Existing Zoning: RM-1 (Multiple Family Residential)
RS-2 (Suburban Residence District)
Proposed Zoning: PDD (Planned Development District - RM-11RM-2)
4) Existing Land Use: Medium Density Residential (2.99 Units per Acre)
Apartment Living & Single Family Home
S) Proposed Land Use: Medium Density Residential (2.99 Units per Acre)
Apartment Living & Preserved Open Space
6) 2020 Land Use Plan, Medium Density Residential (2.99 Units per Acre)
NI 111111 � ����r
out
11 �''�i ■i i� iiii► -
DAAR Engineering, Inc. Offm of Land Deyelap"nt S"rnm
Engineers - Planners - Surveyors - Arcliftem 2
Site and Environmental Information,
7a) Site Description The existing site is composed of four apartment buildings
with surface parking and 1 single family home. The
remainder of the site is utilized for small crop farming.
To the North and West lies other multi -family development
with single-family development East and three single-
family homes to the West. A church is located to the South
as well as undeveloped woodland.
7b) Ground Cover The existing vacant land is a combination of manicured
lawn, tillable land and encroaching wetlands from the
North.
7c) Topography Existing development (and proposed) is on the high
ground of the site with existing topography sloping to the
site's natural low spot on the north and north east sections
of the site.
7d) Infrastructure The site is currently served by municipal sewer for the
multifamily and septic for the existing home. Water is
currently supplied via private well. (City Water & Sewer is
proposed with new plan.)
The site is accessed via Willow Glen Road to the West and
an undeveloped Right -of -Way from the single-family
development to the East.
QAAR Engineering, Inc,
Engineers - planners - Surveyors - Archi ecLs
Office of Land Development Services
3
w �� 2o1G PLAT OF SURVEY
surrey Ill 070r
IMprr) F w a
wA V vw-we. uc
LOCATION: W 182 S8450 Racine Avenue. Mefsk"o- Wcoonsin aeaT Au Cbih-
wea at m 5= a
LEGAL DESCRIPTION:
P.0 ea. ,uyAZ
CERTIFIED SURVEY VAP NO. T05E7
8" a reeirieim d Paraal C of CERTIFIED SURVEY ALAP NO.625. Pal EaI D of CEXfW- SURVEY A44P NO, 993.
a•,d CERTIFIED SURVEY MAP NO. f29s. locals in V* koromat Ifs d sfr SouVrwes! 114 ana Vw NorVnrefe 114 dtlw
Sounsaa IIL Y9 in S"m 16. Towneop 5 Norm. Ranpe 20 EasL CRyof AkeN,ap[r. WmAft w C.&^. Wb"mi r
----
RACINE AVENUE
^---
i 1 l s�. .. ••,
I + M1 IYaa•ii>?rE 75N sa' e _ - r ir7Q
f - m.rr • 9B st. - _ `_ w,r '� Ass
gen.
� �T \' 1 f''~ � _ - - + - - ��• l-- l-- / xw.•�e ra.� 1- �`r-� I _ _ -
1'Ar_ '* �- _ �r �• . . �! . j, / .wanuw�_, li - 4�G
let-
1 I NIETLANBLIfiETRBLE - --- -'----- �C �� � rI. L�1 q �a� . � =�! `�,� y � eo �� ��• - f � � Y ����
LM LENGTH BEARING ]t 1ura. w.•]. _-4 gip ! y ' � x. � �N� ; •�••, ••• • _ / �.� _ r.7� ►
I I w, r, era Mls•on r-€ cl�wwwra zrb �� c..... `� r.� �. �� a T � ,� � ' � -��
-
C T.Ii. 'Y- Per M/hcarnyin f+ `a!r ^ m•soc€
f _ �� / _ +�tf = _ J.' rn �: ` _ _ - _ _ y ►
Depsronenld I j m .ace Wmw! rwwR 1 r •1• Y� .0
J fff ws >mT. ryw•sssre f,.,•r 1a "^"" +•a,+n..-.. •..r.... F! �� - • r.r�.+�vr J � ,� _- �� `� �
Way Rat Prpjett NO- S I i M all s—c •� 7 Y and r ,;. crro - _ r • - - `�. �♦
J ws toes
6U 03553 ha•trsre + FL.nrn. uwwv �'J
rr { we ...r. svrrae i ""' y y-r.•. xw.ret�r a ram" Yam' ��f , ! •1 -� ��
+ w fooe SWW37E � I I � �r ._:•u.l �."' ePid ' w � - - -
..� I f rnr !r] f>zs,YSE hR'f 7f% +atlo �� f� ��= -.«
w.1 un srra,s's
+ wv Ras
t I f MSI .rSr wMYUWF �� � ws.rrfwr,ar
wo .fy le
r snf al sfrlcae
I wNc rN9P hrvsrE f��. .i i i .�yb: ' I J 3
7
r
IQI crr 5r`r1y'F lw rF r Yr f 5py
1tII 77-Ya Slf'Mm•E arlr ao .b t I•s i R.rf I P , �_ -}��i iSaffY yp
I 1 YG[1 II3,' S Pr�IW E 1N/•p7�:•E • J Mum I S - t ` _ - - _ _ - - - I Y S
rI + rCs 7aaT su•vxE r w...�� err Harr-' .^ e _ . - - S
1 --w----- w -r'..7- - f F 0-00 11 sow. i --- ---- r I ff af•-•uss r" .w.rRYa'i" r.-.n�•s I �.risr, te...'�'w �` ass.
Dr.a.+. I ..� Afr .rasa r
1 I Tyr*�I • rrs•te••: I � �w r� f � _ � f 1low �
1 I Area�u.vrr bl l '� ..c..rrr as ov rin[u y ��•lGr�.---yl7r
+� .,rw y s , _ MII'YOS� 27/.T!' r Mq•�'/7•f: T7l�iP' - � . _ _
oy
1 n+fs•a
` .Y- r--------------- c�.nro�:."•eu'.n �! f �r \ n.r. mar. ` �� _ - .�Aaefi� - - - - f _ •- - y, y _
RACINE AVENUE l f..€tl-
. csff raaar z
4a +frr/rns� -� A.I=rrq a r>sar es der r
r.:,`; ;r wsnw,r��,a ,r.�•wrvnre woae m.. rax .sn•mr. - - _Np{•.tD6"E I -, r r 2M72' -- r
-- ---=_ -ro..=-.,+.»a.:.`, r-=!' �v-
WILLOWGLENROAQ -
ji T R Y- - - _ �... r� .r•rar, _rt J__� Y - - - —� ' ' - S m.ar-
_
IY � w�•e•.•r+` � mer � hw�ry.Y '�;� Sae':7'ti•waszNe' 1 erns-,• }
q.. rwr� • 5F I
i q _ - ,�.. y,. y rwr+rr Sp.�y3•w d awlw ael40' ,: r� vnar } r '-" [t •ter• • I •w brlm hvfe s. wr«rerk sk" per.
eraawe F "� ��_•,• � �,;,�•rw ^r •w.'v rw.. �'+]1^C: p �a� w. €�� } ' ti I CcopW n %m GM Scum Zo w HAM V The Mwn kr
w .mss I I rater++-.• �i• n se••„•.rs xart w 114,31
I 01W*r, rw[s,m ceSeam fs T--v5wm R&W yo
I 31 i . fau. nr a rwrce nwrq o" 00,413r vy Vwdd e -
oo +. md w Nasurl terrsnre waew Gw,m Ih l of e SN -rw,s r ter• �JhfJ9
r cr•rr• I C i
GRAPHIC SCALE
crse.au.w �$
rwr.,,r lati rr. co- 4 a w rm
a:vr.. sr� savti arrr. I
r 1 INCH 50 FEET
AIICI' lIIESEIeYAi1OM AREA
+. c-mv IRNDCRRFT SURVEY AND ENGINEERING. INC.
6196— P *r,. m.n.W d tose[d oti.are�+F+ar'lals r o•eM�1ed. r6Yi nFWUt M 4JMYDRS AM CtA s.I3Eays
Tit ialr f ra� S�
1. Th►+w^cT,Y v � d W, ..Os Boor - e ry p7NK. MC. • pOrWrr . uave u yo..c err r. f.Y^f; S �+ N �.Qr Cw .+wV/X• RJ• OwM AW W V Cry an" mrf p r�'vwf y r� 7aCr50� d /r W7LM�r• anC War Ya NI Slr]'
rd, Ire aV[+d•,m" a are WrAmlr Cwtr Dvpw d & Parr. am Larm Ua.-:Rtr" m 2mhq P— SFA-�d varig wy' foe ,wv.cnenEam d e h . w l4ft'" No wn al vwd h- err VV.A-h. Caawp Drwanrn or PN m Lam sr. y. u�wwosre rY I. �� eowx'n
Lp wpW , ra Zw" okaecn ere p� rr* - 0.r of wq esrw w.R enaln naream"W dr d*mpW o *W%V mR of 4,"kW rewv rxwavy U*&V- Yrr be Vr+,tisr7 Tlr wn,e.�darq wq.trr.e w.r,Mn wr Pis„s7 siOduvCl%faFrsE.CW
Frwu,.,,ervy cwrre4r na q rreeea.arre Ie Awe. ece.sa n lr.+cs a r xvee.e nnuesnr v 1cc+nexY aa+rro row eb pf•+rrd orh rwI ere awnxl a ae.r,Q v..a a. wdNe wars. d sr Pnmllry Erwerr•�I Cmear .d rsr n avwsr� es.e mans. r r.. rz++r , n.. r.r. arrn,w.t ro.s or.r.e.�..p e"•
arr wa.awvu Cnvry Drarmr,+, olOy ne Lr+6 U -F%"Og Nra iw&4aw-kd * M reau r .moru rur ere m aa. aaGe+ry Su. a sow +w 575 rro 0�ac ho T3rM.Yr ravew...*.w..s++-�e-aae.�re ere.. xwn.c
s G=V t> ee,na-00 --WOO . rcrssa Dower .ec r vd+.wrs .� tre yes .en are recaA.4 d rrr cos M � vw. warcaao-a r. orno ra'o•lef4 ;� o•�reS•,`•�".-
S. Ts. rreeon,n d�R r.,KwW .a rgyw+,sa 4f rx er�q swv"rxd mil /rea area r orn�.Nra .�.v.0 rw:o. r.aA,w r,wad
M rq fine rr441eWr r1++t�. eNl.le[fY4i4 Ren•r4'r a'ef.ra
a. Cwa6we ora ererr r4-" p.wrn'7 Mka*v u osp"wp ram, tr errr HVl fnaf yR P•dNbrn !. a hA ex4 r 4 r nv t.nl,wa:en .w,w 1K i.a.�r.� r14eedwry ,ar4 ic[ 1
T. Predf "GfP€rrppfetM S,.YY.uINwCv1,ryW[rnM•e7ParVr.Clan Lev 4r'tibcd•s4`C4o.�'•d•1 or h.taal Rewaaes a.v yr M.,r CorndFryr.r>• e:b�t wopaovM[Vra.€,wrWf tr.lur�e.nlr.rMper,Y�y le,■maYL.a,o•dYr rww,wrn.•e,rncs��rsw rs +e.aae►T a.[tla'•e
b Tlr em�Y,dot o14nb]4r r orer,rlere r.yGar-wry ame u 011. 6ecaraf M r• Va�o *e *o wry►aer•�.v �arv�wrt guar a• •nwrp �a rem.
Q. Al rwrm a ra ww hs- ► 37 UlAeer b eewsr r,e nvr+orr wgcw Inn vow. nntuss aen arty car. ovcVO4 nw+ r m. s pmo.j w.•» s� .e�,� n.�e. Y n.,.. �...•.y.:yv..r• m deo tl #a .wa R/rp:: wez si aw.T fn., See
pay4naYla w.4�4 arm. 9Gee. .ara M1 Inert M nee eb �vrged K was e�7 +'+/ hm f+e wwdd r+lru Grll`n rtraao ih'a>p'.IY/seanrn DvWt�r Gr Nacfglfr•Rr +m'd eeMoe MBA r.B CdrM1-•w .71�]ra4 yru 9rw•rMr P'n'b�rgr7
eruwro,trn
efFs4 w41ll fr•aa rc.r _ _ _ _ _ _ __ 1
Site Development Plan
8) Projected Residents: See Items 9 &10
9&10)
Proposed Dwelling Units J Site Data
RM-l: (Existing Willow Glen Development)
Proaosed %Squired
District Area: 177,631.63 sf
Existing Units 32 d/u
Lot Area Per dlu 5,551 sf 5,000 sf
Open Space per dlu 4,006 sf 4,000 sf
RM-2: (New Development & Abandoned ROW)
District Area:
Proposed Units
Lot Area Per d/u
Open Space per dlu
Proposed -Required
577,516.37 sf
44 dlu
13,125 sf 10.000 sf
10,833 sf 7.000 sf
PD: (Numbers Include a potential bonus of 4 units)
_
Proposed Base
Proaosed i Bonus
District Area:
755,148 sf
755,148 sf
Proposed Emits
72 d l u
76 d I u
Lot Area Per dlu
10,488sf
9,936 sf
Open Space per dlu
8,401 sf
7,959 sf
F.A.R.
29.3 7%
29.98%
DAAR Engineering, Inc.
E ngr*era - planners - Surveyors - ArOKeM
Offrx of Land Omkvmerd SMkMS
5
,.ram
} z
I
" f- \�r; � •� � '�' F ��` - Rom` � �•
,s
r
}
y
r�
•
d
f•
o/
j------------ n/ t? _ _f 1 ���� r r
+�----
1 0,;/
----------------------
�� •G�Jff///ff �ffEi,if�. f
I
7.. ���rrf�r/✓f�"�f .� fff/ '
�—•------------------
AVENUE l
I
I
— I �
1 f'\ '?'I r'fLL ATM PLAN
WTrEj! PYPerq
11 Au PLµTw_ mE 6 To EE Vl.1AE0 vpr i 5.P ,) HAPC10.1?:O omP m-eK -,-mrw 9E ns Ye FT LAWN FAFs SP-m
OVFEOOE OF P: W.r r_ M-1
71 Ft IS T:E RESP� LC}' Ow LA+aFJPE *STALLER W —%W .ACE w-ROUND 4) "ms LOCAYE"y
E1' OC,-PPS ICITIM PROR -0 PFSTALLA O k
71 PLAN7YLOuAumV 5 AR_ PAWiWe] FOR LIL'QSCAPE Cv OP% COWENEUM OAAT LVO$tA E
COKM-��S.Y1LyERFTALL OLA%MR lS•l--VW�AlN
a S11PPL+ AFC MMLi Fpp1` R TAS:EIS RJLFOICA .+0.1^J. FOR TREE£ 54wJa5 F'� EyEApF'ExI.L
Sy SLPPL+'Amf&5TALLCSMOMIE PRO !457W L$ LW40RS FEwl-2ER F.R{xJ{y PEFENWALS
I I Sna M. - E U_, Laura W D, P..- F. W Wp 1
b Z*KL 1. Lt. ' E..Pv,,. Rra S�'A, A YNEW.a-" w. Foc+1 .4FM'a
h lie sr.td ThFI d P°.i•.•d 4v rrt«i. ird. uaepr.rYA, i P•��•"• r'u�e I�cor WF w.• Y
N Trr•. _a. .raa cuaa aF.•Pr.s �+� ae a....+.c .a+1d rc ,Wr�rn++1 ••aa� •..c .... vrY. r r+. Pr^+� � c.
auFvl6My.W�W'�I ee•,Irndnn rbFry/nac[vWFc.r<+9..•iu�F,OS'.S.P�•'_'_-
Si G•d•q ab1W•d+q .IgaW srmwwdT>. r.. ra 4,e.ae w uwb.pAm wd a—w.a.. vA+
AFv�+ Wwa uY.._W1..sWdkw....ds.d,eel...d.,rd4..raW.r..dlw-"-v
el Tw.nru mrlu. L-A c. •e.r14 m.rl - _.V"M �pF17.I ter Wy.. v I r.yl IW V /1V�..1 .n�.. a�*h a.a >a M.••�Wr1
8r+r+d W.F,14N vrf s1v1 ne aa. a� ref ,raeanr IrPe ...dPs aN vM. r ..rn W.� ,r.n 4w aR • wb er arw to pn.*
•..d. Fx -W-9 •••. xlw ....f 1.P4 •o.r 'n• w .ulWe..w 4a -]AH HLa.rry lydry
1 rti.. err 4N= y seo rc.eadl In.1 P..rpre a nfc� o, �,rrr..K*d WNrF 4v,._I .1v2 p. uYa.*,p.b vA' xr espM
a.l a[.n4755?WsT+'acn 1FYCn mAMAi .npb•l.eppFdwea., r[PNMFuM 4..a
PLANT MATMAL IPHOIYLE
94ADET
]A PIS
GwF wF..*ttP1 5.,C*0
stwN....."km
2.a V r
iE
F1/
1 Tam
pegv R Arum c-w
Awq owl m. - MY.
P r1 -,mY
SQ
FYI Fmn
5 TYL
5 TLG
7� COtir. Grw.rpw
Aw". G1.4p1
Geaw. W�
71S-eat
I•_ T �
iE
iQ
FYIF-
•uF FeF�
] TYA
ORNARI ALL
13 TYa
��. nr�-wI1P•rnY
TREES
.--. R _Oa
A.Fa+M e.>;e 4MIP. := 5' cY
A,se.h Ls.ner sw..ele..•. r41.a!
3! fit FFm,
iQ F.IFyrn Wm-sx►.
se TPA
IF4—�w
AmuC rtrW,
%-PqY
at
F..vv H ,st•.
EYEACASIN MKS
ESOR
Pm r..ra Ar }A+1n
L-N K. SFtic,
me
ur...T^ L Qa'+'.`FF4 LVP
5 EPNA
Paa 3.a
A.. = M
5-r
ie
uA. t ea.Pr--ed saki.
4 EMB
14 EOM
A.W, V.
Th,,. 2.
A. Pm
DP* C� A m
I-5
I'd
i!
ae
1A.Ys 4lM.e.d sum
•IQrF U.%m
WILWW GLER
ll* a - UWT APAR f 111: MT 9 DILOPIS
�q!w'�nw Mwa�1'
IC•-FIWC-FY+ 3W tif0. .[swFML.]+��
:anpL'aQ 5s... a s:pNrp k
x» t� •.� >i,.r
w..r. n un•
Mr. PfW
LSE PrC�ec7 r 090795
iwv+
SM LANDSCAPE PLAN
LLO
� iJL'N Gf�F'.�IGE �fW�`�C.AF'� F'L •�:J
11 ALL Pl►Y'I.f eEa3 Tp e=_ \111LCPE 01.R.M SIY40_EO.pfOWOW eAiM 1ME$ PLAHTrC OEM MEET LArih AREA SPADE
Cul Sam or PLAI,TFC llm
A ma: TW FjSpCM*C P1' Cr -AMSCA.PE 16 %LLEN TO LPLye LhCFAGRD^ V D;/'&Jleg LOCAMO
a• DGaE,.S CtJK PROR TO 06TALLAT41%
y PLANI L4-OJMCrMS AM PRM'K*!:)FOR LAf� CONMACT-PS a"*, NCIE Olt+ U.Id�$uPE
-•,@yT CTt1 RSrpii VEPfv ALL *LA 4-P•ES SPa7A% Ok RAN
4 SLPPLT A.0 e•SiAu FER-LLSA T}SL.ETS AGAILOW XSDS FOR TREES $'OI "D F1EACJ NS
A SLppLx AAp#S-,Aa OeNOCOTE PRp •a"f_ tZ WOQFM FEN%7FR ARMM PEREMiLB
•] S.w L -t, Lbw Ljw Le. W P— TCftm fa M=7Ad -mr
sacs.. rase µ. +=c.r.e.Pr RR.r v S..c w� b. sTrw >,ua..f : v rao.ee n.r..•.:
it 'Ir s.e"..x.a f n R.CR tr G..PU nl,e feed ps.mlM ax1 L1....•<'. a...• •ri•A-.P. Laml mHt "
.� 'tw ..u. .Ir•coaflap�oba..eaPe.s a�e� r...n.Prrq aTe ms�f.v+I+�w`•�.«n ... ,..den r.n. v.. a.b . ses
a. c-.., a ; rtru r�s� cP.c+ncar, a�wr a<•• .c:arfrs. rr er wv�r�••a nuw .u.cNcsv
it C—y6000 e.r: m.ew7 m. i*-1. to-.0eand ft a *d .ra, e.a hr nw,r
svca,e..uu•..c K� a,r r�r+� .ran .b ww<.e.raLe s :nr.a P.+rar.M ^ .ow.r. am...v.q
el Z.. teed —t— na, v..o++lw .raa a.y W-1 Wr a tt Z w xr<..o s.tr'++.
SsILe.PQ t..d d'f ...n .nr e<e..r arr r-.,osW—v „M..ee.., rd e.4 t..rtT Vnn wn..e „. -10-1.; :o P..P•: L
Twn �7a•Mf PL•.. an. a �..w..a.. L•r lo•..+Y.'..w: ar yrwl c�•ro ••�
1-16, .,. —i —& Mw I* A*W ht* m
Ka r . -ye d SS Or.. p.• .rn YiC1 ...K..Y-W W l'Kp,..d
DECK "TREE STAW* DETAIL OECD-"TRff ANTMG IETA!
oewe rv.••.
POTTED SHRUB a1.ANTMDETAL
TYPIC/J.- ..1N1f- FOLINPA.TJGf - PLANT)W+
EIERGREEH SHRUB FLQfW DETAIL
PWq NAV=X 9011IM if -TVPW" FOLMATION -WW a MST - WS
Q JECOP
I%W CCCdwwam kQ.
1']a+ ran
5d
I ae NA." a.Rae L Lawns S-.W
•.y.
C—g .I.a.ry, Crony awW
,L' f.
Cul a fafa.c.d SqP.
�'
Tp u, . nep ,a.e•.r•r
T.a.Pn Y.w•
1T-:a• d
ae
a wft. d Sup.
=Ile
Aryq...Na.Ma.}.. MA.
el..• C-**P +y
:-Y
POT
P.. sm" N,,.F\ a Q.ae ri.ay.
0
to
a
SD•
SSF
Sv"
D<.w.+u..aa
S $ w . T Pww
vb— R, . xp.tfcP.'
.
D.,aa e.rl. lArurf•.ue
F..lY LP<1+
!wap� C4.CF/lW.^
w w
I r-1a'
:14
P6T
PDT
ea
P—Spw Fa A D..L AOW
SP.n Fb L D." ftm
P.w SP.n na L D..d 1%00
PEaQashLS
mda
1'6
...was.
N.ad W ft A
a s'
POT W Sp-,"
PLANT NATOM eCTELIXf • NET. OARLGEL
0110*11111WAL.
TPA P�,., -M a:h.
saa m
a-fD/p
se F.l F.P. WA"t—
ri
JEW
-emsWWOW
J1rar's
e9 md—Le...W5b—
e
Isms
LLL
.pr w.!
9r k oRc.n. n
S
ROT R,.F a =I a A FLa,n. L O..! TYa rS
a
SD•
ow ftk—
2r3r '
POT R.. S '+FL.. & D-W VV j
„ �,a .y..sor+0
DAM flno .#a.oa
. S
POT � SpFx4
WtLLO" GLEN
NEW L - UNIT AFAMENT BUILDNIG
ryypLF+'
x•.,wc.rw� wLmAC TAF.f:aeuL�.c
R.aA
T�
LSE O"M
:PF '� •kb
Pq'm
SETS L4MOSCAPE PLAN
Operational Considerations.
11) Infrastructure, Preliminary Engineering indicates the proposed plan fits
capacity of existing and proposed sanitary and water
systems.
12) Traffic Generation: Road design accommodates the development as proposed,
but further improves emergency service via the loop the
road, and improves access from Racine Avenue.
13) Potential Nuisances: USE.: Several steps are taken to minimize the impact to
the surrounding neighborhood by keeping the proposed
development directly adjacent to the existing multi -family
structures, The remainder of the site is used to provide
substantial green space preservation as a buffer to the
single family homes.
DAAR Engineering, Inc,
Ea4meers - Olannerb - surveyors - A rcNem
Building Mass: The proposed structures are intended to
enhance the overall Willow Glen Development and be
compatible with surrounding neighborhoods. To
accomplish this, steps were taken to utilize 4-unit
structures, which are more costly versus the more cost
efficient standard 8-unit design that produces large scale
buildings. See Appendix for5ite plan evolution.
Vehicle Lights: Through our neighborhood meetings we
learned that headlight glare can sometimes be an issue to
the neighbors to the east. To address this, the
development plan orientates the new structures so that
traffic and garage access is kept internal to the site. This
also improves appearance of the development from the
subdivision to the East.
Property Values: Thee is often concern that multifamily
(MF) development will lower property values of nearby
single-family (SE) development. While steps have been
taken to insure a quality product is constructed and a
green buffer in excess of 400 feet is being provided, this
concern still might be a consideration.
4ffm of Land E3$y anent SmKes
9
Providing a permanent open space buffer in excesses of
400 feet in width eliminates the public R.O.W. from being
improved to a public road in the eastern subdivision.
Added to this discussion are the many studies that show
multi -family housing has no significant impact on the
factors that drive property values. The major lessons from
the research.
• MF- housing that is well designed and attractive
does not adversely affect property values.
• There is no discernible difference in price
appreciation of SF -homes located near MF-
buildings and that of those not located near MF-
housing.
MI`- housing is a catalyst to improving economic
vitality for a community by becoming more
appealing to businesses, which, in turn helps
increase property values.
Storm water Runoff: Downstream flooding problems exist
and understandably there is concern that this development
would add to the problem. While all downstream flooding
can not be solved on this site, the storm water
management will substantially reduce the amount of
uncontrolled run-off via the installation of a large storm
water management pond. The result will reduce the
impact to the downstream flooding.
DAAR Engineering, Inc. Me of Land Dem0pmenTSernoes
Ergineers - Manners - Surveyors - Arcnk)cZ 10
I
1
J
l
�
1
J
f C.T.H, -Y-
1
..
1 RACINE AVENUE
1
-- -
-
--
-
-- --
------------- ---- ---
-
co lb,
L�,R1
I-------------------------:
r
r—cik,w
Y
1
is Own
�•'R"� ft
1-0
RACINE AVENUE f
Et.ry{p
_
----
_ - - --"-
i
� r
1 r
1 r
1 �
1 �
I C.T-H- "Y"
RACINE AVENUE
r---------------
--------- --�
f,--------------------------------
weES[GO V vi
VOTERWAN AND TIE EY�'M-
LATERALS TO NIEW ww
r
c f•�+n
N
`
l
... r
C
,
-------------------
-M
�
� a. -Is
\W
wax
T""�
Lyy
rww.
*ter....
1 C.T.H. "Y. f---------------
-------------
h,.
RACINE AVENUE
f
,.
1
Ei•'�u
1
cs'rl-6ra
�'
--
CowNECf To EXMT
VATERWiNN
DROP a VATEaww
T.W
r14ftsr
aw
ro
zp
,ren iac,
i N
W E
S
pgoo STCgv
Ewa
ruaa
0111181 HIM
wmcae+.'T.TE n-n s
r..�„ Mn,rtra evert rm
.m,
EM F
n-nu
I
I
1
1
I
I
I
I
I
1
I
1
I
Building Design:
14) Materials Stored on Site: None.
1 5) Building Materials: Masonry: Dimensional Brick (min. 50%)
Siding: Cement Board
Windows: Vinyl Clad
`rim: Composite
Roofing: Architectural Shingles
Patios: Concrete
1 6) Future Expansion: No expansion of dwelling units will be permitted per the
zoning ordinance and via developer's agreement.
QAAR Engineering, Inc. Office of Land DmOpment Services
Engineers - Planners - Surveyors - Atchnet s 13
NOTE: Proposed floor plans are the same for each building; however the roof element is
treated slightly different between type 'A' and type W. The locations of each type are
noted on this diagram.
DAAR Engineering, InC.
Engineers - Planne-s - &rueyors - Arch*CLS
Olhce Of Laro Devehpment 5ermm
is
13
upveeuar
IssaN, , 10. 0g
4i 1-1 4
ik A
Lom
Lc%nmr
GAPiQ
ra
h
Leos tAl-
} � 1
6 -V 2 COUNP FLOOR PLAN;L"
WXLOWrAEM
NEW 4 - UKI APARTMENT SiALDIRO
Elio
3C)
51VE eLFWAION - TWE A
3
iAC-K ft-e VAION - ryn A
rLIF
11 m 0 11
'01
Tl
FLUOR PLAN
ELEVATIONS
G
t G�?D�►U17 I�LDDp �'LfW
2 (1-P Nth F:pop c':.AN
1
-
I
4
¢�
3
51M ELF-VAION - TYPE D
¢y
p .s6n•_.zs�
�S ar�sZ ar��w
d YC':PC �a.K •P
F} :Tt FCe'ti*C
WILLOW GLIM
PIEW ✓I - UKIT APARTMENT BUILDING
r LI,
�snr1r�vr�Jw m�xvrn .mac
L"Crah Sr LEN—vi Ya
m � rem • •n saw-
Iwa---
3 DAGK F-LE:VA'10N - T4'E-� r3
LSE P.pjxl t p90258
Iaa orr ►fr
.. ...--- ......--- --- .... _ FL OOR PLAN
ELEVATIONS �j
5 I7LI V!~ 5i ErLe VATIDN !1 .!
t: f
Other Pertinent Information:
17) A 10% Bonus Request: In accordance with the ordinance an increase of one
building, or four units, can be permitted upon
recommendation of the Plan Commission. To earn this
bonus the owner must include elements that are good for
the community and that serve to improve the overall
project,
QAAR Engineering, Inc.
Er+gineers - planners - Surveyors - Archit"
in order to earn the bonus of one 4-family building the
developer is proposing the following factors.,
1) The Developer will improve the
appearance of existing multifamily with
new siding roof gables, entry features
and windows.
2) The Developer will solve a 20 year old
flooding problem with the Church
Parsonage due south of the development.
3) The Developer will construct new
garages for the existing apartments to
improve the existing development.
4) The Developer will abandon the use of
the eastern most R,O_W.
5) The project utilizes a more costly 4 unit
structure versus the more economical
standard 8-unit structure which will
increase compatibility with the
surrounding neighborhood.
6) The project permanently preserves Open
Space.
P) The development adds significant
landscape improvements to provide
additional screening to the east and
street appearance from Racine Avenue.
8) The Developer will convert the existing
apartments from private well to
municipal water supply.
9) The bonus units will not exceed any of
the lot coverage or usage requirements
of the underlying zoning and does not
change the development design_
Office of Land Deveropmem Services
17
See next page for material notes.
7 �MVCA WILLOW GLEN AVAP'rAAE;NT VUL VING
TRAN
M
► ON
ek5l-'CA W LCaW 6"N APA42Tf1 FM'r' D,1J1Lt?1NG
p V01-H P1?O1'0cZG E�.aVAI ION O-ANCZ5
DAAR Engineering, Inc,
Engineers - Planners - Surveyors - Architects
Qtke of Land Development Services
18
Ste• -iJ
r --"Ar,
F )oI ,r' CA WIL! OW GLEN APAPTME NT rUll_ VINCA
>�see;oaroe�xrara
wsrrt nur -+c c- ror -c
:.Tf7�N• • �l�A :!•fib
LS'IS••-.. FCts il�PctiG
y {�] Kri'1�L 7r'R rC 1.r3
^PVC wQnti PaTJ�wrti �iN+"�
Q �p NC!/C r�wr�e
�ln ylfE PG �%
�'. W�1r+liC lTP
YA:P�A4:N[ n4IrF_
O'F� R?f.TRrwY •J�.�
c x re+rr
7 Ex15T'CA M� -OW ca-E-N AF /fTMV NT gull ELLI wr
o r
I 1 CAR GARAGE ; GEA:.,AAAGE 1 CAR GARAGE 1 CAA GVIAC Q yz: .►
p aaof.•.��
Q ac f� N.•a
!
!
G'
=-LL
4 11hiT `ri1'1
7 GAlWA*— ANP COMNs1..`,Oti •: r f !-
5 TWI"..AL 51M ELE�V — GPP_AZC65 8 GAtZkZ ANP C0MML1NA- 5PACE. — M-5TLE—EVAflON
EXISTI110 FALLOW GLEN
NEVI GARAGE V14
fFS 6
FACADEIMPROVEMENTS
FLOOR PLAN
ELEVATIONS ��]j