Loading...
COMMITTEE OF THE WHOLE Packet 12-14-2021CITY OF MUSKEGO COMMITTEE OF THE WHOLE AGENDA 12/14/2021 5:30 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF AGENDA APPROVAL OF MINUTES November 23, 2021 COWM2021.11.23.pdf NEW BUSINESS Water Utility Discussion • Policy No. 1: Private Water Trust Connection Policy • Policy No. 2: Service Connection Policy • Policy No. 3: Water Main Relay Assessment Policy Water Study Council Agenda_20211214.doc PRIVATE WATER TRUST CONNECTION POLICY_DRAFT_20211026.docx SERVICE CONNECTION POLICY_DRAFT_20211122.docx WATER MAIN RELAY ASSESSMENT POLICY DRAFT 20211026.docx Discuss ARPA Funds COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT The Committee of the Whole may possibly reconvene immediately following the Common Council meeting of the same date to continue work on agenda items. NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE -STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE -STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT MUSKEGO CITY HALL, (262) 679-4100. CITY OF MUSKEGO COMMITTEE OF THE WHOLE MINUTES November 23, 2021 5:30 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER Mayor Petfalski called the meeting to order at 5:35 p.m. ROLL CALL UNAPPROVED /A I w Cry of a SKEG J Present: Alderpersons Wolfe, Terrence, Kapusta, Engelhardt, Kubacki, and Madden. Also present: Public Works and Development Director Kroeger and Administrative Assistant Crisp. Absent: Alderperson Hammel. STATEMENT OF PUBLIC NOTICE Ms. Crisp stated that the meeting was noticed in accordance with the open meeting law. APPROVAL OF AGENDA Moved by Alderperson Kubacki; seconded by Alderperson Madden to Approve. Motion Passed Unanimously. APPROVAL OF MINUTES October 12, 2021 Moved by Alderperson Engelhardt; seconded by Alderperson Madden to Approve. Motion Passed Unanimously. NEW BUSINESS Discussion Regarding Former Police Department Building Mayor Petfalski stated that the building and what should be done with it has been discussed often. He has been approached by the Lion's Club and the Muskego Women's Club and questioned on it weekly / bi-monthly concerning our plans for the building. Mr. Kroeger and his department have had discussions internally. There have been many options as to what could be done with it. Mr. Kroeger stated that he walked through with a representative of Absolute Construction for some suggestions and was given some rough cost estimates. The building has good bones, but needs a lot of work. The longer it sits, the more problems needing to be repaired. He passed out a handout with Recreational needs. He mentioned he is also looking at different funding available. Mayor Petfalski stated that he is looking for feedback from the Council on how to go forward. As there is enough community interest in this, he would like to put together an Ad Hoc Citizen's Committee to look at what could be done there and research different funding sources. He would like to see an Alderperson or two to sit on the Committee and report back in about six months to Council with a wish list, some numbers, and funding sources including fund raising. K Committee of the Whole Minutes November 23, 2021 P. 2 The Council Members all liked the idea of putting together an Ad Hoc Citizen's Committee with two Alderpersons on it. COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW None ADJOURNMENT Moved by Alderperson Wolfe; seconded by Alderperson Madden to Adjourn at 5:55 pm. Motion Passed Unanimously. Minutes taken and transcribed by Christine Crisp. 3 C4 o'f ENGINEERING DIVISION W182 S8200 Racine Avenue SKEGO Muskego, Wisconsin 53150-0749 (262) 679-4145 FAX (262) 679-5614 City Council Meeting Agenda- 12/14/2021 A. Policy No. 1: Private Water Trust Connection Policy B. Policy No.2: Service Connection Policy C. Policy No.3: Water Main Relay Assessment Policy D. Schedule: 1. COW Meeting: Tuesday, December 14, 2021 2. Common Council Comments Due: Tuesday, March 1, 2022 3. Common Council Vote: May 2022 Page 1 of 1 4 PRIVATE WATER TRUST CONNECTION POLICY MUSKEGO WATER UTILTY (December 14, 2021) I. GENERAL The purpose of this policy is to create a standard method for the Muskego Water Utility to calculate the water trust system connection charge. The water trust system connection charge to the Utility will vary based on the condition of the water trust system and the cost associated with the water main necessary to connect to the public water system. The water trust may VOLUNTARILY request and apply for connection to the Utility, and voluntarily complete a system inspection and valuation of the water trust system. The City is NOT requiring the private trust to connect to City water. II. PROCEDURES The Utility will provide the required system inspection and valuation forms upon request of the water trust. The system inspection and valuation details the condition of the water trust system and translates that condition into a valuation. This valuation is based on a range of depreciation rates established by the Public Service Commission that vary depending on age and condition. The Utility is to complete the system inspection and valuation to determine the depreciation grade based on condition. The water trust or certified operator is to transmit any existing plans and respective water trust by- laws. The Utility will perform the evaluation of existing water system. Any evaluations that the Utility cannot perform will be coordinated with outside consultants, by the Utility. All costs related to this evaluation will be the responsibility of the private trust. The final step in the system inspection and valuation calculation is the proposed connection charge for the water trust based on the depreciation grade and age. The main financial factors include the connecting to main cost, standard connection costs, upgrade costs based on repair or depreciation and the current standard revenue credit. The Utility can be available to provide assistance in calculating the potential connection charge. Based on the findings, the water trust may request that the Utility accept the system as -is and pay compensation to fund any repair work that is required. Upon receipt of the results of the system inspection and valuation, the Utility will conduct a review and respond with a proposal for connection. The water trust and Utility will meet to discuss the terms of connection and develop a plan for moving forward. III. FINAL ACCEPTANCE OF A WATER SERVICES AGREEMENT A Water Services Agreement will be the final product of the above detailed procedure and negotiations between the water trust and utility. The Water Services Agreement will define the terms and conditions of connection including the financial obligation of the Water Trust and identify required repairs or upgrades. New water meters will be required and the cost for the meter and the installation will be part of the service connection fee. All costs associated with internal plumbing is the responsibility of the resident. If full water main replacements are required within 5 years of the agreement, the cost will be assessed to the residents. The final acceptance of the Water Services Agreement is based on approval from the Muskego Public Works & Safety Committee and Common Council. SERVICE CONNECTION POLICY I. II. MUSKEGO WATER UTILTY (December 14, 2021) GENERAL The purpose of this policy is to create a standard method for the Muskego Water Utility to determine if or when residents shall be required to connect to City water when City water is available. The resident will be responsible for all costs associated with the private lateral installation from the right-of-way to the private residence and for the connection fee. Options A. Scenario: Water Main Extension 1. Existing policy: Connection required once private well fails with no option to drill new well. 2. Connection required 10/15/20 years from City water availability or at the point of sale of home. 3. Connection required within a specified number of days from written City notice (no less than 90 days). B. Scenario: Existing Water Main is Available, but Resident is Currently Not Connected 1. Existing policy: Connection required once private well fails with no option to drill new well. 2. Connection required 10/15/20 years from City water availability or at the point of sale of home. 3. No requirement for direct connection. 6 WATER MAIN RELAY ASSESSMENT POLICY MUSKEGO WATER UTILTY (December 14, 2021) I. GENERAL The purpose of this policy is to create a standard method for the Muskego Water Utility to determine if or how residents shall be assessed for water main relay. All residents in this situation are current water utility customers who are connected to City water and are contributing to the water utility. II. OPTIONS 1. Follow or modify current water main assessment policy. Resident responsible for all costs. 2. Assess residents with a capped cost and Utility covers remaining cost. 3. Do not assess residents. Utility to cover all costs. 7