Loading...
PRB110965minutesPARK AND RECREATION BOARD MINUTES of meeting held November 9, 1965. Meeting called to order, at 7:45 PM by Chairman Dahlen, members in attendance were Dr. Riess, Mr. DeAngelis, Mrs. Sanders; Mr. Chic and Bldg. Insp.ector'Mr. Lee. Minutes of previous meeting were approved. Board was informed that the Council and Finance Committee had accepted the 1966 P6 R Budget as submitted. Mr. Dahlen informed board that Mr. Miller agreed -to Direct the Municipal Band for a fee of $15.00 per rehearsal.. Dr. Riess moved to accept Mr. Maller as band director at above stated salary, 2nd Mrs. Sanders motion carried. Next order of business was the opening of sealed bids for the improve- ments on the Jewel Crest Bldg. GENERAL CONTRACTORS - 2 bids submitted - Mr. Boehm $4290.00 and Mr. Sorenson $4495.35 - Mr. Dahlen and Mr. Lee will meet with Mr. Boehm to go over item by itme the general contracting specifications and if in their opinion he will meet the price submitted of $4290.00 the General Contractor will be awarded to Mr. Boehm. PLUMBING - 2 bids submitted Mr. Kowkal.ski and Welch's Inc. since Welch's did not submitt and itemized bid the Board will ask him to do same. Bid for this phase of the work will be awarded at our next meeting. REATI G - since an opinion was expressed by all bidders that the present system in the Jewel Crest Bldg. is not worth the cost to repair, with the help of Mr. Lee new specs will be drawn up for a completely new heating plant and bids will be let ou-t by our next meeting November 23, 1965. Mr. Chic moved that the Board allocate $25.00 for purchase of trophies for the soft ball league, 2nd Dr. Riess motion carried. Mr. Kangas appeared before the board to discuss the Winter Recreational Program, which might possible include the following - Classes for Womem one evening a week - Volleyball games for men one evening a week - Sat- urday activities at the schools for Children. Mr. Kangas will present a complete program to the EXLlU Hoard at our next meeting including the number pf personnel needed -- salaries, etc_ The program would run approx- imately 12 weeks. On motions meeting adjourned at 10:OOPM. 40 Respectfully submitted, Wean Sanders Secretary • PARK AND RECREATION FINANCIAL REPORT NOVEMBER 1965 Summer playground Program Supplies 8 Other Expenses Maintenance of Equipment Memorial Day Parade Puddles, Brooks League(Cty 8 City) Improvements (Horn Field -- Cemetery) Total To be pair? Electriety at Horn Field •Fencing Jewel Cfest Bldg. Trophies Budgeted 14,690.00 5,233.10 986.69 24.00 251.17 1,443.56 ,983.60 9,922.12 355.14 ,'225.00 25.00 mYEN ER 10,554.80 I JFFI G1 l i 17 0T CE CX E"r or, HUSKoc- o ADvEp, %S.:F.,r, wT r, 6p, -RXDS fe' "!v.rRLL}xi: T 1, UPIB T Icl Itr 1?rd�.t�'fiLsr a3kjL�'i11-PxV.iiS'— pp]� fl t �r r /',�q A _ .4G r,T-7,- A��L''.j rl Es. 4Js 1;r,i ' ?Dii 1 u�s{J :_ :Dk�" E►i' �s ,7:'21v Cigs:.�?�x 6 VlrlcT-,, E;12r 00 A'm6'F � t?€s �L rws C:, 1965. B Ds i:fxr L a.a T T G "' £)i+ d � c S: il' i E'3 ii. �� F1'i l/ �3; :•'?w L i, C1 L ?7•'eT ' G'�' 1? rq y TO ACCEPT' THE DID HOU5-1' TO THE G,t TY, p" +:us -IN c- o ,, ::' IFXCATIONS FOR REPAIR OF JEWEL CREST BUILDING General Contractor 1. Rough horizontal rough cedar 1" thick siding on exterior of east wall. Caulking at both ends for proper sealing. 2. (a) Complete seven window units on second floor with combination storms and screens. (b) One storm and replace broken glass window in stairway. (a) Replace all broken glass and provide and install combination storms and screens for first floor. (d) Cover all windows with screen protection. 30 (a) Replace three exterior doors and provide kick panel on front door. (b) Replace all locks and provide key locks for both interior bathroom doors. 44 Front Stoop (a) provide 59 x 50 stoop with frost footings to a depth sufficient enough to prohibit movement. (b) Provide structural canopy size, sufficient enough to • cover stoop either flat or gable to carry a 50 lb. per sq. ft. dead load. 5o Rain Gutter (a) Install rain gutters anchored enough to prevent sagging. (b) Down spouts, minimum of two. (c) Screen to cover entire gutters to prevent clogging. (d) Splash block for each dorm spout. b. (a) Replace and/or repair all damaged block. (b) Tuckpoint where required, 7. (a) Finish east wall on second floor with masonite paneling over present celotex and add eelotex where needed. This paneling will extend From floor to new ceiling. (b) Base along same wall. (c) provide wall at right angles enough to cover vent., (d) Panel beams on first floor. Provide and install complete grid system ceilip(- for second floor to be extended 10 feet from floor. 9. This contractor shall be responsible for lightiz which will be recessed in grid system of the second floor ceiling. It shall consist of three rows of 4-tube fluorescent extending 24v in length abo4e ceiling and translucent panels installed in grid. Provide fixtures for stairway and hall between kitchen and furnace rooms. Also provide exit lights. 10. Install rubber treads on existing stairs,, 11. Fireproof furnace room. 12. (a) Repair concrete floor on first floor where drain has been replaced by other contractor. (b) Repair all cracks and even entire floors (c) Heraove and replace the on first floor only exoopt kitr3hcn. (d) 4" rubber base on all masonry walls on first floor. 1] 11 13. (a) Build dwarf wall to receive water closet in womenes toilet to be finished with washable material. (b) Install metal partition From north to south wall. (c) Repair south wall where needed after wash basin has been moved. 14. Kitchen cabinets (a) Hen lace missing hardware, .uold ing and drawers. 15., All colors, types and manufacturers 4o be approved by 'park and recreation Loard before installation. 16. Contractor responsi.t:le for on site inspection. 17. bies .rust t;e sealed and submitted to Mrs. Wean Sanders. Secretary. Park and Recreation floss before 12200 Noon, November 80 1965. 18. Specifications may be obtained at the City Halls W180 57732 Racine Ave. Q Muske€o, Wisconsin,, 19. Alternate Fainting List Items separately 1. Exterior block and trim - also oil tanks 2. Roi;gb cedar siding. 30 (a) First floor complete with exception closet and furnace room. This includes ceiling in kitchen and hallo (b) Second floor with exception of new ceiling and paneled walls. (a) All interior windows and doors s pL,UMB1NG - Branch 2 la Remove broken :floor drains and. replace with single drain at lowest point in floor. Other contractor will replace concrete and level floor. 2. Pump (a) ''rovide submersible puarp and, all accessories required. (b) Remove existing pump, (a) Repair or replace water lines where needed. (d) Provide outside hydrant and water bubbler on south side of building. (e) Replace all broken or missing fixtures and. place all other fixtures in workable condition. (f) Turn water closet in women2a toilet to Face south. (g) Move wash basin west on south wall as far as possible and not interfer with door. 3- Check septic system. 4. All colors, types and manufacturers to be approved by Park & Recreation Board before installation. i 5o Contractors responsible! -for on site inspection. u a MI TING o Branch 3 la Clean furnace and put in safe and operational. condition. 2. Install metal access panel in opening provided on south wall of furnace room. 3. To be checked, cleaned, replaced or repaired, (a) Dampers (b) Dues (a) Cold air returns (d) Combustible air (e) Registers (f ) Thermostat 4- Provide filters for furnace and oil tank. 5. Gil tank to be cleaned and checked for leakspalso put on suitable foundation. 6. All colors, types, and manufacturers to be approved by Park and Recreation Board before installation. 7• Contractors responsible for on site inspection,, Contractor General Plumbing Heating