STATUS OF PROJECTS
Discussion update. No formal action may be taken on the following:
Great Water Alliance
Hillendale Reconstruction
Police Chief Updates
UNFINISHED BUSINESS
Discussion update and possible action may be taken on any or all of the following:
Request for No Parking Signs - Lochrest Blvd
Request for No Parking Signs - Oak Grove Drive
Memo 3-16-21 - Oak Grove Drive No Parking Signs.pdf
Aerial of Oak Grove Drive.pdf
NEW BUSINESS
Discussion update and possible action may be taken on any or all of the following:
Request for No Parking Signs - Parkland Avenue (North of Janesville - Briargate Lane)
Memo to Public Works - 5-18-21 - Parkland Drive Drive No Parking Signs.pdf
No Parking On Parkland Drive Aerial.pdf
Madyson Court Land Development - Public Improvements Approval
Memo to Public Works- 5-18-21 Madyson Court Land Development - Public
Improvements Approval.pdf
MADYSON FULL PLAN SET 04-02-2021 small.pdf
NEW BUSINESS PLACED ON FILE
(The following items have been placed on file for staff review. Upon completion of review, staff will
submit a supplement detailing options and possible course action to committee members.)
COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW
1
ADJOURNMENT
NOTICE
IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE
MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN
BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY
REFERRED TO ABOVE IN THIS NOTICE.
ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS
THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, CONTACT
MUSKEGO CITY HALL, (262) 679-4100.
2
CITY OF MUSKEGO
Staff Report to Public Works and Safety Committee
To: Public Works and Safety Committee
From: Scott Kroeger, PE, PLS, Public Works and Development Director
Subject: Request for No Parking Signs along Oak Grove Drive
Date: March 16, 2021
A request has been made to the Public Works and Safety Committee to install No Parking
Signs along Oak Grove Drive. The parking restrictions would be on one side of the road
only. Currently, the only parking restrictions on Oak Grove Drive are along the east side
of the road that is adjacent to Lions Park. This area is where there is two-lane traffic along
Oak Grove Drive.
I have attached a map for your review.
Please remember, once “No Parking” signs go up they affect all the residents on that road.
Holidays, graduations, retirements, and similar parties/events could be affected by these
signs.
Recommendation for Action by the Committee:
The Committee should listen to all the discussion and make a recommendation.
Again “No Parking” signs go up they affect all people on that road. Holidays,
graduations, retirements, and similar parties/events could be affected by these signs.
It is important to make sure all residents along Oak Grove Drive are aware of these
potential parking restrictions.
A defined “No Parking” limit needs to be determined.
3
4
CITY OF MUSKEGO
Staff Report to Public Works and Safety Committee
To: Public Work and Safety Committee
From: Scott Kroeger, PE, PLS, Public Works and Development Director
Subject: Request for no parking signs along Parkland Drive
Date: May 18, 2021
A request has been made to the Public Work and Safety Committee to install no parking
signs along one side of Parkland Drive. The parking restrictions would be on one side of
the road only. Currently, there is no parking restrictions on Parkland Drive. The request
was for Parkland Drive north of Janesville Road.
I have attached a map for your review. I put some notes on the plan as well.
Please remember, once “No Parking” signs go up they affect all the residents on that road.
Holidays, graduations, retirements, and similar parties/events could be affected by these
signs.
Recommendation for Action by the Committee:
• The Committee should listen to all the discussion and make a recommendation.
• Again “No Parking” signs go up they affect all people on that road. Holidays,
graduations, retirements, and similar parties/events could be affected by these signs.
• It is important to make sure all residents along Parkland Drive are aware of these
potential parking restrictions.
• A defined “No Parking” limit needs to be determined. Also “No Parking” signs
should only be on one side of the street.
5
6
CITY OF MUSKEGO
Staff Report to Public Works and Safety Committee
To: Public Work and Safety Committee
From: Scott Kroeger, PE, PLS, Public Works and Development Director
Subject: Madyson Court Land Development – Public Improvements Approval
Date: May 18, 2021
The City of Muskego has reviewed the Madyson Court Land Development plan set located
on Parker Road. The development is located about 0.7 miles west of Racine Avenue located
on the south side of Parker Road. Currently, there is an existing private single lane gravel
road to serve the existing home owners. The most recent plan set has been attached. The
development will convert the existing private gravel lane road to a public road with ditches.
The development will also include storm water management per MMSD Chapter 13
regulations. All public infrastructure will be dedicated to the City of Muskego upon
completion and acceptance of the project. The City of Muskego has reviewed the plans and
given approval for all public infrastructure plans to move forward contingent upon all City
of Muskego staff comments being addressed.
Recommendation for Action by the Committee:
Approve all public infrastructure for the Madyson Court Land Development contingent
upon all City of Muskego staff comments being addressed.
7
COVER SHEET
Ellena Engineering Consultants, LLC ▪ 700 Pilgrim Parkway - Suite 100 ▪ Elm Grove, WI 53122
Phone: 262-719-6183 ▪ Fax: 866-457-2584 ▪ Email: mellena@eeceng.com
B) NE 1/4 CORNER
OF THE SE 1/4 OF
SEC 30-5-20
CONC. MON.
W/BRASS CAP
N 320,596.73
E 2,490,839,31
EL = 814.35
A) CENTER OF SECTION
SEC 30-5-20
CONC. MON.
W/BRASS CAP
N 320,505.19
E 2,488,162.86
EL = 857.87
GENERAL NOTES:
BENCH MARKS:
8
CONC. MON. WITH BOF SECTION 30-5-20OF THE SOUTHEASTTHE NORTHEAST CO
E : 2,490,839.31N : 320,596.73CONC. MON. WITH BOF SECTION 30-5-20OF THE SOUTHEASTTHE NORTHEAST CO
S88°02'28"W 360.00'
E : 2,490,839.31N : 320,596.73
C1 C2
30
7
.
0
0
'
S0
2
°
0
6
'
4
8
"
E
Gr
a
v
e
l
Dr
i
v
e
w
a
y
Gr
a
v
e
l
Ro
a
d
w
a
y
edge of pavement
Y
G
8
2
4
.
7
0
YG 822.50
YG
8
2
5
.
5
EX
P
8
1
7
.
5
F8
1
6
.
6
2
E
X
P
8
1
6
.
7
0
EXP 814.50
G
F
8
2
0
.
7
0
THE BOUNDARY & TOPOGRAPHIC SURVEY WAS PROVIDED BY
SURVEYING ASSOCIATES. UNDERGROUND UTILITY INFORMATION AS
SHOWN HEREON IS BASED, IN PART, UPON INFORMATION FURNISHED
BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS
INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED NOR CERTIFIED TO.
EL
L
E
N
A
E
N
G
I
N
E
E
R
I
N
G
C
O
N
S
U
L
T
A
N
T
S
,
L
L
C
SHEET NUMBER
MINIMUM BASEMENT ELEVATION NOTE:
ADDITIONAL TEST PITS ARE REQUIRED AT TIME
OF BUILDING EXCAVATION TO ACCURATELY DETERMINE
SEASONAL HIGH GROUNDWATER AND SET THE MINIMUM
BASEMENT ELEVATION BY BUILDING INSPECTOR.
3) Erosion control plan shall be kept on site at
all times during construction
FUTURE DRAINAGE EASEMENT AND POSSIBLE
CULVERT BY OTHERS. FINAL DRAINAGE EASEMENT
AND/OR CULVERT REQUIREMENTS WILL VARY WITH
PROPOSED FUTURE GRADING PLAN
POSSIBLE DRAIN TILE LOCATION: ANY DRAIN TILE
DAMAGED SHALL BE REPLACED IN KIND TO
MAINTAIN CONVEYANCE.
9
wire fence
wire fence
wire fence
wire fence
45
'
YG 825.90
YG 820.70
YG
8
2
4
.
1
0
YG
8
2
5
.
5
EX
P
8
1
7
.
5
GF
8
1
6
.
6
2
3
3
4
EXP 817.90
EXP 816.70
THE BOUNDARY & TOPOGRAPHIC SURVEY WAS PROVIDED BY
SURVEYING ASSOCIATES. UNDERGROUND UTILITY INFORMATION AS
SHOWN HEREON IS BASED, IN PART, UPON INFORMATION FURNISHED
BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE THIS
INFORMATION IS BELIEVED TO BE RELIABLE, ITS ACCURACY AND
COMPLETENESS CANNOT BE GUARANTEED NOR CERTIFIED TO.
EL
L
E
N
A
E
N
G
I
N
E
E
R
I
N
G
C
O
N
S
U
L
T
A
N
T
S
,
L
L
C
SHEET NUMBER
MINIMUM BASEMENT ELEVATION NOTE:
ADDITIONAL TEST PITS ARE REQUIRED AT TIME
OF BUILDING EXCAVATION TO ACCURATELY DETERMINE
SEASONAL HIGH GROUNDWATER AND SET THE MINIMUM
BASEMENT ELEVATION BY BUILDING INSPECTOR.
3) Erosion control plan shall be kept on site at
all times during construction
FUTURE DRAINAGE EASEMENT AND POSSIBLE
CULVERT BY OTHERS. FINAL DRAINAGE EASEMENT
AND/OR CULVERT REQUIREMENTS WILL VARY WITH
PROPOSED FUTURE GRADING PLAN
POSSIBLE DRAIN TILE LOCATION: ANY DRAIN TILE
DAMAGED SHALL BE REPLACED IN KIND TO
MAINTAIN CONVEYANCE.
10
CONC. MON. WITH BOF SECTION 30-5-20OF THE SOUTHEASTTHE NORTHEAST CO
CONC. MON. WITH BCONC. MON. WITH BOF SECTION 30-5-20OF SECTION 30-5-20OF THE SOUTHEASTOF THE SOUTHEASTTHE NORTHEAST COTHE NORTHEAST CO
S88°02'28"W 360.00'
90,839.3190,839.31E : 2,490,83E : 2,490,8: 320,596.73: 320,596.73320 596 73320 596 73N : 32N : 32N:3N:3
C1 C2
30
7
.
0
0
'
S0
2
°
0
6
'
4
8
"
E
S88°02'28"W 360
0
0
Gr
a
v
e
l
Dr
i
v
e
w
a
y
Gr
a
v
e
l
Ro
a
d
w
a
y
edge of pavement
Y
G
8
2
4
.
7
0
YG 822.50
YG
8
2
5
.
5
EX
P
8
1
7
.
5
d
8"WW
OOOFF TTTHETHE
90,8390,8: 32:3233
00
3
052282G
EX
P
8
1
7
.
5
G882
55
Y
G
8
rG
e of
Gr
a
v
F8
1
6
.
6
2
81
6
y
wa
y
dwdd
E
X
P
8
1
6
.
7
0
X
P
EXP 814.50XP
8
1
4
.
G
F
8
2
0
.
7
0
8
2
0
.
7
0
GGGGGrGGr
ara
vav
eveell
RRoRo
aoa
dad
wdddwddwwawwa
y
yyay
EL
L
E
N
A
E
N
GIN
E
E
R
I
N
G CO
NSUL
T
A
N
T
S,
L
L
C
SHEET NUMBER
BB00TTOO
NOTE A:
PAVING CONTRACTOR RESPONSIBLETRAC
FOR SAW CUTTING EXISTINGFOR SAW CUTTING EXISTINGFOR SAW FOR SAW
PAVEMENT AT ENTRY AND OBTAININGPAVEM
A ROAD OPENING PERMIT FROM THEOAD OPENING PERMIT FROM THEA ROAD OPENING PERMIT FROM THEA ROAD OPENING PERMIT FROM THEARA
CITY OF MUSKEGO.
3) Erosion control plan shall be kept on site at
all times during construction
NOTE:
Contractor shall implement streetC
sweeping to keep the street clear ofpep the street clear ofo keep the street clear oft clear ofo keep the street clear of
construction debris.
11
wire fence
wire fence
wire fencewire fence
wire fencewire fence
45
'
YG 825.90
YG 820.70
YG
8
2
4
.
1
0
YG
8
2
5
.
5
EX
P
8
1
7
.
5
wiwi
2082GY
ncenc
EX
P
8
1
7
.
5
G882
55
G
Y
fenfeeeeeeeeeeeeeeennnnnnnnnnnnncnncn
GF
8
1
6
.
6
2
81
6
3
3
4
EXP 817.90P 817
EXP 816.708
YG
5'
45
'
4
EL
L
E
N
A
E
N
GIN
E
E
R
I
N
G CO
NSUL
T
A
N
T
S,
L
L
C
SHEET NUMBER
3
3
4
3
3
4
3) Erosion control plan shall be kept on site at
all times during construction
12
Paving Plan & Profile
ELLENA ENGINEERING CONSULTANTS, LLC
PROPOSED ASPHALT PAVEMENT
13
EL
L
E
N
A
E
N
G
I
N
E
E
R
I
N
G
C
O
N
S
U
L
T
A
N
T
S
,
L
L
C
SHEET NUMBER
DE
T
A
I
L
P
L
A
N
D 5D3D
AA
PLAN:
SECTION A-A:
10D
END SECTION TYPICAL RIP RAP DETAIL
NOT TO SCALE (FLARED APONS REQUIRED ON ALL ENDSECTIONS)
1D
3-6" RIPRAP
(TYPCIAL)
3-6" RIPRAP
(TYPCIAL)
GEOTEXTILE FABRIC, TYPE R
(Conform to the requirements
of WisDOT Spec. 645.2.6)
NOTE: ADDITIONAL POST DEPTH OR TIE BACKS
MAY BE REQUIRED IN UNSTABLE SOILS.
* NOTE: 8'-0" POST SPACING ALLOWED IF A
WOVEN GEOTEXTILE FABRIC IS USED.
GEOTEXTILE
FABRIC ONLY
BACKFILL AND COMPACT TRENCH
WITH EXCAVATED SOIL
ATTACH THE FABRIC TO THE POSTS WITH
WIRE STAPLES OR WOODEN LATH AND NAILS
GENERAL NOTES
TRENCH SHALL BE A MINIMUM OF 4" WIDE & 6" DEEP TO BURY
AND ANCHOR THE GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT
TRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.
WOOD POSTS SHALL BE A MINIMUM OF 1 18" x 1 18" OF OAK OR HICKORY.
CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTING
LENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY USE ONE OF THE
FOLLOWING METHODS: A) TWIST METHOD -- OVERLAPTHE END POSTS AND TWIST , OR
ROTATE, AT LEAST 180 DEGREES. B) HOOK METHOD -- HOOK THE END OF EACH SILT FENCE
LENGTH.
1
2
3
SUPPORT CORD
GEOTEXTILE
FABRIC
SILT FENCE
SILT FENCE
TIEBACK BETWEEN
FENCE POST & ANCHOR
SILT FENCE TIE BACK
(WHEN ADDITIONAL SUPPORT REQUIRED)
ANCHOR STAKE MIN. 18" LONG
TRENCH DETAIL
GEOTEXTILE
FABRIC
EXCESS
FABRIC
TWIST METHOD
GEOTEXTILE
FABRIC
WOOD POST
GEOTEXTILE
FABRIC
WOOD POST
GEOTEXTILE
FABRIC
WOOD POST
GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
WOOD POST
2'-0" MIN.
WOOD POST
HOOK METHOD
THIS DRAWING BASED ON WISCONSIN
DEPARTMENT OF TRANSPORTATION
STANDARD DETAIL DRAWING 8 E 9-6.
JOINING TWO LENGTHS OF SILT FENCE 4
STONE TRACKING PAD
PER WDNR TECH STANDARD 1057
Note 1: Use hard, durable, angular No. 3" stone or recycled concrete meeting the gradation in Wisconsin Department of
Transportation (DOT) 2018 Standard Specification, Section 312, Select Crushed Material.
Note 2: Slope the stone tracking pad in a manner to direct runoff to an approved treatment practice.
Note 3: Select fabric type based on soil conditions and vehicles loading.
Note 4: Install tracking pad across full width of the access point, or restrict existing traffic to a dedicated
egress lane at least 12 feet wide across the top of the pad.
Note 5: If a 50’ pad length is not possible due to site geometry, install the maximum length practicable and
supplement with additional practices as needed.
12" THICK
12' MIN WIDTH
50' LENGTH
DISTANCE (FEET)
EL
E
V
A
T
I
O
N
(
F
E
E
T
)
10080
810
815
TYPICAL POND CROSS SECTION (PR4 & PR5)
6040200
100yr-High Water Elevation
VARIES (811.18(PR4) - 811.77(PR5)
Top of Berm
Elev=812.80
Emergency Overflow
Weir @ Elev=811.80
1.0' EMERGENCY
SPILLWAY DEPTH
TOP OFBERMEL 812.80
10' Wide
Emergency
Spillway
Top Width
EMERGENCY
OVERFLOW
EL 811.80
WE
T
L
A
N
D
S
20'-12"PVC @ S=0.5%
8"DIA ORIFICE
IE 809.60
silty clay loam
(existing soils)
12"DIA FES
IE 809.50
4 FT. DIA. RCP POND OUTLET STRUCTURE PER GREENBOOK FOR SWS IN WISCONSIN
RIM EL = 811.75 (OPEN COVER FRAME & GRATE)
(1) 8"DIA. ORIFICE - POND SIDE @ IE = 809.60
(1) 12" OUTLET PIPE @ EL= 809.60
BOTTOM OF STRUCTURE ELEVATION = 808.60
CONCRETE BASE PER MANUFACTURES REQ'TS
810
815
TYPE C - Clay Liner per
WDNR Technical
Standards (24" min.)
Permanent Pool Elevation (809.6)
Depth=5' min.
10' Wide Safety Shelf
@ 10h:1v Slope
Pond Bottom Elevation (804.60)
14