PCM19881115aCITY OF MUSKEG0
PUBLIC HEARING
MINUTES OF PUBLIC HEARING HELD ON NOVEMBER 15, 1988.
Mayor Wayne Salentine called the meeting to order at 6:50 P.M.
PRESENT: Chairman Salentine, Edward Raimann. Darl Honl, Jack m, Alderman Penovich and Director Gerald P. Lee.
ABSENT: Jerald Hulbert and Dottie Rector.
MINUTES: The Mayor noted the Public Hearing is to obtain public
reaction to the petition by William Mortimore to amend the
general floodplain district map for the property located within
the Lake Brittany Estates Subdivision adjacent to the Tess
Corners Creek in the NE 1/4 of Section 12.
Mr. Lee gave the background on the area and explained the two
different types of maps: wetland/shoreland and flood hazard
map. Mr. Jose' Aldayuz DNR telephoned today with their response
to filling this area. The members were provided with a copy of a
letter dictated over the phone to the Planning Department
secretary. Cindy DeBruine of Donahue & Associates presented
their findings concerning the HEC-2 analysis for the proposed
floodway condition. David Vanness, W125 S7676 Coventry was
water table and that the Tess Corners Creek is almost dry. Ald.
present and stated that he has not had any problem with a high
Dumke was present and asked if this area was east of the lift
station? It was stated that it is. Cindy DeBruine stated that
where the floodway is shown is going through high ground. She
the stages of the flood insurance study were in error and that
has added a cross section to show where the floodway should be.
DNR has no prohlem with the new study. It was also stated that
the DNR had no problem with the removal of the wetlands in Outlot
5. Ald. Dumke expressed his concern about the high water level
and gravel area. Mr. Lee brought up the problem with the empty
lot on the corner of Fairfield and Courtland. When the road was
Mortimore stated that he has offered dirt to fill this lot. It cut in they dammed up the water. The lot must be drained. Mr.
was the feeling of the commission that the responsibility falls
on the developer and he should work out a solution. Mr. Lee
explained that if this recommendation is made, it must go back to
work is sent to FEMA to look at the DNR review. The city must
the DNR and have the floodway map amended. Then the technical
request the review and change.
Page 2
As there were no further comments or questions, the hearing was @ declared closed at 7:20 P.M.
Respectfully submitted,
I
I Recording Secretary
cs