Loading...
PCM19880705CITY OF MUSKEG0 PLAN COMMISSION MINUTES OF PLAN COMMISSION MEETING HELD ON July 5, 1988 Mayor Wayne Salentine called the meeting to order at 7:lO P.M. PRESENT: Chairman Wayne Salentine, Edward Raimann, Jerald Hulbert, Alderman Mitchel Penovich, Darl Honl, Dottie Rector, and Zoning Officer Gerald Lee. ABSENT Jack Schmidt MINUTES Mr. Hulbert moved to approve the minutes of June 21, 1988. Alderman Penovich seconded and the motion carried. NEW BUSINESS: CERTIFIED SURVEY MAP-COATES The Recording Secretary read Resolution I1P.C. 123-88, Approval of Certified Survey Map - James Coates - Town of Waterford. Alderman Penovich moved for adoption. Mr. Honl seconded. Upon a roll call vote the motion to adopt carried unanimously. WIZA-BUILDING, SITE & OPERATION PLAN The Recording Secretary read Resolution #P.C. 124-88, Approval of Amended Building, Site & Operation Plan - Wiza Industries - S82 W18762 Gemini Drive. Mr. Hulbert moved for adoption. Mr. Raimann be to the first building and will allow for two overhead doors seconded. Zoning Officer Lee explained that this addition will compatible to the present building. Upon a roll call vote the and a service drive to be added. It will be architecturally motion to adopt carried unanimously. f1P.C. 125-88, Approval of Landscape Plan in the Lake Meadows Subdivision - Bob Reed. Mr. Raimann moved for adoption. Mrs. Rector seconded. Upon a roll call vote the motion to adopt carried unanimously. LANDSCAPE PLAN The Recording Secretary read Resolution 2ND GARAGE STRUCTURE-WOLLMAN The Recording Secretary read Resolution I1P.C. 126-88, Architectural Approval 2nd Garage Alderman Penovich seconded. Upon a roll call vote the motion to Structure - Robert K. Wollman. Mr. Honl moved for adoption. adopt carried unanimously. 2ND GARAGE STRUCTURE-HOLLMAN The Recording Secretary read Resolution I1P.C. 127-88. Architectural Approval 2nd Garage Structure - Michael Hollman.. Alderman Penovick moved for adoption. Mr. Hulbert seconded. Upon a roll call vote the motion to adopt carried unanimously. July 5, 1988 PLAN COMMISSION - Page 2 MISCELLANEOUS BUSINESS: Department outlined a bike path along the WEPCO right of way Mr. Hulbert representing the Park & Recreation through the City of Muskego. The path will be worked on in three phases. The first phase will be from behind Horn Field off of Pioneer Drive east to Lannon Drive. The second phase will be from Lannon Drive to Bay Lane and Woods Road and the third phase will be back to Horn Field to Racine Avenue. In the future they would like to extend the path along Pioneer Drive to Janesville Road to tie in with the Bay Breeze (Ingersoll) project. The first phase for the bike path will be 2,750 feet with the labor in house (signs, aggregate, gates, etc.) with a total cost of $3,665.00 to be taken out of park dedication fees. The width of the path will be 8' and no horses, motorized vehicles will be allowed. At this time Park & Rec are negotiating with the Electric Company regardine the installation of gates to the have a bike path connecting the entire city from Waukesha County entrance and exit of the right of way. The long range plan is to path to Madison. Park to Bluhm Farm which may in the future connect to the bike a Zoning Officer Lee gave a report on developments in the Tess Corners Industrial Park. site plan for the apartments on North Cape Road - Durham Hill School. The Mayor asked for any comments regarding the proposed ADJOURNMENT: Mr. Raimann moved to adjourn at 8:lO P.M. Mrs. Rector seconded and the motion carried. Respectfully submitted, Lynne Sweet Recording Secretary