Loading...
PUBLIC WORKS AND SAFETY COMMITTEE Agenda Packet 07152019CITY OF MUSKEGO PUBLIC WORKS AND SAFETY COMMITTEE AGENDA 07/15/2019 5:00 PM Muskego City Hall, Council Chambers, W182 S8200 Racine Avenue CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL STATEMENT OF PUBLIC NOTICE APPROVAL OF MINUTES Approval of Minutes of the June 17, 2019 Meeting STATUS OF PROJECTS Discussion update. No formal action may be taken on the following: Waukesha Water Bay Lane Reconstruction Hillendale Reconstruction UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: Interstate Spec. Building Public Improvements Jiffy Lube Public Improvements Request for "Hidden Drive" Sign on Field Drive Request for "Stop" Sign on Byron Rd at Hawthorne Rd NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT Packet Page 1 NOTICE IT IS POSSIBLE THAT MEMBERS OF AND POSSIBLY A QUORUM OF MEMBERS OF OTHER GOVERNMENTAL BODIES OF THE MUNICIPALITY MAY BE IN ATTENDANCE AT THE ABOVE-STATED MEETING TO GATHER INFORMATION; NO ACTION WILL BE TAKEN BY ANY GOVERNMENTAL BODY AT THE ABOVE-STATED MEETING OTHER THAN THE GOVERNMENTAL BODY SPECIFICALLY REFERRED TO ABOVE IN THIS NOTICE. ALSO, UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR ADDITIONAL INFORMATION OR TO REQUEST THIS SERVICE, PLEASE CONTACT MUSKEGO CITY HALL, (262) 679-4145. Packet Page 2 Unapproved CITY OF MUSKEGO PUBLIC WORKS AND SAFETY COMMITTEE MINUTES June 17, 2019 5:00 PM Muskego City Hall, W182 S8200 Racine Avenue CALL TO ORDER Alderperson Borgman called the meeting to order at 5:03 PM. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present: Alderperson Madden, Alderperson Borgman, Alderperson Hammel, Scott Kroeger, Director of Public Works and Development Guests: Bill Carity STATEMENT OF PUBLIC NOTICE The meeting was posted in accordance with open meeting laws. APPROVAL OF MINUTES Alderperson Madden made a motion to approve the minutes of May 20, 2019 meeting. Alderperson Hammel seconded. Motion Passed 3 in favor. STATUS OF PROJECTS Discussion update. No formal action may be taken on any of the following: Waukesha Water Director Kroeger stated no updates from last meeting. Bay Lane Reconstruction Director Kroeger stated Bay Lane Road is now closed since school has ended. Project is moving forward with the plan to be 90% finished by the time school resumes in September. Completely finished in October. Hillendale Reconstruction Director Kroeger stated no updates from last meeting. UNFINISHED BUSINESS Discussion update and possible action may be taken on any or all of the following: Will Rose – Internal Water Service Page 1 of 2 Approval of Minutes of the June 17, 2019 Meeting Packet Page 3 Director Kroeger reviewed his memo and spreadsheet for the Committee. He stated Attorney Warchol is against granting the variance for one 3” meter for the whole building. If the Committee would choose to grant the variance requested, it is only a recommendation to the Common Council at this point. Mr. Carity came before the Committee to request a variance to now put individual meters in each unit, he no longer wants one 3” meter for the whole building. He stated the facility will have a full time apartment manager to gain access to individual units. Director Kroeger stated the City preference is to put all the meters into one large, accessible area. Mr. Carity stated it will require 8,000 feet of extra pipe to put all the meters into one central location. Mr. Carity and the Committee continued to discuss the pros and cons of one central location vs individual units. Alderperson Borgman wrapped up the conversation stating the City should follow our Design Standards. Alderperson Borgman made a motion to not grant a variance for one 3” meter for the whole building. The Committee, as a whole, took a voice vote. Motion Passed 3 in favor. NEW BUSINESS Discussion update and possible action may be taken on any or all of the following: Muskego Drive & Jewel Crest Drive – Request for Center Line Pavement Markings Alderperson Borgman presented his reasons (twisting/winding, dark, bad weather, hills) to the Committee as to why he believes that pavement markings should be used on Muskego Drive and Jewel Crest Drive. Alderperson Madden stated she drives around people, dogs, kids, parked cars, very frequently. She stated technically, she could be ticketed each and every time she crossed the line. Alderperson Hammel did not see the benefit or harm in adding center lines based on the accident information provided. He does not believe it would solve the safety issues presented. The Committee discussed as a whole the expense, staff time involved, and that it is not budgeted. NEW BUSINESS PLACED ON FILE (The following items have been placed on file for staff review. Upon completion of review, staff will submit a supplement detailing options and possible course of action to committee members.) COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW ADJOURNMENT Alderperson Madden made a motion to adjourn at 5:40 PM. Alderperson Hammel seconded. Motion Passed 3 in favor. Respectfully Submitted, Wendy Fredlund Recording Secretary Page 2 of 2 Approval of Minutes of the June 17, 2019 Meeting Packet Page 4 CITY OF MUSKEGO Staff Report to Public Works and Safety Committee To: Public Works and Safety Committee From: Scott Kroeger, PE, PLS, Public Works and Development Director Subject: Interstate Spec Building – Water main Date: July 15, 2019 The City of Muskego has reviewed the Interstate Spec. Building plan set (please refer to the latest plan set attached dated 6-5-19). The water will be dedicated to the City of Muskego upon completion and acceptance of the project. The City of Muskego has reviewed the plans and given approval for these plans to move forward contingent upon all City of Muskego staff comments being addressed. Recommendation for Action by the Committee: Approve the water main design plans for Interstate Spec. Building, contingent upon all City of Muskego staff comments being addressed. Page 1 of 6 Interstate Spec. Building Public Improvements Packet Page 5 COMMERCE CENTER LOT 2 CSM NO. 11571 PARKWAY PLAN COMMISSION SUBMITTAL02.01.19 IRN RWI TH E S E P L A N S A N D D E S I G N S A R E C O P Y R I G H T P R O T E C T E D A N D M A Y N O T B E U S E D I N W H O L E O R I N P A R T W I T H O U T T H E W R I T T E N C O N S E N T O F J S D P R O F E S S I O N A L S E R V I C E S , I N C . #Description:Date: MILWAUKEE REGIONAL OFFICE W238 N1610 BUSSE ROAD SUITE 100 WAUKESHA, WISCONSIN 53188 P. 262.513.0666 CREATE THE VISION JSD PROJECT NO: SHEET NUMBER: SHEET TITLE: Design/Drawn: Approved: PLAN MODIFICATIONS: CLIENT: PROJECT: TELL THE STORY CLIENT ADDRESS: PROJECT LOCATION: N16 W23217 STONERIDGE DR. WAUKESHA, WI 53188 MUSKEGO SPEC II MUSKEGO, WI WAUKESHA COUNTY 18-8896 1 FOR BID DOCUMENTS04.18.192 ENGINEERING SUBMITTAL06.05.193 C1.0 SITE DIMENSIONAL AND PAVEMENT ID PLAN SHEET INDEX PAVEMENT STRIPING NOTES PAVEMENT THICKNESS NOTE PAVING NOTES PAVEMENT REMOVAL NOTES Page 2 of 6 Interstate Spec. Building Public Improvements Packet Page 6 COMMERCE CENTER LOT 2 CSM NO. 11571 PARKWAY PLAN COMMISSION SUBMITTAL02.01.19 IRN RWI TH E S E P L A N S A N D D E S I G N S A R E C O P Y R I G H T P R O T E C T E D A N D M A Y N O T B E U S E D I N W H O L E O R I N P A R T W I T H O U T T H E W R I T T E N C O N S E N T O F J S D P R O F E S S I O N A L S E R V I C E S , I N C . #Description:Date: MILWAUKEE REGIONAL OFFICE W238 N1610 BUSSE ROAD SUITE 100 WAUKESHA, WISCONSIN 53188 P. 262.513.0666 CREATE THE VISION JSD PROJECT NO: SHEET NUMBER: SHEET TITLE: Design/Drawn: Approved: PLAN MODIFICATIONS: CLIENT: PROJECT: TELL THE STORY CLIENT ADDRESS: PROJECT LOCATION: N16 W23217 STONERIDGE DR. WAUKESHA, WI 53188 MUSKEGO SPEC II MUSKEGO, WI WAUKESHA COUNTY 18-8896 1 FOR BID DOCUMENTS04.18.192 ENGINEERING SUBMITTAL06.05.193 C2.0 GRADING & EROSION CONTROL PLAN GRADING NOTES x x ’ EROSION AND SEDIMENT CONTROL NOTES x x x x x x x x x x x x Page 3 of 6 Interstate Spec. Building Public Improvements Packet Page 7 COMMERCE CENTER LOT 2 CSM NO. 11571 PARKWAY PLAN COMMISSION SUBMITTAL02.01.19 IRN RWI TH E S E P L A N S A N D D E S I G N S A R E C O P Y R I G H T P R O T E C T E D A N D M A Y N O T B E U S E D I N W H O L E O R I N P A R T W I T H O U T T H E W R I T T E N C O N S E N T O F J S D P R O F E S S I O N A L S E R V I C E S , I N C . #Description:Date: MILWAUKEE REGIONAL OFFICE W238 N1610 BUSSE ROAD SUITE 100 WAUKESHA, WISCONSIN 53188 P. 262.513.0666 CREATE THE VISION JSD PROJECT NO: SHEET NUMBER: SHEET TITLE: Design/Drawn: Approved: PLAN MODIFICATIONS: CLIENT: PROJECT: TELL THE STORY CLIENT ADDRESS: PROJECT LOCATION: N16 W23217 STONERIDGE DR. WAUKESHA, WI 53188 MUSKEGO SPEC II MUSKEGO, WI WAUKESHA COUNTY 18-8896 1 FOR BID DOCUMENTS04.18.192 ENGINEERING SUBMITTAL06.05.193 C3.0 UTILITY PLAN UTILITY NOTES Page 4 of 6 Interstate Spec. Building Public Improvements Packet Page 8 HANDICAP ACCESSIBLE RAMP DETAIL HANDICAP ACCESSIBLE RAMP DETAIL SEWER - WATER MAIN SEPARATION NOTE: CATCH BASIN/INLET UNDERDRAIN INLET PROTECTION NOTE: CONSTRUCTION ENTRANCE NOTE: 18" STANDARD CURB & GUTTER CONCRETE SIDEWALKINTEGRAL CONCRETE CURB & WALK EROSION MATTING ACCESSIBLE PARKING SIGN AND POST INSTALLATION NOTE: PAINTED SYMBOL NOTE: SIGN DETAILS NOTE: PLAN COMMISSION SUBMITTAL02.01.19 IRN RWI TH E S E P L A N S A N D D E S I G N S A R E C O P Y R I G H T P R O T E C T E D A N D M A Y N O T B E U S E D I N W H O L E O R I N P A R T W I T H O U T T H E W R I T T E N C O N S E N T O F J S D P R O F E S S I O N A L S E R V I C E S , I N C . #Description:Date: MILWAUKEE REGIONAL OFFICE W238 N1610 BUSSE ROAD SUITE 100 WAUKESHA, WISCONSIN 53188 P. 262.513.0666 CREATE THE VISION JSD PROJECT NO: SHEET NUMBER: SHEET TITLE: Design/Drawn: Approved: PLAN MODIFICATIONS: CLIENT: PROJECT: TELL THE STORY CLIENT ADDRESS: PROJECT LOCATION: N16 W23217 STONERIDGE DR. WAUKESHA, WI 53188 MUSKEGO SPEC II MUSKEGO, WI WAUKESHA COUNTY 18-8896 1 FOR BID DOCUMENTS04.18.192 ENGINEERING SUBMITTAL06.05.193 C4.0 DETAILS CURBED DRIVEWAY ENTRANCE APRON ENDWALL WITH GRATE Page 5 of 6 Interstate Spec. Building Public Improvements Packet Page 9 PLAN COMMISSION SUBMITTAL02.01.19 IRN RWI TH E S E P L A N S A N D D E S I G N S A R E C O P Y R I G H T P R O T E C T E D A N D M A Y N O T B E U S E D I N W H O L E O R I N P A R T W I T H O U T T H E W R I T T E N C O N S E N T O F J S D P R O F E S S I O N A L S E R V I C E S , I N C . #Description:Date: MILWAUKEE REGIONAL OFFICE W238 N1610 BUSSE ROAD SUITE 100 WAUKESHA, WISCONSIN 53188 P. 262.513.0666 CREATE THE VISION JSD PROJECT NO: SHEET NUMBER: SHEET TITLE: Design/Drawn: Approved: PLAN MODIFICATIONS: CLIENT: PROJECT: TELL THE STORY CLIENT ADDRESS: PROJECT LOCATION: N16 W23217 STONERIDGE DR. WAUKESHA, WI 53188 MUSKEGO SPEC II MUSKEGO, WI WAUKESHA COUNTY 18-8896 1 FOR BID DOCUMENTS04.18.192 ENGINEERING SUBMITTAL06.05.193 C4.1 DETAILS STORM SEWER MANHOLE STORM INLET FLUME DETAIL Page 6 of 6 Interstate Spec. Building Public Improvements Packet Page 10 CITY OF MUSKEGO Staff Report to Public Works and Safety Committee To: Public Works and Safety Committee From: Scott Kroeger, PE, PLS, Public Works and Development Director Subject: Jiffy Lube – Water and Sanitary Sewer Date: July 15, 2019 The City of Muskego has reviewed the Jiffy Lube plan set (please refer to the latest plan set attached dated 6-13-19). The water and sanitary sewer will be dedicated to the City of Muskego upon completion and acceptance of the project. The City of Muskego has reviewed the plans and given approval for these plans to move forward contingent upon all City of Muskego staff comments being addressed. Recommendation for Action by the Committee: Approve the water and sanitary sewer design plans for Jiffy Lube, contingent upon all City of Muskego staff comments being addressed. Page 1 of 17 Jiffy Lube Public Improvements Packet Page 11 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY COVER C0.0 GUGGENHEIM DEV.SERVICES, LLC CONTACT: KURT OVERMYER 3000 INTERNET BLVD, SUITE 570 FRISCO, TEXAS 75034 EMAIL: KURT.OVERMYER@GUGGENHEIMPARTNERS.COM DEVELOPER: CONTACT: KERI WILLIAMS, P.E. 21 SOUTH EVERGREEN AVENUE, SUITE 200 ARLINGTON HEIGHTS, ILLINOIS 60005 TEL: (781) 929-1651 EMAIL: KWILLIAMS@GREENBERGFARROW.COM ENGINEER: SURVEYOR: SITE SITE SHEET INDEX: NEC MORELAND ROAD & COMMERCE CENTER PARKWAY WAUKESHA COUNTY MUSKEGO, WISCONSIN 53150 ZONING: BP-1 PLANNING: ENGINEERING: FIRE: WATER:GAS:ELECTRIC: CONTACTS: LEGAL Page 2 of 17 Jiffy Lube Public Improvements Packet Page 12 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY GENERAL NOTES C1.0Page 3 of 17 Jiffy Lube Public Improvements Packet Page 13 COMM E R C E C E N T E R PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY SITE PLAN C2.0Page 4 of 17 Jiffy Lube Public Improvements Packet Page 14 COMM E R C E C E N T E R PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY GRADING AND DRAINAGE PLAN C3.0 850.50 C 850.00 P BM # 00.00 Page 5 of 17 Jiffy Lube Public Improvements Packet Page 15 COMM E R C E C E N T E R M O O R L A N D R O A D C . T . H . " O " PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY STORMWATER POLLUTION PREVENTION PLAN C3.1Page 6 of 17 Jiffy Lube Public Improvements Packet Page 16 COMM E R C E C E N T E R " PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY UTILITY PLAN C4.0Page 7 of 17 Jiffy Lube Public Improvements Packet Page 17 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY PLAN AND PROFILE C4.1PROPOSED WATER MAIN EXTENSION PROPOSED SANITARY SEWER EXTENSIONPROPOSED FIRE HYDRANT LEAD Page 8 of 17 Jiffy Lube Public Improvements Packet Page 18 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY CONSTRUCTION DETAILS C5.0 RAMP SECTION (AA) RAMP PLAN RAMP PLAN DETECTABLE GROOVE DETAIL Page 9 of 17 Jiffy Lube Public Improvements Packet Page 19 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY CONSTRUCTION DETAILS C5.1Page 10 of 17 Jiffy Lube Public Improvements Packet Page 20 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY CONSTRUCTION DETAILS C5.2Page 11 of 17 Jiffy Lube Public Improvements Packet Page 21 COMM E R C E C E N T E R PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY DRAINAGE AREAS EXHIBIT EX-1Page 12 of 17 Jiffy Lube Public Improvements Packet Page 22 COMM E R C E C E N T E R PARK W A Y 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.3 0.4 0.3 0.2 0.2 0.2 0.2 0.3 0.6 0.7 0.5 0.5 0.5 0.5 0.6 0.8 0.9 0.8 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.2 1.1 3.0 3.3 3.3 2.4 1.3 0.7 0.6 0.9 1.8 2.0 1.6 1.5 1.3 0.3 4.4 4.1 3.0 1.5 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.2 2.4 7.0 3.7 1.5 1.4 3.1 6.4 5.1 5.1 3.9 7.1 8.2 8.7 9.4 3.5 1.2 0.4 0.2 0.1 0.1 0.0 0.0 0.1 0.3 3.7 5.0 5.7 2.0 2.1 3.7 8.0 11.1 11.3 8.3 8.3 12.6 14.9 10.8 7.4 3.1 1.1 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.5 4.7 5.9 6.1 1.9 2.8 4.1 8.4 15.3 12.7 9.5 13.5 11.6 12.7 9.6 6.0 3.5 1.4 0.6 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.6 4.5 5.7 6.5 5.5 1.7 2.5 4.4 11.2 14.9 11.8 9.4 5.1 10.5 9.3 5.2 3.7 1.9 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.8 5.9 6.1 7.4 5.4 1.4 2.4 6.0 9.0 10.6 9.9 5.5 3.7 6.3 5.2 3.7 2.6 1.2 0.6 0.3 0.2 0.1 0.0 0.0 0.0 0.1 1.2 8.8 9.9 8.2 5.6 1.4 1.8 2.6 3.0 4.3 3.6 2.1 1.5 2.9 2.7 1.7 1.2 0.8 0.4 0.2 0.1 0.0 0.0 0.0 0.1 2.0 10.9 8.1 10.4 5.5 1.3 1.2 1.4 2.1 2.3 1.8 1.3 1.1 1.4 1.2 0.8 0.6 0.4 0.3 0.2 0.0 0.0 0.0 0.2 2.7 9.7 11.2 4.2 1.2 1.9 2.3 3.2 3.4 2.5 2.0 1.3 0.9 0.6 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.2 2.8 6.8 9.6 2.6 1.1 3.6 5.3 4.6 4.7 5.0 4.4 1.4 0.6 0.4 0.2 0.2 0.0 0.0 0.0 0.0 0.2 2.0 3.9 0.3 0.3 0.5 5.4 6.4 1.4 1.0 3.3 10.7 10.4 9.7 11.9 4.4 1.2 0.5 0.3 0.2 0.0 0.0 0.0 0.0 0.1 0.6 0.7 0.1 0.1 0.1 2.6 2.7 0.7 1.1 3.8 10.3 15.2 16.3 10.0 4.8 1.5 0.5 0.2 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.1 0.1 0.5 0.7 0.4 0.8 3.1 9.5 10.5 11.5 9.8 4.0 1.1 0.4 0.0 0.0 0.1 0.2 0.2 0.5 1.3 3.9 6.8 7.5 4.4 1.6 1.1 2.3 2.4 1.3 GWC MH: 8'-4" SB MH: 15.5' GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" GWC MH: 8'-4" SB MH: 15.5' SB MH: 15.5' Luminaire Schedule Symbol Qty Label Arrangement Description 3 SB SINGLE OSQ-HO-A-NM-4ME-40L-57K-UH 10 GWC-AF-01-LED-E1-T3-600 SINGLE GWC-AF-01-LED-E1-T3-600 Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min Jiffylube Site Illuminance Fc 3.31 16.3 0.1 33.10 163.00 1430 W. Peachtree St. NW Suite 200 Atlanta, GA 30309 t: 404 601 4000 f: 404 601 3970 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY PHOTOMERTIC PLAN PH1.0Page 13 of 17 Jiffy Lube Public Improvements Packet Page 23 COM M (1)UR (1)UR (1)CC (1)CC (1)GP (43)AM (5)RG 1 1 1 1 1 2 2 2 3 3 3 3 2 4 4 4 4 4 5 5 5 5 5 5 55 5 6 6 6 6 6 (5)FB 2 7 (6)FB (5)AM (5)AM 2 3 (6)PH (8)JP (8)JP (14)LB (3)IM (3)IM (21)LB 3 2 (18)LB (15)PH (8)TT2 (3)AA2 (16)HH (40)AM (12)AM (1)UR (2)GP (5)AM (6)PH (13)NR (8)NR (23)NR 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO, WISCONSIN LANDSCAPE PLAN L1.0 LANDSCAPE CALCULATIONS: PLANT SCHEDULE 1 2 3 4 5 6 7 REFERENCE NOTES SCHEDULE MAINTENANCE OF LANDSCAPING GENERAL NOTES: Call 811 or (800) 242-8511 NORTH LANDSCAPE PLAN 0 feet40 1" = 20' 20 60 LEGAL DESCRIPTION: Page 14 of 17 Jiffy Lube Public Improvements Packet Page 24 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO, WISCONSIN LANDSCAPE NOTES & DETAILS L2.0GROUNDCOVER/ANNUAL/PERENNIALDECIDUOUS/EVERGREEN SHRUB DECIDUOUS TREE CULTIVATED BEDLINE EVERGREEN TREE LANDSCAPE PLAN GENERAL NOTES: TREE PLANTING DIAGRAM Page 15 of 17 Jiffy Lube Public Improvements Packet Page 25 COMM E R C E C E N T E R PARK W A Y 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9537 MUSKEGO WISCONSIN NEC MOORLAND ROAD & COMMERCE CENTER PARKWAY GRADING AND DRAINAGE PLAN C3.0 850.50 C 850.00 P BM # 00.00 Page 16 of 17 Jiffy Lube Public Improvements Packet Page 26 CO M M E R C E C E N T E R P A R K W A Y M O O R L A N D R O A D C . T . H . " O " To:Greenberg Farrow Architecture, Inc., Guggenheim Development Services, LLC, a Delaware limited liability company, Muskego Commerce Center East LLC, a Wisconsin limited liability company, Old Republic National Title Insurance Company, and Wisconsin Title Service Company, Inc. This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS and includes items 1, 2, 3, 4, 5, 7(a), 7(b)(1), 8, 9, 11, 13, 17, 18, 19, and 20 of Table A thereof. The fieldwork was completed on September 11, 2018. Date of Plat or Map: November 7, 2018 Eric R. Sturm Professional Land Surveyor Registration Number S-2309 eric.sturm@rasmith.com A. Basis of Bearings Bearings are based on the East line of the Northeast 1/4 of Section 3 Township 5 North Range 20 East, which is assumed to bear North 0°40'47" East. B. Title Commitment This survey was prepared based on Old Republic National Title Insurance Company title commitment number 1809R0163 Amended (Revised 11.1.18), effective date of October 5, 2018, which lists the following easements and/or restrictions from schedule B-II: 1-4, 9, 22. Not Survey related exceptions. 5, 6, 7, 8 Visible evidence shown, if any. 10. Covenants, Conditions and Restrictions contained in Development Agreement recorded on October 14, 2008 as Document No. 3604282. Partial Release of Initial Parcel from Development Agreement recorded on October 14, 2008 as Document No. 3604285. Partial Release of Subsequent Parcel from Development Agreement recorded on September 7, 2010 as Document No. 3769877. Does not affect site by location - Not shown. 11. Covenants, Conditions and Restrictions contained in Declaration of Restrictions recorded on October 14, 2008 as Document No. 3604283. Affects site by location - general in nature, cannot be plotted. 12. Storm Water Drainage Easement Agreement recorded on October 14, 2008 as Document No. 3604287. Does not affect site by location - Not Shown. 13. We Energies - Distribution Easement Underground recorded on December 18, 2008 as Document No. 3615314. Affects site by location - Shown. 14. Utility Easement Agreement recorded on September 7, 2010 as Document No. 3769878. Does not affect site by location - Not Shown. 15. Distribution Easement Underground Joint recorded on November 22, 2010 as Document No. 3794168. Affects site by location - Shown. 16. Revocable Occupancy Permit recorded on August 30, 2011 as Document No. 3852658. Does not affect site by location - Not Shown. 17. Declaration of Deed Restrictions for Muskego Commerce Center East, LLC recorded on June 17, 2014 as Document No. 4084286. Affects site by location - general in nature, cannot be plotted. See note F below for height restriction. 18. Restrictive Covenant recorded on June 26, 2014 as Document No. 4086137. Affects site by location - general in nature, cannot be plotted. 19. Cross Access Easement recorded on June 26, 2014 as Document No. 4086138. Does not affect site by location - Shown. 20. Sign Easement Agreement recorded on June 26, 2014 as Document No. 4086139. Does not affect site by location - Shown. 21. Distribution Easement Underground recorded on December 18, 2017 as Document No. 4316084. Does not affect site by location - Not Shown. C. Flood Note According to flood insurance rate map of the City of Muskego, community panel number 55133C0361G, effective date of November 5, 2014, this site falls in zone X (areas determined to be outside the 0.2% annual chance floodplain) D. Parking Spaces There are no parking spaces marked on this site. E. Elevations Elevations refer to NGVD 29 Datum. F. Municipal Zoning The zoning information listed below is taken from a Municipal Zoning Code, site is zoned BP-1 Business Park and Office Park Support District Minimum setback - 40 feet Minimum offset one side - 20 feet Minimum offset all other sides - 20 feet Maximum height - 30 feet Maximum height - 25 feet per Document No. 4084286 17 G. Notes There is no evidence of recent earth moving work, building construction or building additions observed in the process of conducting the fieldwork. There is no proposed changes in street right of way lines, if such information is made available to the surveyor by the controlling jurisdiction observed in the process of conducting the fieldwork. There is no evidence of recent street or sidewalk construction or repairs observed in the process of conducting the fieldwork. There is no evidence of wetland flags on the site observed in the process of conducting the fieldwork. ( IN FEET ) GRAPHIC SCALE 0 60301515 SHEET OF ALTA/NSPS LAND TITLE SURVEY WITH TOPOGRAPHIC DATA 11 S:\5167658\Dwg\AS101D30.dwg \ COMMERCE CENTER DR Situated on Commerce Center Parkway, in the City of Muskego, Waukesha County, Wisconsin. PARCEL A Part of Lot Two (2) of CERTIFIED SURVEY MAP NO. 11185, a Division of Lot One (1) of Certified Survey Map No. 10798, being a part of the Northeast One-quarter (1/4) of the Northeast One-quarter (1/4) of Section Three (3), in Township Five (5) North, Range Twenty (20) East, in the City of Muskego, Waukesha County, Wisconsin, recorded in the Office of the Register of Deeds for Waukesha County on June 17, 2014 in Book 110, Pages 50 to 54 inclusive, as Document No. 4084484, bounded and described as follows: Commencing at the Southwest corner of said Lot 2; thence Northeasterly 150.06 feet along the East line of Moorland Road (CTH O) and the arc of a curve whose center lies to the East, whose radius is 1535.42 feet, and whose chord bears North 09°48'52” West 150.00 feet to a point; thence North 82°02'45” East 189.30 feet to a point; thence South 49°48'52” East 174.28 feet to a point on the Northwesterly line of Commerce Center Parkway; thence Southwesterly 88.29 feet along said Northwesterly line and the arc of a curve whose center lies to the Southeast, whose radius is 260.00 feet, whose chord bears South 40°01'58” West 87.87 feet to a point on the North line of Lot 1 of Certified Survey Map No. 11185; thence North 59°41'35” West along said North line 36.08 feet to a point; thence South 88°45'40” West along said North line 167.92 feet to a point; thence South 77°23'09” West continuing along said North line 40.49 feet to the point of commencement. Said lands contain 40,275 square feet, or 0.9246 acres. PARCEL B Non-exclusive easements set forth in a Cross Access Easement recorded June 26, 2014, as Document No. 4086138. PARCEL C Non-exclusive easement set forth in a Sign Easement Agreement recorded on June 26, 2014, as Document No. 4086139. September 11, 2018 Greenberg Farrow Architecture, Inc,Drawing No. 167658-BDG Recorded easements as illustrated on Certified Survey Map No. 11185 are shown hereon. O STURM ERIC R. WI EAGLE S-2309 SITE S: \ 5 1 6 7 6 5 8 \ D w g \ A S 1 0 1 D 3 0 . d w g , C O M M E R C E C E N T E R D R , 1 1 / 7 / 2 0 1 8 3 : 3 9 : 0 2 P M , e r s Page 17 of 17 Jiffy Lube Public Improvements Packet Page 27 CITY OF MUSKEGO Staff Report to Public Works and Safety Committee To: Public Works and Safety Committee From: Scott Kroeger, PE, PLS, Public Works and Development Director Subject: Request for “Hidden Drive” Sign on Field Drive Date: July 15, 2019 A request has been made by a resident for a warning sign of “Hidden Drive” to be put up for the house located at the following residence, S75 W21187 Field Drive. This house is located on the South side of Field Drive and is the first driveway entrance located to the East of the Field Drive and Anne’s Way intersection. The house is situated at the top of hill with the bottom of the hill located at the Field Drive and Anne’s Way intersection. This limits the sight lines along Field Drive. Example of a “Hidden Drive” Sign Field Visit and Photo Looking West down Field Drive from driveway Page 1 of 2 Request for "Hidden Drive" Sign on Field Drive Packet Page 28 Looking East down Field Drive from driveway The photos do show sight line issues due to the hill from the West. Additionally, the trees should be trimmed at his driveway entrance. Accident Data (Last 5 years) No accidents have occurred in front of his residence. One accident occurred at Field/Anne’s Way in 2015. Second accident 5 blocks east of this address in 2017. Both of those accidents would not have been related to the hill at his house. Chief Rens has noted there is a rather steep hill located at the driveway entrance. Please be aware that this condition has existed for a long time. Recommendation for Action by the Committee: City of Muskego staff would recommend a sign being place for traffic heading East along Field Drive for this residence from the Anne’s Way intersection to make them aware of this entrance. The hill located just West of this property reduces the sight line for this driveway entrance significantly. Furthermore, City of Muskego staff recommends that DPW trim the trees near this driveway entrance in the right of way to provide improve sight lines. Page 2 of 2 Request for "Hidden Drive" Sign on Field Drive Packet Page 29 Page 1 of 1 Request for "Stop" Sign on Byron Rd at Hawthorne Rd Packet Page 30