PWCommittee - MINUTES - 3/9/1972I
-
To Mr. Eugene Pankowski from Gerald Lee regarding sump pump running on
C.T.H. "00".
To Wis. Telephone Co. from Clark Barry regarding Woodhill Subdivision.
To Paschke & Associates from Engineer Barry regarding sewers in Parkland
Plaza.
To Inman, Inc. from Engineer Barry regarding Lincolnshire Subdivision
drainage.
To Frank Ruekert, Sr. from Engineer Barry regarding monument setting on
Union Church Rd.
To Sewer Committee from Engineer Barry ragarding Metropolitan Sewage
Commission Inspection and Plan Review Fees.
To Director of Public Works in New Berlin from Engineer Barry regarding
drainage and fill site on College Ave.
To Wisconsin Electric Power Co. from Engineer Barry regarding drainage
problem on Martin Dr.
To Paul Burbach from Engineer Barry regarding drainage problems resulting
from Woodhill Subdivision.
To Mayor Gottfried from Inman Surveying regarding proposed modernizing
of Tess Corners Rd.
To Mayor Gottfried from Dept. of Transportation regarding National Bridge
Inspection standards.
To Inman, Inc. from Engineer Barry regarding certified survey of J. Scheerer.
To Div. of Highways from Engineer Barry regarding Muskego's urban road aid
qualifications and a report submitted to committee by Engineer Barry re-
garding the same subject.
From E. Freiwald, Pewaukee, Wis. and Mr. W. Weizelewski directed to City
of Muskego requesting the refilling of Little Muskego Lake.
From DNR to Mayor Gottfried requesting drawdown of Little Muskego Lake
to be allowed until next year.
The following applications for employment were reviewed and placed on file:
Donald Zeman, Muskego John Szczerbiak, Milwaukee
James Tolson, Milwaukee Charles Sterrett, Muskego
Gregory Zuehl, Muskego Randolph Stahnke, Muskego
The cormnittee directed Supt. Bertram to obtain cost figures for the tiling
across the Stefaniak farm to relieve water problem on Don Schrieber
property.
Mr. Frank Ruekert appeared to discuss sewer, water and grading plans for
Industrial Park. The specifications are ready for bidding and Ald. Burger- . . meister moved to advertise for bids for sewer, water, streets and graarng
\for the Industrial Park and that bids be opened on April 17, 1972, at
4‘:OO P.M. Seconded by Ald. DdBack, motion carried.
PUBLIC WORKS COMMITTEE - CITY OF MUSEEGO
MINUTES OF MEETING HELD MARCH 9, 1972
Chairman Burgermeister called the meeting to order at 7:15 P.M. Also
present were Alderman DeBack, Mayor Gottfried and Supt.,Bertram.
Mr. Elmer Heilmann, representing St. Paul's Church, Tess Corners,
appeared to view the plan of the proposed storm sewer through the
church property.
Mr. Don Schrieber, Woods Rd., appeared to discuss drainage problems on
his property.
The following correspondence was reviewed and placed on file.
.‘\ \
9
*
i, &
c
a
,’
Public Works Committee City of Muskego
March 9, 1972
Mr. Gordon Mross of Ruekert & Mielke appeared to discuss plans for the
new city garage. Ald. DeBack moved to advertise for bids for the city
garage and bids are to be opened on April 7, 1872, at 4:00 P.M. Seconded
by Ald. Burgermeister. Motion carried.
The Committee will get an estimate from Behrens Moving Co. for the moving
of furniture and books to the new city hall.
Ald. Burgermeister moved to authorize two men from the DPW to work on
a drainage problem in the vicinity of Holz Drive in cooperation with
property owners in the area. Seconded by Ald. DeBack, motion carried.
Ald. Burgermeister moved to have Wisconsin Road Crossing extend a pipe
into Little Muskego Lake appaoximately 30 feet so as to make it possible
to lower the lake level to approximately six feet at any time. Seconded
by Ald. DeBack, motion carried.
It was brought to the Committee's attention that the Public Works
Department employes are not in accord with the proposed city's salary
and fringe benefits offered. The representatives of that department
would like more negotiations with the Finance Committee.
Ald. Burgermeister moved to pay Michels Pipeline Co. $2200.00 on the
Gold Drive Bridge project. Seconded by Ald. DeBack, motion carried.
Supt. Bertram reported on tractor and mower bids. The following bids
were received:
Bosch Hardware & Implement Co. $4,735.00
Connell Equipment Co. 4,676.70
Milwaukee Ford Tractor 4,446.06
Eichstadt Implement Inc. 4,325.OO
Oak Creek Equipment Co. 4,395.oo
Ald. DeBack moved to recommend to the Council the acceptance of the Is
bid of Oak Creek Equipment for a tractor and mower at a cost of $4,395.00
due to a better grade of tires. Seconded by Ald. Burgermeister. Motion
carried.
Ald. Burgenneister moved, as seconded by Ald. DeBack that as soon as
the deadend is opened into Schaefer's Woods (Suchalia property at S76
W19763 Sunnyhill Dr. in Hillendale Heights Subdivision, that the city
would restore the land. Motion carried.
Ald. Burgermeister moved to have Ruekert & Mielke draft the specifications
for the rebuilding of Tess Corners Road from Woods Road to the County
Line. Seconded by Ald. DeBack. Motion carried.
Ald. DeBack moved to adjourn. Seconded by Ald. Burgermeister. The
meeting adjourned at lo:25 P.M.
karold DeBack, Sec'y.
Public Works Committee
\\ HD/je