PWCommittee - MINUTES - 10/5/1972PUBLIC WORKS COMMITTEE - CITY OF MUSREGO
MINUTES OF MEETING HELD OCTOBER 5, 1972
Chairman DeBack called the meeting to order at 8:00 P.M. Also present
were committee members Schaumberg and Ford, Mayor Gottfried, Engineer
Barry and Supt. Bertram.
Mr. and Mrs. Wayne Peterson, S68 W16918 Martin Drive, appeared to discuss
the drainage ditch work being done in front of their property.
Mr. Frank DeAngelis, S87 W19543 Woods Rd., appeared to discuss the road
easement through his property. After much discussion, Ald. Ford moved to
reaffirm the previous action of the committee regarding this matter.
Seconded by Ald. Schaumberg. The motion carried with Aid. DeBack voting
"no".
Mr. Garland Hetzel, S70 W17855 Muskego Drive, appeared to discuss a
drainage problem at his house. Supt. Bertram will attempt to locate
an old unused tile which goes to the lake as a possible solution.
Ald. Schaumberg moved to recommend that the Common Council accept the
low bid of DeBack Grading for the reconstruction of Tess Corners Drive
from Woods Rd. to the County Line in the amount of $50,667.00 minus
$6,900.00 covering the seeding which will be reviewed at a later date.
Seconded by Ald. Ford, motion carried.
Mayor Gottfried agreed to talk to Mr. Fillman of Woods Road regarding
the restoration agreement between Mr. Fillman a~nd the City.
Ald. Ford requested that a drainage survey be made of the area roughly
bounded by Martin Drive, Lentini Drive and College Avenue and then south
to Jewel Creek to determine future storm sewer needs. Engineer Barry
agreed to make such a survey.
Engineer Barry reported that the grading contractor for the Industrial
Park site is not making a serious attempt to complete his work despite
recent good weather. Consequently, progress on the city garage is being
delayed. Ruekert & Mielke will be asked to "light a fire" under the
contractor.
Chairman DeBack reported a request by the Safety Committee that the
Public Works Department purchase a few road barricades for police use
in emergencies. Supt. Bertram suggested that the Police Dept. continue
to utilize the services of the Barricade Service Co. because they are
inexpensive and reliable.
Mayor Gottfried reported that no reply has yet been received from Waukesha
County Mighway Commissioner Vence Demshar regarding additional culverts
needed at 165th and College Ave.
Supt. Bertram and Engineer Barry reported that they had surveyed the Ruby
Drive area and that no ditch could be placed on the north side of Ruby
Drive without an easement from the property owners.
Supt. Bertram reported that he has obtained a temporary construction
easement from George Schaefer of Lions Park Drive for a storm sewer to
Little Muskego Lake. Work will proceed as soon as possible.
'A discussion was held of a sub-drain along the John Schmidt property *\ InFountainwood. Ald. DeBack moved to have the city install such a drain
if the owner will pay the material costs.
is needed.
Approximately 160' of 6" pipe
The motion was seconded by Ald. Schaumberg and carried.
\
\
\
i ’
0
Public Works Committee
IO-5172 - Page 2.
Ald. Ford moved that the city install approximately 165' of underground
storm sewer through the Robert Sadowski property on Topaz Drive to
correct drainage problems in that area. The remaining 100' to Jewel
Creek will be swaled. A permanent easement will be required. The
motion was seconded by Ald. Schaumberg, motion carried.
Correspondence was reviewed and placed on file.
The 1973 Highway Dept. budget was reviewed and approved by the Committee.
Chairman DeBack agreed to provide committee members with copies of the
Capital Budget for review at the next meeting.
Ald. Ford moved to adjourn. Seconded by Ald. DeBack. Motion carried.
The meeting adjourned at 12:00 Midnight.
.
Respectfully submitted,
PDx;yA/?TTEE
Ron Ford, Sec'y.