Loading...
PWCommittee - MINUTES - 2/6/1969PUBLIC WORKS COMMITTEE - CITY OF MUSKEGO l MINUTES OF MEETING HELD FEBRUARY 6, 1969 The meeting was called to order at 4:00 P.M. by Chairman Budish. Also present were Aldermen Wollman and DeBack, Mayor Wieselmann and Supt. Bertram. Mr. Franz Michels appeared regarding a drainage problem that exists on his lot on North Shore Drive. His neighbor to the north, Mr. e Enderby, appear regarding the same drainage problem. It was decided that Mr. Franz Michels will have to sign an affidavit that a ditch will be put in to the satisfaction of the city and to be completed by June 1, 1969. An Occupancy Permit will not be issued before ditch is completed. City Engineer Ruekert appeared with engineering information on roads and the cleaning of the ditch from Racine Ave. to the dam on Little Muskego Lake. He discussed beefed up road standards and assessment policies on roads. He indicated that an assessment policy on roads should be good for the city and that sooner or later we will be forced we will be forced with it. Mr. Raymond Wallner appeared proposing a solution to a problem of 0 water and sewage running down the ditch in front of lot where he is to build a new home. A report from the City Engineer was received regarding laterals installed on Cook Drive. Ald. Wollman moved, seconded by Ald. DeBack to grant permission to the Wisconsin Natural Gas Co. to install the following: 1,931 ft. of 3" H.P. main in Hilltop Lane, Bellview Dr. and Bay Lane to serve Richard Schaumberg, W165 S6641 Bay Lane. 376 ft. of 6" H.P. main and 1 3/4" H.P. lateral to serve LeRoy Merkel, W126 S9587 North Cape Rd. 737' of 2" H.P. main in Lake Dr. & Wildwood Dr. to serve Frederick Moors, S69 W17714 and Warren Osborn, W176 S6960 Wildwood Dr. 1,246 ft. of 6" H.P. main in Field Dr. to serve Ken Erdman, S75 W21675 Field Dr. 426 ft. of 2" H.P. main to serve Robt. Iverson, S69 W17596 and S67 W17647 Wildwood Dr. 6,362 ft. of 6" H.P. Steel main in S.T.H. "36" and 6 3/4" laterals and approx. 2,000 of 2" laterals to serve Muskego Lakes Golf Course. Motion carried. Committee received specifications for highway mower and tractor from Supt. Bertram. Ald. Wollman moved to advertize for bids for highway mower and tractor to be received by the Public Works Committee until 4:00 P.M., March 6, 1969, and that the bid be accompa~nied by a bid bond or certified check in the sum of 5% of the bid. Seconded by Ald. DeBack, Motion carried. Report received of temporary wiring at sewer life station from Building ‘Inspector Lee. Copy.~of l.etter was read that had been sent to the Wis. Natural Gas Co. by the City and one written by Wm. Ahrens concerning unsatisfactory work that had been done by the Gas Company on his property. Supt. Bertram reported on a Road Equipment Show being held in Chicago and requested permission for the highway men to attend for one day. Ald. DeBack moved to adjourn the meeting, seconded by Aid. Wo lman. Motion carried. The meet<ng adjourned at 6:40 P.M. 1. &w Harold DeBack, Sec'y. ,T L,. 7. 1 n .