PWKA Committee Status Report 062804 Sean E. McMullen, Director W182 S8200 Racine Avenue ENGINEERING/BUILDING Muskego, WI 53150 (262)679-5686 INSPECTION DEPARTMENT PUBLIC WORKS COMMITTEE STATUS REPORT FOR: JUNE 2004 (Update submitted on 6/23/04)  Rosewood Landscaping - Mayor Slocomb and I met with Paula Johnson (S72 W14867 Rosewood Drive). Ms. Johnson’s newest request is filling of the easement area up to the right-of-way line and installing fence at the right- of-way line. We will be looking at possible locations and different alternatives for filling in this area. Once a decision has been made and agreed upon by Ms. Johnson, I will advise committee. However, if large amounts of fill will be brought in to this easement area, those plans will be brought before the committee for their approval. Sean is still working with Paula Johnson on potential fill areas. Will be waiting until Spring to finalize. 3/15/04 - Nothing new to report. 4/22/04 - Nothing new to report. 5/26/04 – Waiting for Paula Johnson to respond to city’s letter of May 14, 2004. 6/23/04 – Advised that Paul Johnson didn’t receive 5/14/04 letter because of error in address. Resent letter and received email from her (attached) and responded to her (attached)  Tess Corners Pond Expansion/Drainage Issues (New Berlin) - The public notice expired and no comments were received. The DNR is completing the paper work for permit which we should receive by our meeting date of March 22, 2004.The environmental issues have been approved and the DNR’s engineer has signed off on the project. The permit application should be going to publication within the next 15-20 days. This has to be in the paper for 30 days and if no one objects, a permit is then issued. Once a permit is issued we will look at land acquisition with the City of New Berlin with a late Summer or early Fall 2004 construction start. The public notice is in the paper and it expires on 3-4-04. To date, the DNR has not had any public comments on the project and Sean will be meeting with the City of New Berlin this week for land acquisition. 3/15/04 - The public notification has expired and no comments were received. The DNR is completing the paper work for the permit which we should received by our meeting date of March 22, 2004. 4/22/04 - Received DNR and Army Corp of Engineers JUNE 23, 2004 MAY COMMITTEE REPORT PAGE 2 permit. Relocation order is going to the City of New Berlin’s Common Council agenda for their second meeting in May and will be discussing the project with the DNR and their relocation experts before that meeting. Looking at a late Summer, early Fall construction date. 5/26/04 - Relocation Order went to the City of New Berlin’s Public Works Committee at the end of May and will be going to their Common Council meeting in June. A meeting has been th scheduled with DNR/City of New Berlin/City of Muskego for June 11 to go over the DNR’s process and timelines for land acquisition. 6/28/04 – The City of New Berlin has approved all relocation orders and they have been sent to the DNR. Still looking at a Fall 2004 construction date.  Janesville Road Reconstruction Project - The DNR had objections regarding navigating waterways and the retention pond in back of BioSource Flavors. The City of Muskego requested a meeting with the DNR, on behalf of Waukesha County, and we were able to negotiate minor changes to address the DNR’s concerns. This delay will backup the bid date thst from January 22, 204 to February 17, 2004. The construction start of April 15 thru May 1 will not change. The Utility relocation work scheduled for completion the third week in March. Bids were received on February 18, 2004 and the apparent low bidder is Mann Brothers with an estimated construction cost of $4,360,417.04. The City of Muskego’s portion is under the original estimate. 3/15/04 - Preconstruction meeting is scheduled for 3/25/04 and the th construction operations meeting is scheduled for 3/12/04. Construction start of April 15 thru stth May 1 has not changed. 4/22/04 - Construction will start on April 26. All construction details can be seen by linking into the City of Muskego’s website - engineering - links - Janesville Road Reconstruction. 5-26-04 – Construction still in progress and contractor (Mann Bros.) has been requested to supply to the City a monthly report on their schedule. Copies will be given to all aldermen. We have been working with Waukesha County and contractor to keep the access points to all of the subdivisions open as long as possible and to make the closures as minimal as possible. 6/28/04 – City has received a new schedule for road closures and Woodland Place to th Tess Corners will be closed on July 6 for 28 days.  Durham Drive Realignment - Waiting to find out if CMAQ funding has been approved. Once we get final word from the State, the committee will be notified. Still waiting word from the DNR. 3/15/04 - Nothing new to report. 4/22/04 - Nothing new to report. 5/26/04 – Nothing new to report. 6/28/04 – Nothing new to report  Martin Drive Realignment - All of the works has been completed and final payments have been held due to sewer trench settlement at the Basse driveway. Once the paving plants open in Spring, this will be corrected, at no cost to the City, and the funds will be released. At the request of the Public Services Committee, Waukesha County has reopened the request for traffic signals at this intersection. They are approximately 20% completed with the study review and once I receive this information, I will forward on to the committee. Nothing new to report. Nothing new to report. 3/15/04 - Nothing new to report. 4/22/04 - Met with the th contractor on May 4 to take care of the road damage caused by sewer settling. 5-26-04 – Met with contractor and we are working on methods to repair the roadways and those repairs will be done this summer. 6/28/04 – Sean will check with Vivian Kuss from WE Energies on the status of the relocation of streetlight. Contractors for Chamberlain Hills Subdivision are doing replacement on segments going into subdivision as well as ditch replacements. 2 JUNE 23, 2004 MAY COMMITTEE REPORT PAGE 2 FUTURE PROJECTS: Cherrywood Bridge – 5/26/04 – Waiting for bids to come back from contractors. 6/28/04 – Towne Realty has not selected contractor. They are looking at different alternatives for their construction timing. They are aware that the bridge construction has to be done prior to any building permits being released for Candlewood Creek Addn. #1. Idle Isle Bridge – 5/26/04 – Met with Suzie Link (Chairman of the Little Muskego Lake District Commissioners) today to discuss construction schedule which will be from September 1, 2004 to November 1, 2004. Will be doing the boat launch at the same time. However, the th boat launch will need to be down until around the 15 of November, 2004. th 6-28-04 – The work on Idle Isle Bridge is scheduled to commence on September 12 st through November 1. The bridge will be closed most of that time because it is a complete deck replacement. Wayne Delikat, Public Works Superintendent, suggested that a sign be posted s soon as possible advising of closing. A sign will e posted by th July 9 to inform the public on the closures of the parks and launch. Drainage Concerns – Country Squire Drainage Concern – Quietwood/Bay Lane Traffic Count Durham Drive – 6/28/04 This project has been placed on the list for traffic counts. Once the count have come in, they will be made available to the committee. Drainage ditch behind S70 W15051 Cornell Circle Hwy. 36 Muskego Dam Road – 6/28/04 – A copy of the 60% plans are attached for your review. The new milestone dates are also attached. The project will be completed in mid-Spring 2005. 3