Loading...
Public Works Committee - MINUTES - 12/2/2009 CITY OF MUSKEGO Approved PUBLIC WORKS COMMITTEE MINUTES OF MEETING HELD MONDAY DECEMBER 2, 2009 Alderman Snead called the meeting to order at 5:00 p.m. with Ald. Schneider and Ald. Schaumberg present along with City Engineer David Simpson. Alderman Snead led those present in the Pledge of Allegiance. The meeting was noticed in accordance with the Open Meeting Laws on November 25, 2009. APPROVAL OF MINUTES OF NOVEMBER 4 AND NOVEMBER 24, 2009 Ald. Schneider moved to approve the minutes of November 4 and November 24, 2009. Seconded by Ald. Schaumberg. Motion carried 3-0. CITY ENGINEER/PUBLIC WORKS SUPT. REPORT None STATUS OF PROJECTS Janesville Road Phase II – City Engineer Simpson met with the county Nothing new Durham Drive Reconstruction – City Engineer Simpson informed the Committee the project is still on hold and the sewer will be discussed at the next Utility meeting. UNFINISHED BUSINESS None NEW BUSINESS Discuss timing and level of Little Muskego Lake Drawdown (Mayor Johnson) – Mayor Johnson informed the Committee that a range level of up to 24” was set by the DNR. The Lake District recommends the level of draw down and the Public Works Department lowers and raises the level accordingly. Ron Ford, a resident on the upper end of the north channel, informed the Committee that he cannot access the lake from his property due to the level of drawdown. He would like to see the drawdown level at 12”. Little Muskego Lake District recommended a drawdown of 17” this fall to prevent damage to the shore line and to prevent damage to equipment that is left near the shore line. This recommendation was given to the Public Works Department and the lake was lowered 17”. Ald. Snead suggested that Mr. Ford work with the Little Muskego Lake District regarding dredging of the channel. It was also brought to the Committee’s attention that due to the fact that water was not taken out of Big Muskego Lake in anticipation of receiving the water from Little Muskego Lake, Big Muskego Lake is now flooded. There is nothing that can be done this year, but City Engineer Simpson suggested that the Public Works Department update their Policies and Procedures for future drawdowns. Public Works Committee Page 2 December 2, 2009 SUBDIVIDER’S EXHIBITS None ACCEPTANCE OF IMPROVEMENTS None NEW BUSINESS PLACED ON FILE Ald. Schneider requested that Luehring Drive be placed back on the agenda for January. COMMUNICATIONS AND MISCELLANEOUS BUSINESS AS AUTHORIZED BY LAW None ADJOURNMENT Ald. Schneider moved to adjourn the meeting at 6:18 p.m. Seconded by Ald. Schaumberg. Motion carried 3-0. Respectfully submitted, Sally Bukowski Recording Secretary