Loading...
Public Works Committee - MINUTES - 3/11/1997PUBLIC WORKS COMMIlTEE - CITY OF MUSKEGO MINDTES OF SPECIAL MEETING HELD TUESDAY, MARCH 11, 1997 The meeting was called to order at 7:04 P.M. by Chairman D'Acquisto. Also present were Committee Member Pionek, Mayor De Angelis, Ald. Salentine, Ald. Sanders, Ald. Rasmussen, Ald. Patterson and those per attached list. Committee Member Suhr was excused. Mr. Bob Gassert, Metropolitan Engineering, appeared before the committee to further discuss final plat and construction plans for Lakewood Meadows Addn. #2. The Committee reviewed correspondence from Ruekert & Mielke dated March 7, 1997, indicating that the plans show an armored spillway connection between the existing detention basin and the wetland, a bulkhead of the 24 inch CMP pond outlet and a riprap swale from the end of the storm sewer outlet on Lot 35 into the existing detention pond which address the issues raised in their previous letters. Ald. Pionek moved to recommend approval of final plat for Lakewood Meadows Addn. #2 with inclusion of the above. Seconded by Ald. D'Acquisto, motion carried 2-O. There was nothing new to report on the status of Little Muskego Lake drawdown. Ald. Pionek moved to adjourn at 7:12 P.M. Seconded by Ald. D'Acquisto, motion carried 2-O. Respectfully submitted, /ca Cathie M. Anderson Transcribing Secretary