Public Works Committee - MINUTES - 1/26/1995PUBLIC WORKS COMMITTEE - CITY OF MUSKEGO MINUTES OF MEETING HELD THURSDAY, JANUARY 26, 1995 The meeting was called to order at 7:35 P.M. by Chairman Dumke. Also present were Committee members D'Acquisto and Misko (arrived at 7:45 P.M.), Mayor De Angelis, Public Works Superintendent John Loughney, Mike Campbell (Ruekert & Mielke) and those per the attached list. The Committee noted that the meeting notice was posted on l/23/95 and amended notice was posted on l/25/95 in accordance with the Open Meeting Law. There was nothing new to discuss on Urban/Rural Drainage. The Status of Terra Development projects was removed from the agenda and will not be a standard item in the future. Mr. & Mrs. Doug Hintz appeared before the Committee to discuss drainage ditch on Bay Lane. City Engineer Mike Campbell described the deviation of drainage ditch from easement area. Ald. Misko spoke on behalf of the Thompson property and stated that the Thompsons have complied with city policies regarding the removal of debris, wood chips, etc. After further discussion it was decided that Ald. Misko and Ald. Woodard will attempt to arrange a meeting between the two parties to arrive at a solution. The Committee further discussed the Anderson drainage problem on Woods Road and, due to technical problems encountered, this issue is unresolved. Further research to be done. The Committee reviewed a memorandum from Stan Sugden (Ruekert & Mielke) on the status of the Little Muskego Lake Dam Retrofit Project. As of January 26, 1995, the Contractor has completed construction of the dam structure, steel sheet piling installation and rip rap installation along the spillway channel at approximately $3,500.00 under budget. Complaints as to damage to basement walls is under review. City Engineer Mike Campbell reviewed the Floodplain maps from dam failure for the new dam. There was nothing new to discuss on drainage concern in Industrial Park from Plum Creek East as Mr. Carity has not advised the City as to his meeting with Mr. Santi. There was nothing new to discuss on turn lane on CTH L & Lannon Drive. The Committee discussed status of Moorland Road-North Extension and Supt. Loughney advised that he is currently evaluating engineering proposals. The Committee reviewed request received from Miller Engineers Scientists, dated December 14, 1994, regarding a request to discharge treated ground water to storm sewer (former Benco Service Station). Mayor De Angelis stated that he had contacted the company and advised that the City would review the request after they had received a WPDES permit from the DNR. supt. Loughney advised that he has since received a copy of Miller Engineers Scientists application for the WPDES permit. PUBLIC WORKS COMMITTEE - PAGE 2 JANUARY 26, 1995 The Committee reviewed item referred .from the Plan Department regarding location of sump pump discharge (S83 W19407 Apollo Drive - Plum Creek East). The apartment was approved to be built with a basement, but storm sewer is at least 250' away creating an undue hardship. Ald. D'Acquisto moved to approve a temporary discharge permit. Seconded by Ald. Misko, motion carried. Additional research will be done as to this issue and further reviewed at the February meeting. Mrs. Beth Lindberg appeared before the Committee to discuss proposed Moorland Road-South Extension as it relates to Candlewood Creek Subdivision and presented the Committee with new wetland delineation. Ald. D'Acquisto moved to direct the City Engineers to examine the new information and access viability on Routes Cl, C2, and C3, and also to discuss with City Planner. Seconded by Ald. Misko, motion carried. This will be further discussed at the February meeting. supt. Loughney reviewed with the Committee correspondence from the Wisconsin Department of Transportation regarding the State's Requirement for a Pavement Management System. No action was taken at this time. Mr. Boris Sodos and Roman Berendt appeared before the Committee to discuss plans submitted on intersection detail for Champions Drive & Loomis Road and Champions Drive 6 North Cape Road submitted on January 18, 1995. The Committee reviewed memorandum from City Engineer Ken Ward dated January 26, 1995, regarding recent conversations with applicants regarding submittal. It was agreed that CCV will provide emergency storm drainage easement for review by the City Attorney in response to concerns expressed by the Committee regarding open ditch adjacent to the golf course. supt. Loughney pointed out the continuing request that there be no open ditch and instead a storm sewer in this area. Ald. D'Acquisto moved that the area in question must be storm sewered. Seconded by Ald. Misko, motion carried. The committee also reviewed correspondence from Wisconsin Department of Transportation, dated January 9, 1995, agreeing that the DOT will construct a median opening on STH 36 and the Loomis Drive intersection to accommodate the initial 24 foot wide street as part of the scheduled 1997-1998 reconstruction project. When the boulevard is constructed, CCV will have to apply for a permit to reconstruct the median opening and the Loomis Drive intersection in accordance with DOT plans and specifications, at CCV's expense (letter attached). Requirements for boulevard entrance were discussed and to be further reviewed at the February meeting along with final changes to grading plan. The Committee reviewed Agenten CSM for Skylark Lane along with memorandum from City Engineers regarding submittal, dated January 18, 1995. Several issues need to be addressed and resubmittal at a future meeting. PUBLIC WORKS COMMI!l'TEE - PAGE 3 JANUARY 26, 1995 Under Communications And Any Other Business As Authorized By Law, Mayor De Angelis advised the Committee of a meeting held with Gary Evans of Waukesha Department of Transportation regarding access dispute on Racine Avenue for Parkside Inn (W191 57690 Racine Avenue) and he indicated an early June start date. The meeting adjourned at lo:50 P.M. Respectfully submitted, /ca Ald. Demonic R. D'Acquisto Secretary r FROt4 : KRAUSEiGOLF COIiSULTANTS PHONE li3. : 47 352 2461 PO2 Wisconsin Department of Tranoportetlon Scott Krause MumkeOa Lakes Country Club $100 Y14020 Loomis Rd Uuskogo YI 53150 Dear Hr. Krause: - -- SUBJECT: 1.0. 2240-07-01 CTH G to STH 100 STH 36 Uaukesha and Milwaukee Counties This correspondence confirms our agreement reached during a meeting on December 23, 1994. UC discussed your street opening ontn STH 36 from the proposed Champions Village subdivision. A 24 foot wide street with curb and gutter Is proposed initially for the subdivision street. Ulttmately, this will be expanded to a boulevard. functton as the northbound street. The existing street would remain in place to A 24 foot wide southbound street would ba added, separated by a boulevard. It will be your responsibility to connect Mr. Kraemer's access to your faclllty, both init,ially and ultlmately. It was agreed that WlsDOT will construct a madian apenlng on STH 36 and the Loomis Drive intersection to acconssodate the Initial 24 foot wide street as part of the scheduled 1997-1998 reconstructjon project. When tho boulovord is constructed, you will apply for a permit from WisUUl to reconsWuct the median opening and the Loomls Drive Intersection In accordance with our plans and rpecificrtions. Reconstruction of the median opening and interroction will be at your expense. If you have any questlons, please call me at (did) 5484.664 or Ron Cech at (414) 521-5335. Sincerely, Donald R. Gilbertton Project Manager DRG:pb743 I