Loading...
Public Works Committee - MINUTES - 4/28/1994‘0 PUBLIC WORKS COMMITTEE - CITY OF NUSKEGG MINUTES OF MEETING HELD APRIL 28, 1994 The meeting was called to order at 7:00 P.M. by Chairman Dumke. Also present were Committee Member D'Acquisto, Mayor De Angelis, Ald. Sanders, Public Works Superintendent John Loughney, Michael Campbell (Ruekert & Mielke) and those per the attached list. Mr. Al Wil and Mr. Kalvin Klimeck appeared before the Committee to discuss status of Lake Forest and Plum Creek Developments. 0 Mr. Wayne Salentine and Mr. Doug Eiche appeared before the Committee to discuss Parkland South drainage. City Engineer Mike Campbell advised that the estimated cost for a revised Storm Drainage Study for the SW l/4 of Section 10 is $3,200.00. Ald. D'Acquisto moved to direct the City Engineers to revise the Storm Drainage Study for the SW l/4 of Section 10 at a cost not to exceed $3,200.00 with the understanding that Mr. Doug Eiche has agreed to pay the same proportionate share of the study as was paid for the original study. Seconded by Ald. Dumke, motion carried. The Committee has agreed to the new study because of recent changes to DNR rules regarding wetlands. Mayor De Angelis agreed to schedule a meeting with Mr. Salentine and Parks Director Peter Theis to discuss possible alternatives such as land swaps, etc. supt. Loughney updated the Committee on the request for installation of catch basin and culvert for St. Francis Savings & Loan and noted that all plans have been approved. The Committee further discussed storm sewering on Woods Road for Mr. Richard Anderson. City Engineer Michael Campbell reviewed two alternatives. The Committee deferred action to the May meeting in order to have Mr. Anderson in attendance. Mr. Greg Gabor, SE3 W17323 Woods Road, appeared before the Committee for further discussion on drainage concerns on his property. After lengthy discussion, the Committee directed supt. Loughney to shoot grades on the roadside ditch leading to the creek and the results will be reviewed at the May meeting. There was nothing to report on the proposed turn lane for Lannon Drive. Mr. Greg Boehm and Pam Boehm appeared before the Committee to discuss condition of curbs and to review ditch on Lannon Drive in the Meadow Green West Subdivision. supt. Loughney noted that the curbs are pitted and unacceptable. Mr. Boehm agreed 0 to repair the curbs, but will not replace. Mr. Boehm also agreed to reshape, seed and sod the ditch on Lannon Drive. City Engineer Michael Campbell reviewed with the Committee auxiliary storm sewer installation for the Belsha property. Ruekert & Mielke and Supt. Loughney will inspect and report back to the May meeting. Subdivider exhibits for Champions Village were removed by the Developer. Mayor De Angelis advised the Committee that plans for the Little Muskego Lake Dam will be forthcoming. The meeting adjourned at 1O:lO P.M. Respectfully submitted, Ald. Demonic D'Acquisto Secretary /cma -.-. .--.-._ ______--