Loading...
Public Works Committee - MINUTES - 5/29/1991PUBLIC WORKS COMMITTEE - CITY OF MUSKEGO MINUTES OF MEETING HELD WEDNESDAY, MAY 29, 1991 The meeting was called to order at 7:00 P.M. by Acting Chairman David Taube. Also present were Committee Member Simmons and Superintendent John Loughney. The Committee discussed storm drainage proposed project in the Southwest l/4 of Section 10 (Woods Road/Bay Lane). Mayor Salentine is meeting with Mr. Eiche, one of the affected property owners. The Committee further reviewed drainage concern - M & W Marine. Mayor Salentine and Supt. Loughney are meeting with representatives from M & W. The City is awaiting word on the grant application for the Little Muskego Lake Dam project. The contractors will begin construction of Schultz Lane Road project on July 1, 1991. The City is awaiting final plans from the City Engineers on the expansion of the Public Works garage. The two affected property owners in the Marlan Meadows Drainage Project have been sent the required easement documents for their signatures. supt. Loughney is working to remedy the drainage concern for Mr. Harenda on Lentini Drive. supt. Loughney is working with Mr. Deifkuss to determine if the tile pipe on his property is in working condition because of the drainage problem in Golden County Estates Subdivision. Supt. Loughney reported that the drainage tile on Lions Park Drive is working up to its capacity. The tile has been cleaned out by the Public Works Department. The Committee reviewed status of silt trap on Richdorf and Racine Avenue. supt. Loughney was directed to contact the City Engineers to determine engineer costs for a drainage study in this area. The Committee reviewed site grading plans for Lakeridge Apartments with Developer Dan Barker. Mr. Barker advised that a retaining wall will be installed on the south line of the property. Garages will be at two different elevations and there will be an additional lane on the east side of Lannon Drive to Hwy. L. Public Works Committee - Page 2 May 29, 1991 Representatives from Terra Development (Lake Forest Subdivision) appeared before the Committee to discuss site grading, drainage and road plans for Phase 2 and Phase 3 of Lake Forest Development. The Developer is proposing to install a concrete entrance way into the Subdivision which would look like brick. supt. Loughney will research and report back to the Developer and the Committee. The Committee discussed with Mr. Patch required changes to his drainage plans affecting sedimentation basins. Mr. Patch will make changes and submit amended plans to Supt. Loughney. supt. Loughney requested that Mr. Patch install a roadway to service the catch basins. Mr. Patch was requested to advise all of his contractors to strictly enforce the City's soil erosion practices and the Committee requests that the Building Inspector review. The Developer is reviewing grading elevations in Phase I to determine whether they will be affected by Phase II and Phase III. The Committee noted that Mr. Patch agreed to install the stand pipe which had not yet been installed on May 30, 1991. The meeting adjourned at 11:lO P.M. Respectfully submitted, Ald. William T. Simmons Secretary ca