Public Works Committee - MINUTES - 12/18/1986PUBLIC WORKS COMMITTEE - CITY OF MUSKEGO
MINUTES OF MEETING HELD DECEMBER 18, 1986
The meeting was called to order at 7:05 P.M. by Chairman
DeAngelis. Also present were Committee Members Hilt, Supt.
Bertram and those per the attached list. Ald. Sanders was
absent.
Further discussion of the drainage plans for Durhamswood
Subdivision was held with Stan Potrykus and Bob Klenz. The final
grade map of the project determined that concrete inverts will not be necessary from Settler Way to Indian Trail, but will be
installed, as necessary, from Freedom Drive east on Settlers
Way. All sump pumps will flow to the rear of the properties
unless otherwise specified and the drainage plans will be amended
to define the swale to the north.
Mrs. Arline Kopshe appeared before the Committee to request that
the drainage ditch in the Glenbrook Subdivision be filled. The
Chairman of the Committee informed Mrs. Kopshe that the drainage
ditch cannot be filled and recommended that Supt. Bertram talk to
Mr. Washburn (W149 S6550 Spring Drive) and Mr. Hetzel (W149 S6580
Spring Drive) and attempt to acquire easements to clean the
entire ditch. Supt. Bertram is to report back to the February
meeting.
0
The Committee reviewed the following quotes received for the sale
of top soil in the Industrial Park:
Fredricks Soil Co., Inc. 35 per yard
Western Landscape Con. 25 per yard t
The Committee recommended to Finance Committee rejection of all
quotes.
The Committee reviewed drainage and road plans for Meadow Green
Subdivision with Mr. Gregory Boehm. Supt. Bertram will review
the drainage map with the engineers and report back to the
Committee.
The Committee reviewed TIF projects and Chairman DeAngelis moved
to have a railing installed on the north side of Woods Road near
the Switala ditch. Seconded by Ald. Hilt, motion carried. supt.
Bertram will determine cost of railing and report at next
meeting.
The Committee continued review of the Urban Drainage policy.
The Committee discussed correspondence from New Berlin dated
December 2, 1986, stating that SEWRPC suggests that other
communities might be interested in joining with New Berlin to
prepare stormwater management plans so as to result in a complete
plan for the entire watershed. supt. Bertram will contact New
Berlin and report back to the Committee.
Public Works Committee - Page 2
December 18, 1986
A request for release of funds for the Marlan Meadows Subdivision
was discussed. The Committee agreed to release $36,573.00 and to retain $4,927.00 for final restoration of the retention pond and
minor road surfacing.
The Committee reviewed correspondence from the City Engineers regarding the Industrial Park Street Construction Project. The Engineers are notifying the contractor, Payne & Dolan, Inc., that
there remains one abrupt joint in the Mercury Drive pavement just south of Gemini Drive. This area was not wedged when the
sanitary sewer manholes were wedged earlier this Fall. The engineers are requesting that this area be wedged before more snow plowing is done.
The meeting adjourned at 9:09 P.M.
Respectfully submitted,
Ald. Daniel Hilt