Loading...
Public Works Committee - MINUTES - 4/18/1985PUBLIC WORKS COMMITTEE - CITY OF MUSKEGO MINUTES OF MEETING HELD APRIL 18, 1985 The meeting was called to order by Chairman DeAngelis at 8:00 P.M. Also present were Committee Members Hilt and Tomczyk, Mayor Salentine, Supt. Bertram and those persons per the attached list. The Committee discussed the Resurfacing of Bass Bay main roads. Chairman DeAngelis read communications from City Engineers dated April 12, 1985 recommending the thickness to be 2 inches to 4 inches with a cost of $10.00 per front foot, plus the cost of concrete invert. The Committee made the decision that there will be no concrete inverts. The drainage will be accomplished using a tile to provide storm drainage. It was explained that there would be a one time assessment. Ald. Hilt moved to recommend to Council to direct the City Engineer to prepare plans and specifications for the resurfacing of Bay Lane Place. Seconded by Ald. Tomczyk, motion carried. The Kurtze Lane road project was discussed and the input from residents indicated that a rural type drainage system without curb and gutter would be their recommendation. Ald. Hilt moved to recommend to Council to direct the City Engineer to prepare plans and specifications for the construction and resurfacing of Kurtze Lane. Seconded by Ald. Tomczyk, motion carried. The Committee reviewed the following TIF projects with Seegar Swanson: : The Committee discussed the drainage project for the area from Highway 24 to Tess Corners bridge. Ald. Hilt moved to direct City Attorney Molter to prepare the necessary documents to secure the easements and the City Engineers to prepare plans and specifications. Seconded by Ald. Tomczyk, motion carried. The Committee discussed the Gaulke Drive Drainage Project. Superintendent Bertram was requested to determine the status of this project. The Committee informed Seegar Swanson of their intention to resurface Kelsey Drive from Racine Avenue to Crowbar Road. The Committee discussed the Industrial Park ditches and grading. Supt. Bertram explained that in order to start the project, 2700 feet of concrete inverts in the west cul de sac should be installed at a cost of $55,000. Ald. Hilt moved to recommend approval of concrete invert work. Seconded by Ald. Tomczyk, motion carried. The Committee discussed the ditch along the Industrial Park. The Committee recommended the cleaning of the ditch from Mercury Drive to Racine Avenue as part of the Industrial Park Development 8 Project. Public Works Minutes - Page 2 April 18, 1985 The Committee discussed the detention pond in the Industrial Park. The Committee recommended to include the detention pond costs as part of the Industrial Park Development Project. The Committee discussed Aud Mar Estates with Developer Stan Potrykus. The Committee voiced concern as to whether curb and gutters should be installed. After review of the construction plan and Ruekert & Mielke's letter dated April 16, 1985, the Committee decided the curb and gutters were not necessary. Ald. Tomczyk moved to recommend Council approval of the plat for 13 homes with the understanding that any future construction would have to be reviewed by the Committee. Seconded by Ald. Hilt, motion carried. The Committee reviewed the minutes of the previous meeting. Mr. Randy Kusch appeared before the Committee stating that he was having a water problem on his property. The Committee recommended that he pump the water into the storm sewer in his backyard. Mr. Kusch was informed that he is to notify Superintendent Bertram to set up an inspection on the connection. The meeting adjourned at lo:30 P.M. Respectfully submitted, ca Ald. Ralph Tomczyk Secretary I _’ -. -.-... -~ ~. _ --..- /’ , ._ ._- -~-- - ,;- ___ - -. . cz _ __ _ _ - - . . . ----- / __.__ ~& ---. - - __~.. -