COMMITTEE OF THE WHOLE - MINUTES - 9/13/2007 COMMITTEE OF THE WHOLE – CITY OF MUSKEGO Approved 9/20/07 MINUTES OF MEETING HELD SEPTEMBER 13, 2007 Mayor Johnson called the meeting to order at 6:33 p.m. and led those present in the Pledge of Allegiance. ROLL CALL Present: Mayor Johnson, Ald. Snead, Pavelko, Borgman, Werner, Schaefer, and Fiedler. Ald. Melcher arrived at 7:25 PM. Department Heads/Other Staff present: Finance Department Supervisor Mueller, Assessor Mecha, Police Chief Geiszler, Parks and Recreation Director Anderson, Plan Director Muenkel and GIS Coordinator Wisniewski, IS Director Sommers, City Engineer White, Public Works Superintendent Delikat, Public Utilities Superintendent Kloskowski and Deputy Clerk Blenski. Also present: Tess Corners Volunteer Fire Department: Jeff Verburgt, Muskego Volunteer Fire Company: Andy Mack and Mike Kersky. STATEMENT OF PUBLIC NOTICE The Deputy Clerk stated that the meeting was noticed in accordance with the open meeting law. NEW BUSINESS Presentation and Review of Proposed 2008 Capital Budget Items Mayor Johnson commended City Administrator Sheiffer and Finance Department Supervisor Mueller for their work preparing and organizing all of the budget documents. The Committee determined that it would review all the capital expenditure requests prior to making any decisions on specific items. Ms. Mueller reviewed a draft summary of the 2008 capital expenditure requests and funding sources as attached. She stated that future capital requests for 2009 through 2012 will be discussed at a later date if the Council proceeds to adopt a five-year capital plan. The City’s first capital plan was adopted in 2002 and later revised to include the years 2003 through 2007. Ms. Mueller noted that the items to be funded by Capital Borrowing total $1,944,160 with $1,136,310 available. An additional $807,850 would have to be borrowed or funded from other sources if all of those items are approved. Mayor Johnson reviewed the City’s existing Purchasing Policy, which requires that budgeted items over $25,000 be reviewed and approved by the Finance Committee and Common Council. The City Administrator alone can approve budgeted items between $15,000 and $25,000. Committee of the Whole Page 2 September 13, 2007 The following Department Heads presented their requests: ASSESSOR Project/Item Cost Comment Replacement Copier $5,000  Replacement of existing equipment that is 10 years old. POLICE DEPARTMENT Project/Item Cost Comment Vehicle Replacement $76,291  Agreeable to Mayor’s request that $24,000 be removed for one vehicle. Uninterrupted Power Source (UPS) $10,000  Could be postponed to 2009. Seven Radar Units $15,000  Replacement of existing equipment that is 7 years old.  Department’s main concern for 2008. Impound Storage Building - will be $120,000  Both Dept. Heads agree to done in conjunction with DPW postpone to 2009. CABLE TV (Presented by Craig Anderson) Project/Item Cost Comment Two Studio Cameras $10,000  Replacement of old, existing equipment.  Was in last 5-Year Plan and moved several times.  Only request for next 5 years. PLAN DEPARTMENT Project/Item Cost Comment Planning/GIS Server Replacement $8,500  Current server is 6 years old and in disrepair and not being used.  Replacement critical to department applications.  Other City servers on 6-year replacement schedule. Truck Replacement (for $12,000  Replacement of 1989 vehicle in Conservation) degraded condition. Global Positioning System (GPS) $8,400  Will be utilized by several other departments as noted by the Public Works and Public Utilities Superintendents present.  Support also expressed by City Engineer and Jeff Verburgt of TCVFD. Committee of the Whole Page 3 September 13, 2007 Janesville Road Reconstruction $54,000  Funding committed in 2008 for consultant (PDI) to do streetscape design.  $50,000 needed in 2009 for streetscape construction plans.  $4,000,000 preliminary estimate for 2009 for burying utilities. Mayor Johnson noted that funding sources would be reviewed for the $4,050,000 that may be needed for 2009. He prefers that the City not borrow the entire amount needed. INFORMATION SYSTEMS Project/Item Cost Comment Server Replacement $23,579  Industry standard for replacement is 3-5 years.  Servers to be replaced (Internet, Building, and Recreation) are older than industry standard.  Recreation server could be postponed to 2009. Firewall Replacement $6.941  Will no longer get updates or support in 2008.  Have experienced problems with existing firewalls. Switch Replacement $11,500  Completion of project began in 2006. Public Works, Library and City Hall lower level to be done in 2008. Website Upgrade $29,525  Complete overhaul of current website developed in 1996.  New website will be easier to use, navigate, update and grow with new technology.  Mayor requested.  Priority item recommended by study that was done. CITY ENGINEER Project/Item Cost Comment 2008 Road Program $585,000  Budget amount same as in 2007  Roads included in 2008 program: Martin, Lentini, College, Ryan, Bluhm and Restful  Future asphalt costs unknown. Budgeted amount includes funds for cost increase and contingencies. Committee of the Whole Page 4 September 13, 2007 DEPARTMENT OF PUBLIC WORKS Project/Item Cost Comment Urban and Rural Drainage $60,000  $10,000 in Operating and $50,000 in Stormwater Funds Vehicle Replacement (Plow Truck) $128,400  Mayor recommends removal.  Dept. Head noted that if truck not replaced in 2008, it would be needed in 2009.  Maintenance costs may increase if replacement of truck is moved to 2009. Mini Excavator $25,000 - ½ total  Equipment will be shared by cost DPW and Utilities. Roadside Mower $65,000  Replacement of 1995 mower to cut roadside grass. STORMWATER PROJECTS (Presented by City Engineer White) Project/Item Cost Comment Tess Corners Creek Channel $200,000  Engineering started. Plans to be done by year end.  Construction cost is an estimate; scope of work not known. Dry Basin Retrofit Industrial Park $340,000  Feasibility of detention pond in the Industrial Park being reviewed by Ruekert & Mielke  2008 amount for detail design and land acquisition only.  Estimated construction cost- $1,000,000.  Mayor has concern if the value of any proposed Industrial Park expansion will warrant doing the project.  Part of Ruekert & Mielke’s research is to determine funding alternatives. Pilak Creek Drainage - North of $40,000  Cost is an estimate for Woods Road stabilization work. NR216 Compliance $110,000  Compliance/modeling and permit work for the MS4 NR216 permit. PARKS AND RECREATION Project/Item Cost Comment Kubota Tractor Winter Package $11,594  Equipment will allow current Kubota to be used in winter and provide a second means for snow removal. Committee of the Whole Page 5 September 13, 2007 PARK DEDICATION (Presented by Craig Anderson) Project/Item Cost Comment Park Arthur $30,000  Design, engineering, permitting. Town Hall $23,500  Landscaping and window and front door replacement. Moorland Park $19,600  Electricity, water fountain, camera  Parks & Recreation Board reviewing future of skateboard park. Horn Field $18,000  Baseball field restoration  Cost sharing with field users anticipated. Idle Isle $3,000  Curb for beach. Trails $31,410  Trail construction along Hwy. 36.  Quietwood connector trail to Janesville Road. Kurth Park $5,000  Grade, seed, mulch, plantings.  DPW to do work.  Was on list for past 3 to 4 years. UTILITIES Superintendent Klowskowski noted that the capital items/projects for the utilities are not funded by tax dollars; they are supported by the water and sewer utilities. Project/Item Cost Comment Water Utility - Meters $100,000  Same amount budgeted every year for new meters and replacements.  Funds budgeted in 2007 will not be used. Water Utility - Truck Replacement $37,500 ½ total  Replacement of confined space cost truck, which is required.  Existing equipment not reliable Water Utility - Lakewood Meadows $150,000  Well conversion to municipal Conversion water.  Funds needed in 2008 dependent on future development. Water Utility - Pumping Station and $2,400,000  Larger station needed Reservoir - Well #13  Iron levels require filtration, which increased cost substantially Water Utility - Elevated Storage $500,000  Waiting for future development on (Moorland Road) Moorland Road.  May be eligible for TIF  Will not be done in 2008. Water Utility - Mini Excavator $12,500 - ¼ total  Equipment will be shared by cost DPW and Utilities. Committee of the Whole Page 6 September 13, 2007 Sewer Utility - Truck Replacement $37,500 ½ total  Replacement of confined space cost truck. $20,000  Sewer camera truck upgrade to utilize DVDs and use GIS system. Sewer Utility - Oversizing Land $40,000  Belle Chasse Purchase Sewer Utility - Rain Gauges and $103,500  State and MMSD requesting. Flow Monitors  MMSD may pay for. Sewer Utility - Mini Excavator $12,500 ¼ total  Equipment will be shared by cost DPW and Utilities. TESS CORNERS VOLUNTEER FIRE DEPARTMENT (Presented by Jeff Verburgt) Project/Item Cost Comment SCBA Upgrade $182,000  Upgrade the department’s existing units, which will be 12 years old.  New standards require replacement. Arial Quint $621,160  Will be needed for expansion of Moorland Road corridor as building heights exceed 2 stories  Truck would compliment existing equipment of both departments.  Mayor noted the fire study recommended that TCVFD give a pumper to MVFC and asked for a response from Mr. Verburgt, which was no. Mr. Verburgt stated that the recommendation would be a temporary fix and not meet the needs of either department. 911 Dispatch Center $185,000  Mayor believes this is a priority Hardware/Software (Both for 2008. Departments) Committee of the Whole Page 7 September 13, 2007 MUSKEGO VOLUNTEER FIRE COMPANY (Presented by Andy Mack) Project/Item Cost Comment Pumper Replacement $362,000  Obtained 3 bids. Marion is preference.  Would become a front-line engine. Freightliner would become a backup engine.  Currently there is no backup pumper.  Out of the three requests, this one is priority. Replace Roof - Station #1 $70,000  Could be moved to 2009. Tanker 1293 Replacement $350,000  Could potentially be moved to 2009. The fire department representatives clarified that Muskego has two pumpers and Tess Corners has two pumpers with two that are backup and not used often because they are manual. ADJOURNMENT Ald. Snead moved to adjourn at 9:40 PM. Seconded by Ald. Fiedler, motion carried. Jill Blenski, CMC Deputy Clerk