COMMITTEE OF THE WHOLE - MINUTES - 9/5/2002
COMMITTEE OF THE WHOLE – CITY OF MUSKEGO Approved
MINUTES OF MEETING HELD SEPTEMBER 5, 2002
Mayor Slocomb called the meeting to order at 7:11 PM. Also present were Ald. Petfalski, Damaske,
Madden, Patterson, Salentine, Finance Director Gunderson, Conservation Coordinator Tom Zagar,
Building & Engineering Director Sean McMullen, Public Works Director Wayne Delikat and those per the
attached list. Ald. Le Doux and Sanders were absent.
All in attendance recited the Pledge of Allegiance.
Mayor Slocomb noted the meeting was noticed in accordance with the Open Meeting Law.
Minutes of the August 22, 2002 Committee of the Whole meeting were not available for approval.
Unfinished Business – 2003 Capital Budget
Finance Director reviewed with the committee the detail being presented
1. Engineering/Parks & Recreation
Janesville Recreation Trail – This item was placed back on the agenda for questions to be
directed to the Building/Engineering Director. The logic for the two different sized paths is to save
as many buildings as possible along the Tess Corners area and to place a five foot path along
one side of the street and a 10 foot path along the other. A question was raised about possible
funding for the project. Mr. McMullen explained that the only funding that was possibly available
was not feasible for this project. The cost of this project is $279,300.
2. Planning
Lake Water Quality Monitoring – Conservation Coordinator Tom Zagar was present to review the
request for Lake Water Quality Monitoring equipment. Mr. Zagar is asking for the purchase of a
hydro lab for water quality monitoring on the lakes, which was previously done by USGS. USGS
has been doing this testing since 1988. The cost will be $31,185. This would amount to more if
Lake Denoon was added to the testing. This year we will no longer be getting any assistance
from the DNR. Previously this funding was 70% of the City’s 60% share. The cost for the City to
purchase this equipment would be $9,475. Mr. Zagar is recommending that the City conduct the
in-lake monitoring and periodic event sampling at outlet and continue using USGS for operating
the gauging station. The cost to the City would be $15,760 out of the Priority Lakes Fund.
New Business - 2003 Capital Budget
Finance Director reviewed with the committee the detail being presented.
1. Engineering/Building Department – Building/Engineering Director Sean McMullen was present to
answer any questions regarding the capital requests.
a. Vehicle Replacement – The department is requesting to replace 3 leased trucks with 4 new
pick-up trucks. The current vehicle leases are up in November and they have a $11,500 buyout.
The requested $76,127 will purchase 3 – 2003 trucks at $17,661.86 each, 1 – 2003 4x4 truck at
$20,777.77, 3 bed liners and tool carriers at $755 each and 1 bed cover at $600. The department
will begin staggering the replacement of vehicles in two years and a vehicle a year after that.
b. Signal Upgrades – The department is requesting $88,000 for a signal upgrade and
installation of 3M Optical Signal prompters for nine existing signalized intersections. This
includes all hardware, agreements, wiring, installation and enumerators. This will allow for the
emergency fire trucks to trigger the signal lights. There will be a cost to the Fire Departments to
put remitters on the Fire Trucks. The Request is for the full amount, but Waukesha County will
bid on the project and hope for a $20,000 to $25,000 savings.
2. Storm Water Management Fund
a. Tess Corners (N of College) – The City is working with the City of New Berlin on a storm
water retention project on Tess Corners north of College Ave. The anticipated cost to the City is
$1,200,000. The City is anticipating the receipt of some grant funds to help defray the costs.
b. North of Kelsey – The Public Works committee last Monday changed their priority for North of
Kelsey. This project did not receive any DNR grant money. The Freedom Square Pond did
Committee of the Whole Page 2
Minutes of Meeting Held 9/05/02
receive some grant funding, however we don’t know the extent of this funding. It could be
between $125,000 to $950,000 for an estimated project cost of $1.21 million. The requested
funds for North of Kelsey is $25,000 in design costs for 2003 and $225,000 in 2004, however the
project could be delayed until 2006 awaiting potential funding from the DNR. The engineering
costs can remain in the budget for 2003.
3. Public Works – Building/Engineering Director Sean McMullen and Public Works Director Wayne
Delikat were present to discuss the requests for the Public Works Department.
a. Road Program – removed from agenda and will be discussed with the operating budget.
b. Vehicle Replacement Patrol Trucks – Removed from agenda and will be discussed with the
operating budget.
c. Urban and Rural Drainage – Removed from agenda and will be discussed with the operating
budget.
d. Cruz-Aire – The department is requesting $170,000 to replace a 1994 piece of equipment
with 6,000 hours used for ditching and drain tile ditching. Average life of this equipment is 5,000
hours. The present equipment has an estimated trade-in value of $25,000.
e. Replace Truck 1 – The department is requesting $25,000 to replace a 1990 ½ pick-up truck
with 130,000 miles. The replacement will be a 4-wheel drive with a 5.3 liter low emissions. The
used vehicle will be passed down the ranks.
f. Replace Truck 3 – The department is requesting $45,000 to replace a 1989 1-ton truck with
129,000 miles. The replacement will be a diesel 4 – wheel drive truck with an 8-foot bed. The
used vehicle will be auctioned off.
g. Topsoil Screener – The department is requesting $78,000 to replace a 1968 topsoil
screener/shredder that was purchased used in 1980. The replacement will be a 55-horse power
kabota diesel screener. The screener will handle 100-150 cubic yards of topsoil per hour.
h. Moorland Road – In 2002 funds in the Moorland Road project were used to fund design of the
bridge rehab. These funds would go back into the Moorland Road fund.
i. Lift Hoist Replacement – The department is requesting $100,000 lowered from the original
estimate of $145,000 for replacement of a failing lift system used for vehicle maintenance. The
costs include removal of the existing hoist and pump system. The original was put into service
and used between 1972 and 1988 it was rehabilitated in 1989.
j. Muskego Dam Bridge Replacement – The department is requesting $342,000 for
replacement of existing bridge over Muskego Canal south of the Big Muskego Lake Dam. The
City has three choices, close the bridge, restrict the limit to 1 ton or repair the bridge. This
requirement for action is coming from the State D.O.T.
k. Jewel Crest Bridge Replacement – The department is requesting $380,000 for replacement
of the existing Jewel Crest Bridge. The choices for this bridge are: replacement, weight
restriction or closing. The requirement for action is coming from the State.
l. Phase II Durham Reconstruction – The request for funds for the Durham Drive
Reconstruction Phase II, which will run from 800 feet south of McShane to North Cape is
$3,856,470. This includes funds for storm water, engineering, land acquisition and construction.
Sean McMullen discussed moving some of this financing to future years.
The Committee took a break at 9:00 pm and reconvened at 9:13 pm.
4. Fire Department – Tess Corners – Dave Van Zeeland, Jeff Verburt, Phil Dibbs, and Carl Wojnowski
were present to represent the Tess Corners Fire Department and discuss their capital budget requests.
Committee of the Whole Page 3
Minutes of Meeting Held 9/05/02
a. Fire Helmet Replacement – The department is requesting $15,000 to replace approximately
60 fire helmets. Most of the helmets were purchased in the early 1980’s and do not meet current
performance specified by NFPS standards. These helmets include the passport ID, shield and
goggles. Question was raised about replacing some now and the rest later, but it was determined
that for safety reasons it was better to meet the required standards.
b. Breathing Tanks 4 of 4 – The department is requesting $13,000 for the final phase of
replacing the breathing tanks which are filled with air that allow the fire fighters to breathe with
their SCBAs. These tanks are replacing tanks that were purchased several years ago and are no
longer supported by NFPA (National Fire Protection Association). 15 tanks will be replaced.
c. 800 MHz Radio Equipment – The department is requesting $163,000 to replace the
remaining 800 MHz radio equipment. Last year this was presented in two phases for
replacement. This will purchase approximately 65 portables and 40 mobiles. The purchase is
contingent upon the fixing of the system. Motorola will be providing a discount with all the radios
purchased at one time.
5. Fire Department – Muskego – Jim Gaffney, Kevin Sievert, Domonic D’Acquisto, John Ludwig, Andy
Mack and Edwin Schaefer were present to discuss the capital request for the Muskego Volunteer Fire
Department.
st
a. 1 Responder in Station Training and Supplies – The department is requesting $36,000 to
bring most, if not all, members up to a first responder skill level. The funds will provide for
training, the purchase Defib units for both fire stations, training equipment for training, medical
equipment and projector and computer.
b. 800 MHz Radios – The department is requesting $52,000 for 20 800 MHz radios. This will
allow for the compatibility with the City program and TCVF. The costs include programming and
port mics and will provide for the balance of the portables in the trucks.
6. Mayor
New Maintenance Van – The Mayor asked that this item be moved to the next agenda because
he was unable to review the information with the maintenance personnel.
Communications and Miscellaneous Business as Authorized by Law - None
Adjournment
Ald. Petfalski moved to adjourn at 10:10 PM. Ald. Madden seconded; motion carried.
Respectfully submitted,
Dawn R. Gunderson, CPFO
Finance Director