Discussion on Moorland Road Corridor-Janesville to McShane
Sean McMullen reported final plans will be in his office tomorrow. Bid opening will be
th
held March 28. The attorney for Jewel Osco will have the contracts back to Waukesha
th
County by next week. We should be ready to go by the April 11 project start date.
New Berlin Drainage and Storm Water Issues
Sean stated he attended a meeting with the DNR regarding potential reallocation of
previously funded grants. Muskego will be able to retain the $914,000 grant, and may
qualify for an additional $160,000. New Berlin lost their $35,000 grant. Sean stated he
will also apply for two non-point grants for an additional $400,000 on a reimbursable
basis for the 2003-04 budget year.
Discussion on Durham Drive – McShane to OO
Sean advised that at the November COW meeting he was asked to look at the different
alternatives for the section between Hi View Drive and station 100. He distributed a
cross section going from a rural to an urban section with curb and gutter and explained
that proposal was estimated at $1,010,550, compared to the existing section estimated
at $562,501. Ald. Sanders expressed concern about spending $1 million for this section
of road and downgrading it from 40 mph to 35 mph. Sean presented two alternative
routes, with Alt. 1 requiring relocation of 9 homes and Alt. 2, 0 homes. The construction
and attributes of each alternative were reviewed. Construction costs for Alt. 1 with curb
and gutter for a portion of the road estimated at $4.2 million and $3.5 for Alt. 2. The
width of Alt. 2 is 80 ft. with a 30 ft. planting strip on either side, which is not purchased
by the City – but put on the plat when developed. Ald Slocomb asked why the road is
80 ft. from McShane to Hi View, and 100 ft. from Hi View to 00? Sean that’s how it’s
mapped by Planning, but if Durham from Woods Rd. to 00 is always planned to remain
rural, it should be 100 ft., and Mayor agreed it should be 100 ft. rural cross section. Ald.
Slocomb agreed with the rural cross section as ditches are better for water quality
issues. Sean advised this is about a 2.5 year project. Anticipated to have road
completed in August, 2005. Sean suggested the area of the park adjacent to the new
right-of-way be looked at for any work which could be done at the time of construction of
the road. He noted the bike path along the road will be 8 ft. hard surfaced. Ald.
Slocomb requested Sean to look at the possibility of an 8 ft. hard surface path, plus 8 ft.
th
gravel for equestrian use. An informational hearing was set for Wednesday, March 13
(note: later changed to 3/28) at 7:00 PM in the Muskego Room. A formal presentation
will be made with revised exhibits. Sean was directed to notify any development that is
tributary to Durham Drive between Woods Road and 00. Sean was excused at 8:45
PM.
Review status of Community Center project
Mayor noted the open house held last night went well with about 24 people attending.
Ald. Slocomb felt another hearing should be held and that postcard notification should
Committee of the Whole Page 2
Minutes of Meeting Held 2/14/02
be sent out. Ald. Petfalski recommended a formal presentation format with question
and answer period. Mayor agreed, with the various stations available after the program.
Ald. Patterson recommended the entire program be taped. The hearing date was
thth
selected as March 13, moving the Durham Dr. hearing to March 28. Mayor
recommended Craig Anderson proceed to develop an RFP for design/construction
services. A projected opening date would be October, 2003. Mayor would like to set up
a time to have Dave Anderson of Ehlers and Associates meet with COW to talk about
issues as they relate to this project and what it takes to create a Community
Development Authority (CDA) and what does it mean. One of the proposals is to fund
the project through CDA revenue bonds and to talk about the different proposals of
where the CDA areas would be in the community and the Tess Corners Drive area and
potential for redevelopment TIF in this area. Members of the Mayor’s Task Force will
thth
also be invited. March 7 and 14 were selected depending on Dave Anderson’s
schedule. The CDA would be the only topic on the agenda.
Discuss Status of Old Muskego Settlement Centre
Mayor reported Brian Turk received an e-mail from Don Pionek on the landscaping.
Hope to bring to Plan Commission meeting in March.
Discuss Streetscape – Gateways to City
Nothing new to report. On hold waiting for more detail on the Tess Corners project.
Lake Fees Study Committee Update
Ald Slocomb had nothing new to report.
Update on Power Plant Proposals
Mayor reported nothing new since his report to the Council on Tuesday.
Discuss Consolidated Dispatch
Mayor advised he talked to Chief Johnson today. The committee plans to meet first
with the Police Chiefs and then with elected officials of the communities. Ald. Petfalski
felt Mr. Finley was considering Muskego’s letter as an endorsement, and it was made
clear it was only a letter of intent to listen to more detail. Ald. Patterson moved to send
another letter to the County Board clarifying we are keeping an open mind to the
proposal but it is far from an endorsement of the proposal. Ald. Petfalski seconded;
motion carried.
Discuss Governor’s proposal relating to State Shared Revenues
Mayor advised a public hearing on this issue will be held at 10AM on 2/19/02 at MATC
sponsored by the Democrats. Jean asked if aldermen intend to attend they should
advise her in the event a quorum will necessitate an open meeting notice.
Discuss Hiring of Consultant for the Economic Development Strategic Plan
Planning Director Turk’s memo of 2/14/02 was reviewed. Mayor stated he couldn’t see
how sending out the RFP will interfere with any of the Planning Dept. projects and the
cost to send out would only be minimal. Ald. Petfalski moved to direct Brian Turk to put
the RFP out and provide a list of projects and how this will affect them so we know what
to prioritize. Ald Slocomb seconded; motion carried.
Committee of the Whole Page 3
Minutes of Meeting Held 2/14/02
Communications
Ald. Le Doux advised he had been offered an opportunity for all the aldermen to ride in
a wagon pulled by miniature Belgian horses for the Muskego Community Festival
parade. All concurred it was a good idea. As representative on the Festival Committee,
Ald Sanders will present the idea to the committee at their meeting next week.