Loading...
COMMITTEE OF THE WHOLE Minutes - 8/21/2014 Approved CITY OF MUSKEGO COMMITTEE OF THE WHOLE MINUTES August 21, 2014 6:00 PM City Hall, W182 S8200 Racine Avenue CALL TO ORDER Mayor Chiaverotti called the meeting to order at 6:00 pm. PLEDGE OF ALLEGIANCE Those present recited the Pledge of Allegiance. ROLL CALL Present were Aldermen Madden, Kubacki, Engelhardt, Di Pronio, Borgman, Wolfe, and Director of Finance and Administration Mueller. Alderman Hammel was absent. The following Department Heads were present: Police Chief Moser, IT Director Wisniewski, City Engineer Simpson and Parks & Recreation Director Anderson. STATEMENT OF PUBLIC NOTICE Ms. Mueller stated that the meeting was noticed in accordance with the open meeting law. APPROVAL OF AGENDA APPROVAL OF MINUTES - August 12, 2014 Alderman Madden made a motion to approve the August 12, 2014 minutes. Alderman Kubacki seconded. Motion Passed 6 in favor. NEW BUSINESS Capital Fund Budgets - Expenditure & Borrowing a. Information Technology b. Police c. DPW-Engineering d. Parks & Recreation The Mayor stated the Committee would begin review of the 2015 Capital Improvement requests. Police Chief Moser provided an update on several projects that were already approved. Muskego Firing Range Repair Chief Moser stated that the berms were initially supposed to be completed in 2013. However, weather conditions prevented the repairs from being done so funds were carried over to 2014. The repairs have now been completed. The cost came in much less than anticipated because new dirt did not have to be hauled to the site. The Chief is requesting $8,240 be used to update the targeting system. The berm repairs and targeting system update total $27,240. The 2014 budget reflected $70,000 for this project. Security and Surveillance System Upgrade The Chief stated money was budgeted in 2014 for this project. However, it was postponed because of the facility study. The cameras at the Police Department are failing so the project needs to get started. Ms. Mueller noted that the funds may carryover in 2015 given the late start of the project. He then reviewed the following 2015 requests: Capital Project/Item Cost Comments · HVAC $100,000 · Replace existing units. · Dependent on how long existing units will last and what will be done with the building in the future. Consensus Regarding Request: It was determined that $15,000 would be budgeted at this time for an air handler (dispatch area) and replacing the unit in the evidence room. 6 in favor Capital Project/Item Cost Comments · Ballistic Vests for $5,800 · Replace current vests, which are 12 years Tactical Team Members old. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Rifle Replacement $47,000 · Replace 18 – 20 year-old department rifles. Other Points of Discussion:  Ald. Borgman suggested replacement on a rotation basis over a three-year period.  Ald. Madden supports the replacement of all the rifles now. Future replacement could be done on a rotation basis. Consensus Regarding Request: 4 in favor Ald. Di Pronio, Engelhardt, Kubacki, Madden 2 opposed Ald. Wolfe, Borgman Information Technology IT Director Wisniewski was present to address the following requests: Capital Project/Item Cost Comments · 911 Equipment $120,000 · Replace existing processing equipment. · Manufacturer will not provide technical support as of March, 2015. · New system will have a longer life span. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Multi-Function Printing $15,000 · Replace existing equipment. Devices (Police Department and Community Development Department) Consensus Regarding Request: 4 in favor Ald. Wolfe, Borgman, Engelhardt, Madden 2 opposed Ald. Di Pronio, Kubacki Chief Moser was dismissed. IT Director Wisniewski continued with the 2015 requests. Capital Project/Item Cost Comments · Virtual Server Host $6,500 · Replace per four-year rotation cycle. Replacement Ms. Mueller noted that this item would be placed in the operating budget as determined last year. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · GPS Equipment $9,500 · Existing GPS equipment experienced a hardware failure, which requires replacement. Consensus Regarding Request: 5 in favor 1 opposed Ald. Borgman Capital Project/Item Cost Comments · Storage Area Network $40,000 · Vital piece of equipment. (SAN) · Replace to meet current and future needs. Consensus Regarding Request: 6 in favor Capital Project/ItemCost Comments · Citywide Wi-Fi Network $70,000 · Implementation of a citywide point to point wireless network. Consensus Regarding Request: 1 in favor Ald. Wolfe 5 opposed DPW-Engineering City Engineer Dave Simpson was present to discuss the following: Capital Project/Item Cost Comments · Fireside Orchard $80,000 · Final lift of asphalt needs to be installed. Subdivision Paving · The Public Works Committee has recommended the City pay 50% and the residents pay 50% of the cost. · The full amount needs to be budgeted with $40,000 being recouped through future assessments. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Woods Road Bridge $800,000 · Replace existing bridge, which has failed. Reconstruction · A grant from Waukesha County in the amount of $164,000 will help offset the cost. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Moorland Road $40,000 · Design and reconstruction of Moorland Reconstruction from Janesville to McShane and the intersection of Woods and Moorland. · Grant secured for 80% of the project cost. · $ amount reflects City’s 20% match. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Baylane Drive $40,000 · Reconstruct Baylane from Janesville to Reconstruction Woods and add pedestrian facilities. · Money allocated for first phase study to determine best options. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Pickup Truck $37,500 · Replace existing 2002 truck used for Replacement surveying and engineering inspections. Consensus Regarding Request: 5 in favor 1 opposed Ald. Di Pronio Capital Project/Item Cost Comments · Front End Loader $170,000 · Replace existing 15 year-old vehicle. Other Points of Discussion:  Ald. Kubacki would like to move to 2016. Consensus Regarding Request: 6 opposed Capital Project/Item Cost Comments · Light Duty Boom Truck $80,000 · Light duty vehicle would be used for flag and banner installations as well as street light maintenance. Vehicle would free up heavy duty truck. · Could be used by other departments. Other Points of Discussion:  Ald. Wolfe suggested newer street light bulbs.  It was also suggested that a light duty truck could be rented on an as-needed basis. It would allow the department to track the usage. Consensus Regarding Request to Purchase: 6 opposed Consensus Regarding Request (to Rent): 4 in favor Ald. Wolfe, Di Pronio, Kubacki, Madden 2 opposed Ald. Borgman and Engelhardt (Rental cost will be placed in the operating budget.) Capital Project/Item Cost Comments · Vehicle Hoist $10,000 · Would enable DPW staff to perform maintenance on Police Department vehicles, which is currently outsourced. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Industrial Park Lighting $30,000 · Replacement of approximately 10 street light poles that have failed in the industrial park. Other Points of Discussion:  Ald. Di Pronio would like to see if something could be done legally against the manufacturer of the existing poles since they should not have failed. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Replace DPW/Utilities $175,000 · Replacement is high priority. Roof (DPW · Total estimated cost is $350,000. Cost Portion) would be shared by DPW, Water and Sewer Utilities. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Cold Storage Building $360,000 · Has been discussed for years. 60 x 180 (City · Would house DPW equipment as well as (Commercial Grade) Portion) Police Department evidence and Conservation Department equipment. · Total estimated cost is $480,000. Cost would be shared with utilities paying 25%. Other Points of Discussion:  Several Aldermen did not believe this expenditure was prudent. Consensus Regarding Request: 6 opposed Capital Project/Item Cost Comments · Garage Doors $12,000 · Replace four existing doors and openers. (City · Total estimated cost $24,000. Cost would Portion) be split 50% with utilities. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Wash Station $5,000 · Replace worn pressure station in DPW (City wash bay. Portion) · Total estimated cost $10,000. Cost would be split 50% with utilities. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Richdorf Culvert $590,000 · Replace existing corrugated metal pipe Replacement with a larger reinforced concrete box culvert to alleviate flooding. Other Points of Discussion:  Swale is an option, which requires an easement. However, property owners not interested. Consensus Regarding Request: 6 opposed Parks & Recreation Parks & Recreation Director Anderson was present for the following requests: Park Dedication Special Revenue Program Fund Capital Project/Item Cost Comments · Future Trails $700,000 · Durham to Hwy. 36. Hwy. OO · Closes loop. Other Points of Discussion:  Ald. Madden noted this was approved in the past, and then put on hold several times.  Parks & Recreation Director Anderson noted that residents support the trails; they want a walkable community.  Several Aldermen expressed concern that the trails require maintenance and can only be used seasonally. Consensus Regarding Request: 3 in favor Ald. Engelhardt, Kubacki, Madden 3 opposed Ald. Wolfe, Borgman It was determined that this item would be deferred until Ald. Hammel could vote. Capital Project/Item Cost Comments · Park Arthur West $403,845 · 2015 expand access off of Martin Drive. Other Points of Discussion:  Mayor has had discussions with School District representatives on a cost sharing venture to establish an artificial turf football/soccer field.  Could be a win-win for the City.  Mayor requests decision be deferred at this time so School Board can discuss. Ald. Hammel would also like to discuss and he could not be present tonight. Consensus Regarding Request (to Defer): 6 in favor Capital Project/Item Cost Comments · Future Trails $60,000 · Janesville Road to Martin Drive. Lannon Road · Engineering fees to develop cost. Consensus Regarding Request: 6 opposed Capital Project/Item Cost Comments · Future Trails $275,000 · Racine Avenue to Windover Drive. Woods Road · Engineering would be done in house. Consensus Regarding Request: 4 opposed Ald. Wolfe, Di Pronio, Engelhardt, Madden 2 in favor Ald. Borgman and Kubacki Capital Project/Item Cost Comments · Future Trails $50,000 · West of Racine Avenue to the car wash. Janesville Road Consensus Regarding Request: 6 opposed Capital Project/Item Cost Comments · Future Trails $40,000 · County Park to Big Bend WE-Energies Trail (over 4 · DPW will install; cost is for Expansion years) stone/restoration. Consensus Regarding Request: 4 opposed Ald. Wolfe, Borgman, Kubacki, Madden 2 in favor Ald. Di Pronio, Engelhardt The City Engineer was dismissed. Capital Project/Item Cost Comments · Baseball Field $32,000 · Bay Lane I and II Fields Restoration · Denoon Park Field Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Boxhorn Warehouse $14,000 · Building leased by Boxhorn Gun Club Improvements (50% of space). Gun Club will pay for ½ the cost of the improvements. Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Horn Building Removal $24,000 · A portion of the building will be removed. · Bathrooms, storage and concession area will remain. Consensus Regarding Request: 5 in favor 1 opposed Ald. Borgman Capital Project/Item Cost Comments · Idle Isle Park Boat Rinse · LMLA sponsoring the project. Station · Grant funds may be available. · Parks Paving/Concrete $32,00 · Trail/Bleacher and Dugout Pads Park Arthur East (Concrete) Consensus Regarding Request: 6 in favor · Parks Paving/Concrete $7,000 · Pickle Ball Court Lions Park Consensus Regarding Request: 6 in favor · Parks Paving/Concrete $184,000 · Road/Parking Lots/Basketball Courts Denoon Park Consensus Regarding Request: 6 in favor · Parks Paving/Concrete $4,000 · Trail off of Belmont to Parking Lot Kurth Park Other Points of Discussion:  Parks & Recreation Director Anderson requested the expenditure be removed. Staff will repair so existing trail can be utilized vs. replacing. Parks & Recreation Capital Projects Capital Project/Item Cost Comments · ¼ Ton Patrol Truck $28,500 · Replace 2006 vehicle. (4-Wheel Drive) Consensus Regarding Request: 6 in favor Capital Project/Item Cost Comments · Shop Improvements $55,306 · Upgrade lighting system. · Flooring · Roofing Other Points of Discussion:  Director Anderson stated the cost for the exterior repairs ($12,650) could be put off until 2017. Consensus Regarding Request (Reduced to $42,656): 5 in favor 1 opposed Ald. Kubacki ADJOURNMENT Alderman Wolfe made a motion to adjourn at 9:36 pm. Alderman Borgman seconded. Motion Passed 6 in favor. Minutes transcribed by Jill Blenski, Deputy Clerk