CCR2019013-Public Improvements4Front
COMMON COUNCIL – CITY OF MUSKEGO
RESOLUTION #013-2019
DEDICATION AND ACCEPTANCE OF PUBLIC IMPROVEMENTS
FOR 4FRONT ENGINEERED SOLUTIONS, INC.
WHEREAS, 4Front Engineered Solutions, Inc., hereafter called “DEVELOPER” has constructed public
improvements at W183 S8253 Racine Avenue including all water distribution and paving including any
and all equipment and appurtenances which may in any way be a part thereof or pertain to, in and for the
improvements at W183 S8253 Racine Avenue; and
WHEREAS, the DEVELOPER has completed the construction and installation of the following
improvements:
Water Main: Gemini Court including east and west easements
165 LF at $38.00/LF of 6” C900 water main
30 LF at $40.00/LF of 8” C900 water main
1 Each at $720.00/Each of 8”x8” Cross
1 Each at $525.00/Each of 8” plug and buttress with 1” air release valve
1 Each at $1,180.00/Each of 8” butterfly valve and box
1 Each at $810.00/Each of 8” gate valve and box
1 Each at $165.00/Each of 8”x6” reducer
1 Each at $3,250.00/Each of hydrant
1 Each at $1,625.00/Each of salvaged hydrant
Total – Water Main at Gemini Court including east and west easements $15,745.00
Water Main: On-site easement extended from Racine Avenue
70 LF at $40.00/LF of 8” C900 water main
352 LF at 62.00/LF of 8” PVC water main directionally bored
1 Each at $3,350.00/Each of 8”x16” wet tap connection with 8” gate valve
1 Each at $380.00/Each of 8”x6” anchor tee
1 Each at $165.00/Each of 8”x6” reducer
2 Each at $3,250.00/Each of salvaged hydrant
Total – Water Main at on-site easement extended from Racine Avenue $35,019.00
Paving: Gemini Court
2,010 SY at $9.50/SY of 12” of crushed limestone base
2,010 SY at $12.20/SY of 4” of binder asphalt course lift
2,010 SY at $5.10/SY of 1-1/2” of surface asphalt surface course
1 Each at $2,500.00/Each of light pole removal and replacement
Resolution #013-2019 2
Total - Paving $56,368.00
and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter
18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has
certified the systems’ acceptability; and
WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give,
grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances,
and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate
directly to the utilization of such IMPROVEMENTS; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against
any defects due to faulty materials or workmanship which appear within a period of one (1) year from the
date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall
indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising
out of the alleged defects or other failure of this guarantee; and
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego,
upon the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the
public improvements in and for the 4Front Engineered Solutions, Inc. at W183 S8253 Racine Avenue,
Muskego, WI.
ND
DATED THIS 22 DAY OF JANUARY, 2019
SPONORED BY:
FINANCE COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #013-2019 which was adopted by the
Common Council of the City of Muskego.
_____________________________
Sharon Mueller, City Clerk-Treasurer