Bids-City HallBid Tabulation ZAS #150099.00
CONTRACTOR Scherrer Absolute Reichel JH Hassinger Peter Schwabe
Bond Guarantee
Furnished? Y/N Y Y Y Y Y
Addenda Recognized?
Y/N Y Y Y Y Y
Bid Form Signed? Y/N Y Y Y Y Y
Base Bid $ 5,961,698.00 $ 5,951,000.00 $ 5,923,000.00 $ 6,166,000.00 $ 6,274,347.00
Alternate No. 1
$ (9,800.00) $ (10,000.00) $ (10,000.00) $ (9,500.00) $ (12,640.00)
Alternate No. 2
$ (730.00) $ (900.00) $ (936.00) $ (700.00) $ (4,500.00)
Alternate No. 3
$ (1,250.00) $ (1,250.00) $ (1,000.00) $ (1,000.00) $ (2,400.00)
Alternate No. 4
$ (82,000.00) $ (50,000.00) $ (10,000.00) $ (12,000.00) $ (81,754.00)
Alternate No. 5
$ (144,500.00) $ (140,000.00) $ (1,000.00) $ - $ (144,666.00)
Alternate No. 6
$ (35,000.00) $ (60,000.00) $ (68,000.00) $ (30,000.00) $ (68,814.00)
Alternate No. 7
$ (47,800.00) $ (40,000.00) $ (14,000.00) $ (35,000.00) $ (48,854.00)
Alternate No. 8
$ (36,200.00) $ (36,275.00) $ (39,000.00) $ (45,000.00) $ (48,600.00)
Alternate No. 9
$ (70,000.00) $ (42,400.00) $ (60,000.00) $ (70,000.00) $ -
Alternate No. 10
$ 14,500.00 $ 15,000.00 $ 25,000.00 $ 28,000.00 $ 20,700.00
Unit Price No. 1
$ 23.00 $ 24.00 $ 15.00 $ 21.00 $ 14.00
Remove all cameras and access control devices.
Replace APTF-1 and APTF-2 with colored concrete.
Remove all aluminum sunshades.
Remove all landscaping.
Add landscape irrigation system.
Muskego City Hall Bid Opening 3/30/2017
Replace light fixture types AC3, AC4, AC6 and AC7 with type AR.
Delete folding wall in room C110.
Replace type SS-1 window sills with type PL-3.
Height of APW-1, APW-2 and APW-3 are reduced to 3'-6" AFF on walls and 7'-0" on columns.
Replace APTW-1, APTF-1 and APTF-2 with alternate tile in 09 30 00.
Alternates
Required Unit Prices
Amount per cubic yard for machine excavation of soil including loading and legal disposal.
CONTRACTOR Scherrer Absolute Reichel JH Hassinger Peter Schwabe
Unit Price No. 2
$ 23.00 $ 35.00 $ 41.00 $ 59.00 $ 29.50
Unit Price No. 3
$ - $ 20.00 $ 27.00 $ 46.00 $ 42.00
Unit Price No. 4
$ 58.15 $ 24.00 $ 40.00 $ 54.00 $ 51.00
Unit Price No. 5
$ 58.15 $ 42.00 $ 40.00 $ 65.00 $ 62.00
Unit Price No. 6
$ 2,018.00 $ 5,500.00 $ 1,800.00 $ 3,800.00 $ 972.00
Unit Price No. 7
$ 6.90 $ 6.00 $ 0.25 $ 7.00 $ 5.00
Steel
$ 9,000.00 $ 9,000.00 $ 4,700.00 $ 6,500.00 $ -
Reinforcing Steel
$ 1,009.00 $ 2,560.00 $ 900.00 $ 1,700.00 $ -
Council Chambers
Signage
$ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00
Undercuting
$ 22,097.00 $ 20,520.00 $ 15,600.00 $ 18,468.00 $ -
Overexcavation
$ 125,950.00 $ 166,400.00 $ 130,000.00 $ 154,650.00 $ -
Temporary Heating
$ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00
Cost of $35,000 for providing temporary heat per 01 50 00, 1.15.
Cost per square foot for installation of moisture mitigation system on concrete floors scheduled to receive a finish floor
covering.
Cost of furnishing and installing 1000 lbs. of reinforcing steel in addition to that indicated or specified to be used as
directed by Architect.
Cost of $8,000 to provide aluminum graphics signage at east wall of Council Chambers C115.
Include in Base Bid, an allowance for all labor, equipment, and materials required for undercuts totaling 380 cubic yards
(15% of the proposed pavement areas). (Undercutting method and materials as described within specification section
31 05 00 – Common Work results for Earthwork - Outside Building Footprint). Allowance shall be equal to the
undercutting unit price provided times the quantity stated here. For approved quantities in excess of the Undercutting
allowance, the actual undercutting cost will be paid in accordance with the required Undercutting unit price. Any
unused portion of the allowance shall be refunded to the owner as a credit at the end of the project.
Allowance for over excavation of soils and placement of engineered fill. See plan note on sheet S1.0 for description.
Amount per cubic yard to furnish and place approved structural fill material from outside sources, including machine
compaction, in lieu of unsuitable on-site material which is to be removed from site.
Amount per cubic yard to furnish approved fill material from on-site sources, including machine compaction, in lieu of
unsuitable on-site material which is to be removed from site.
Amount per cubic yard to furnish and place approved common fill material from outside sources, including machine
compaction, in lieu of unsuitable on-site material which is to be removed from site.
Cost per Cubic Yard for Undercutting (as defined in 31 05 00 - Common Work Results for Earthwork (Outside Building
Footprint) specifications, including removal and replacement).
Cost per ton for reinforcing steel in place. This unit price will be used to determine adjustments to the reinforcing steel
allowance.
Cost of furnishing and erecting 3000 lbs. of steel in addition to that indicated or specified to be used as directed by
Architect.
Required Allowances
Substitute bids