CCR2016037-Spectrum
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION # 037-2016
DEDICATION OF PUBLIC IMPROVEMENTS AND RELEASE OF LETTER OF CREDIT
FOR SPECTRUM WATERTOWER HOLDINGS PROJECT
WHEREAS, Spectrum Watertower Holdings, LLC, hereafter called “DEVELOPER” has constructed public
improvements in and around W160 S6369 Commerce Drive including a fire hydrant, storm sewer, storm
sewers, and paving including any and all equipment and appurtenances which may in any way be a part
thereof or pertain to, in and for the roadway modifications on Commerce Drive in the right-of-way adjacent
to W160 S6369 Commerce Drive; and
WHEREAS, the DEVELOPER has completed the construction and installation of the following
improvements:
Water Main
One Hydrant Extension- $900.00
One 8” Tap and Water Lateral- $3,300.00
Total – Water Main $4,200.00
Storm Sewer
One 48 Inch Manhole Inlet- $2,200.00
15 Feet of 18 Inch Storm Sewer- $30/ft= $450.00
Total – Storm Sewer $2,650.00
Roadway
Install 450 square yards of stone and asphalt roadway- $20,225.00
295 linear feet of new curb & gutter- $17.00/lf= $5,015.00
Grading of roadway- $5,950.00
Restoration of roadway edge- $4,875.00
Relocated Streetlight- $3,500.00
Total – Roadway $39,565.00
and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision of Chapter 18
of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and the City Engineer has
certified the systems’ acceptability; and
WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally give, grant,
convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and
together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly
to the utilization of such IMPROVEMENTS; and
Resolution #037-2016 2
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any
defects due to faulty materials or workmanship which appear within a period of one (1) year from the date of
dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the
CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged
defects or other failure of this guarantee; and
WHEREAS, the DEVELOPER has requested release of the letter of credit that was established as
part of the Spectrum Watertower Holdings Developer’s Agreement and the City Engineer has recommended
release of said letter of credit; and
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon
the recommendation of the Finance Committee, does hereby accept dedication and acceptance of the public
improvements in and for the Spectrum Watertower Holdings project and authorize release of the letter of
credit.
th
DATED THIS 10 DAY OF MAY, 2016
SPONSORED BY:
FINANCE COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #037-2016 which was adopted by the
Common Council of the City of Muskego.
_____________________________
Sharon Mueller, City Clerk-Treasurer