WHEREAS, Belle Chasse Partners LLC, hereafter called “DEVELOPER” has
constructed public improvements in and around Freedom Avenue, Independence Court, Hunters
Hill Court, and Fox Run Court, Mourning Dove Court including all water distribution, sanitary
sewer facilities, and storm sewers including any and all equipment and appurtenances which may
in any way be a part thereof or pertain to, in and for the Belle Chasse Addition #3 Subdivision;
and
WHEREAS, the DEVELOPER has completed the construction and installation of the
following improvements:
Sanitary Sewer
1,110 LF at $130/LF of 8” Sanitary (Spoil Backfill)
433 LF at $94/LF of 8” Sanitary (Gravel BF 14’ to 17’)
2,244 LF at $76/LF of 8” Sanitary (Gravel BF Less than 14’ Deep)
2,651 LF at $50/LF of 6” Sanitary Sewer (57)
20 EACH at $3,000/EACH of Standard San Manhole (Avg Depth 11.5’)
3 EACH at $4,200/EACH of Sanitary Drop Manhole
1 EACH at $5,000/EACH of Sanitary Connect to Existing
2 EACH at $400/EACH of Sanitary Lateral Riser
Water Main
767 LF at $82/LF of 12” Water Main
1 EACH at $6,500/EACH of 12” Water Main (conn, rd cross, sl, asphalt)
3,232 LF at $64/LF of 8” Water Main
165 LF at $60/LF of 6” Water Main
12 EACH at $3,500/EACH of Hydrant
10 EACH at $1,000/EACH of 6” Valve
12 EACH at $1,400/EACH of 8” Valve
3 EACH at $1,900/EACH of 12” Valve
2,596 LF at $28/LF of Water Service
57 EACH at $425/EACH of Sets Brass
2 EACH at $2,000/EACH of Connect to Existing Water Main
1 EACH at $9,200/EACH of Connect to Existing Water Main
Storm Sewer
43 LF at $96/LF of 36” RCP Storm Sewer
180 LF at $100/LF of 24” x 38” RCP Storm Sewer
90 LF at $64/LF of 14” x 23” RCP Storm Sewer
173 LF at $83/LF of 30” Concrete Storm Sewer
742 LF at $65/LF of 24” Concrete Storm Sewer
469 LF at $59/LF of 21” Concrete Storm Sewer
2,291 LF at $52/LF of 18” Concrete Storm Sewer
886 LF at $45/LF of 15” Concrete Storm Sewer
1,476 LF at $43/LF of 12” Concrete Storm Sewer
Reso. #081-2015 Page 2
631 LF at $18/LF of PVC Sump Pump Line
1,838 LF at $18/LF of 6” PVC Storm Sewer Laterals (57)
1 EACH at $2,250/ EACH of 36” Concrete End Section
1 EACH at $1,425/ EACH of 14” x 23” RCP End Section
1 EACH at $1,959/EACH of 30” Concrete End Section w/RipRap
1 EACH at $1,600/EACH of 24” Concrete End Section w/RipRap
1 EACH at $1,450/EACH of 21” Concrete End Section w/RipRap
6 EACH at $1,300/EACH of 18” Concrete End Section w/RipRap
2 EACH at $1,200/EACH of 15” Concrete End Section w/RipRap
3 EACH at $1,100/ EACH of 12” Concrete End Section w/RipRap
5 EACH at $1,500/EACH Pond Outlet Structure
41 EACH at $1,400/EACH of Curb Inlets
33 EACH at $1,550/EACH of Storm Manholes
5 EACH at $500/EACH of Sump Line C.O.
380 LF at $54/LF of 18” CMP Storm Sewer
6 EACH at $1,100 of Field Inlets
and appurtenances (collectively called “IMPROVEMENTS”) in accordance with the provision
of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the “CITY”, and
the City Engineer has certified the systems’ acceptability; and
WHEREAS, it is the Developer’s intent to, without charge to the CITY, unconditionally
give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all
encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and
appurtenances which relate directly to the utilization of such IMPROVEMENTS; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated
against any defects due to faulty materials or workmanship which appear within a period of one
(1) year from the date of dedication and shall pay for any damages resulting therefrom to the
CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought
against the CITY at any time arising out of the alleged defects or other failure of this guarantee;
and
WHEREAS, the DEVELOPER must complete the installation of the roadway surface
course per the subdivider’s agreement, and such installation must meet all City requirements; and
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of
Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication
and acceptance of the public improvements in and for the Belle Chasse Addition #3 Subdivision.
th
DATED THIS 28 DAY of JULY , 2015
SPONSORED BY:
FINANCE COMMITTEE
This is to certify that this is a true and accurate copy of Resolution #081-2015 which was
adopted by the Common Council of the City of Muskego.
_____________________________
Clerk-Treasurer