CCR2012010-Agreement
Page 1 of 1
CITY OF MUSKEGO
Staff Report to Public Works Committee
To: Public Works Committee
From: David Simpson, P.E., Director of Public Works/City Engineer
Subject: Review and approve an Agreement for Access and Groundwater
Monitoring
Date: January 26, 2012
The attached cover letter discusses the Muskego Site Groundwater Remediation
Group’s (MSGRG) request to enter into an agreement for the placement of four
additional groundwater monitoring wells. The MSGRG will be placing these wells
per the attached agreement, which are required per an agreement they reached with
the USEPA.
Staff has review the proposed locations and do not see any negative impacts. The
agreement is in the same form as the previously approved agreement that was
entered into for prior wells in 2004. The only difference is the name of the group.
Recommendation:
Recommend approval of the attached agreement.
REMEDIAL DESIGN / REMEDIAL ACTION WORKPLAN
MUSKEGO SANITARY LANDFILL
MUSKEGO, WISCONSIN
PROPOSED MONITORING WELL LOCATION
MW-20
PAPEZ J
JANUARY 2012
004124-001
071330312_mb.mxd
MW-20
DRAWN BY:
APPROVED BY:
DATE:
PROJ. NO.:
FILE NO.:
Í!(
MSKC2225999006
MSKC2225999019
MSKC2228999021
MSKC2225999018
MSKC2228999020
CONDO
CONDO
CONDO
MSKC2225999015
CONDO
MSKC2225999016
MSKC2228016
MSKC2228999010
MSKC2228017
MSKC2228999008
MSKC2228028MSKC2228018
MSKC2228026
MSKC2228027
MSKC2228999018
MSKC2228019
MSKC2228999019MSKC2228029MSKC2228020
MSKC2225999010MSKC2225074
MSKC2228046
MW-20
Janesv
i
l
l
e
R
d
Janesv
i
l
l
e
R
d
Apol
l
o
D
r
Apol
l
o
D
r
P
r
o
v
i
d
e
n
c
e
W
a
y
P
r
o
v
i
d
e
n
c
e
W
a
y&0 200 400
FEET
1:2,400
1 INCH = 200 FEET
E:\RMT_DATA\PRE_TESS_PROJECTS\07133\03\MXD\071330312_mb.mxdPrinted By: JPAPEZ on 1/10/2012
708 Heartland Trail
Suite 3000Madison, WI 53717
Phone: 608.826.3600
BASE MAP IMAGERY FROM ESRI/BING BASE MAP LAYER, "BING MAPS AERIAL", 2011. PARCEL INFORMATION FROM WAUKESHA COUNTY.
WELL ID:
MW-20
OWNER:
CITY OF MUSKEGO
ADDRESS:
CITY RIGHT-OF-WAY -
APOLLO DR
LEGEND
Í!(PROPOSED MONITORING
WELL LOCATION
RIGHT-OF-WAY
REMEDIAL DESIGN / REMEDIAL ACTION WORKPLAN
MUSKEGO SANITARY LANDFILL
MUSKEGO, WISCONSIN
PROPOSED MONITORING WELL LOCATION
MW-21A
PAPEZ J
JANUARY 2012
004124-001
071330312_mb.mxd
MW-21A
DRAWN BY:
APPROVED BY:
DATE:
PROJ. NO.:
FILE NO.:
Í!(
MSKC2237992MSKC2238999
MSKC2237064
MSKC2227116
MSKC2227988002
MSKC2227986
MSKC2227988001
MSKC2228996
MSKC2227987
MSKC2227985
MSKC2227985002
MSKC2227985001
MSKC2237998
MSKC2227012 MSKC2227089
MSKC2237034
MSKC2237035
MSKC2237033
MSKC2237036
MSKC2227097
MSKC2227092
MSKC2227093
MSKC2227099
MSKC2227100
MSKC2227096
MSKC2227094
MSKC2227098
MSKC2227095
MSKC2237032
MW-21A
Woods RdWoods Rd
Pl
u
m
C
r
e
e
k
B
l
v
d
Pl
u
m
C
r
e
e
k
B
l
v
d
Greenhaven CtGreenhaven Ct Turn
b
e
r
r
y
C
t
Turn
b
e
r
r
y
C
t
&0 200 400
FEET
1:2,400
1 INCH = 200 FEET
E:\RMT_DATA\PRE_TESS_PROJECTS\07133\03\MXD\071330312_mb.mxdPrinted By: JPAPEZ on 1/10/2012
708 Heartland Trail
Suite 3000Madison, WI 53717
Phone: 608.826.3600
BASE MAP IMAGERY FROM ESRI/BING BASE MAP LAYER, "BING MAPS AERIAL", 2011. PARCEL INFORMATION FROM WAUKESHA COUNTY.
WELL ID:
MW-21A
OWNER:
CITY OF MUSKEGO
ADDRESS:
WOODS RD
LEGEND
Í!(PROPOSED MONITORING
WELL LOCATION
RIGHT-OF-WAY
REMEDIAL DESIGN / REMEDIAL ACTION WORKPLAN
MUSKEGO SANITARY LANDFILL
MUSKEGO, WISCONSIN
PROPOSED MONITORING WELL LOCATION
MW-22A
PAPEZ J
JANUARY 2012
004124-001
071330312_mb.mxd
MW-22A
DRAWN BY:
APPROVED BY:
DATE:
PROJ. NO.:
FILE NO.:
Í!(
Wi
n
d
o
v
e
r
C
t
Wi
n
d
o
v
e
r
C
t
MSKC2238992
MSKC2238994
MSKC2233999
MSKC2238996001
MSKC2238997 MSKC2238999
MSKC2238995
MSKC2238993
MSKC2236994 MSKC2239999MSKC2239998
MSKC2237061
MSKC2227989006
MW-22A
NOTE:
LOCATION TO BE DEPENDENT ON
FINAL ACCESS ASSESSMENT.
&0 200 400
FEET
1:4,800
1 INCH = 400 FEET
E:\RMT_DATA\PRE_TESS_PROJECTS\07133\03\MXD\071330312_mb.mxdPrinted By: JPAPEZ on 1/10/2012
708 Heartland Trail
Suite 3000Madison, WI 53717
Phone: 608.826.3600
BASE MAP IMAGERY FROM ESRI/BING BASE MAP LAYER, "BING MAPS AERIAL", 2011. PARCEL INFORMATION FROM WAUKESHA COUNTY.
WELL ID:
MW-22A
OWNER:
CITY OF MUSKEGO
ADDRESS:
S92W19656
HENNEBERRY
LEGEND
Í!(PROPOSED MONITORING
WELL LOCATION
RIGHT-OF-WAY
REMEDIAL DESIGN / REMEDIAL ACTION WORKPLAN
MUSKEGO SANITARY LANDFILL
MUSKEGO, WISCONSIN
PROPOSED MONITORING WELL LOCATION
MW-24A
PAPEZ J
JANUARY 2012
004124-001
071330312_mb.mxd
MW-24A
DRAWN BY:
APPROVED BY:
DATE:
PROJ. NO.:
FILE NO.:
Í!(
MSKC2235999
MSKC2235998
MSKC2234996
MSKC2235998002
MSKC2278993
MSKC2234996
MSKC2235997
MSKC2235998001
MSKC2234996002
MW-24A
NOTE:
TO BE FLUSH MOUNTED WELL.
Henneberry DrHenneberry Dr
C
r
o
w
b
a
r
D
r
C
r
o
w
b
a
r
D
r&0 200 400
FEET
1:2,400
1 INCH = 200 FEET
E:\RMT_DATA\PRE_TESS_PROJECTS\07133\03\MXD\071330312_mb.mxdPrinted By: JPAPEZ on 1/17/2012
708 Heartland Trail
Suite 3000Madison, WI 53717
Phone: 608.826.3600
BASE MAP IMAGERY FROM ESRI/BING BASE MAP LAYER, "BING MAPS AERIAL", 2011. PARCEL INFORMATION FROM WAUKESHA COUNTY.
WELL ID:
MW-24A
OWNER:
CITY OF MUSKEGO
ADDRESS:
CITY RIGHT-OF-WAY -
CROBAR DR
LEGEND
Í!(PROPOSED MONITORING
WELL LOCATION
RIGHT-OF-WAY