PCR1998031RESOLUTION #P.C. 03 1-98
APPROVAL OF RENEWAL OF OUTDOOR STORAGE FOR RALPH W MUSH AT
THE PROPERTY LOCATED AT S83 WI 8550 SATURN DRIVE
(LAKE & COUNTRY STORAGE)
WHEREAS, The Plan Commission on May 2, 1989, adopted a building, site and
operation plan through Resolution #PC 65-89, and amended that building, site and operation plan
by approving two (2) buildings for storage, subject to landscaping and fencing, and amended the
building, site and operation plan through Resolution #PC 199-90, signage and lighting plans,
hrther amended through Resolution #PC201-93, to allow the outdoor storage of only 5 wheeled
vehicles (vehicles, trailers, boats) along the north lot line, parallel parked and no higher than six
(6) feet with an annual review, and
WHEREAS, The Deed Restrictions of the Muskego Business Industrial Park state that
“All material or products stored outside must be behind the building setback line from the street
and must be screened from view from the street with solid fencing or screening approved by the
Plan Commission.’’ and
WHEREAS, The proposed parking is located behind the setback line
THEREFORE BE IT RESOLVED, That the Plan Commission approve the amended
building, site and operation plan for Lake & Country Storage, Inc., to allow outdoor storage (as
depicted on the plans dated received October 6, 1993) located at S83 W18550 Saturn Drive. a
BE IT FURTHER RESOLVED, That only five (5) wheeled vehicles (vehicles, trailers,
boats) may be stored at this location and must be located along the north lot line, parallel parked
and no higher than six (6) feet with an annual review in the March, Plan Commission meeting.
BE IT FURTHER RESOLVED, That the site plan (dated received October 6, 1993) and
exhibits are to be kept on file at the City of Muskego.
BE IT FURTHER RESOLVED, That all aspects of this building, site and operation plan,
as they relate to the building, parking and drive areas, landscaped areas and signage shall be
maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the conditions of this
approval shall result in the imposition of fines of $100 per day per violation, the initiation of legal
action or both.
Plan Department
City of Muskego
Adopted 03-17-98
Defeated
Deferred
03-09-98