PCR1998007RESOLUTION #P.C. 07-98
APPROVAL OF AN AMENDMENT OF A CONDITIONAL. USE FOR MINING AND
PROCESSING OF SAND AND GRAVEL TO ALLOW A CAPACITY INCREASE OF AN
ASPHALTTNG PLANT FROM 225 TONS PER HOUR TO 350 TONS PER HOUR FOR
PAYNE AND DOLAN, INC.
WHEREAS, The Plan Commission approved of a conceptual amendment to a building,
site and operation plan for a new asphalt batch plant with an increased capacity of 225 tons per
hour to 350 tons per hour on the Payne and Dolan property at Janesville Road and Crowbar
Road, and
WHEREAS, The existing building, site and operation plan is under a conditional use and
the replacement of the existing batch asphalt plant is considered a substantial change to the
existing operations requiring an amendment to the existing conditional use
WHEREAS, A public hearing for said conditional use was scheduled prior to the Plan
Commission meeting, dated January 20, 1998, and
WHEREAS, The property is zoned B-4, Highway Business, and said use is permitted by
conditional use.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amendment
of an existing conditional use for a new asphalt batch plant with a 350 ton per hour capacity for
Payne and Dolan at the Janesville Road and Crowbar Road site.
BE IT FURTHER RESOLVED, That said plans are approved as submitted and a copy of
said plans be kept on file in an address file in the Building Department and all aspect of this shall
be maintained in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in
this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action,
or both.
Plan Department
City of Muskego
Adopted 0 1-20-98