CCR2007238.
.
.
COMMON COUNCIL - CITY OF MUSKEGO
RESOLUTION #238-2007
DEDICATION OF PUBLIC IMPROVEMENTS WITHIN QUIETWOOD EAST II
SUBDIVISION LOCATED EAST OF QUIETWOOD DRIVE AND NORTH OF WOODS
ROAD
WHEREAS, Quietwood East, LLC hereafter called "DEVELOPER" has constructed the
following public improvements: sanitary sewer, water main, storm sewer, curb and gutter and
asphalt pavement in Westfield Way and Knollwood Court at the following development:
QUIETWOOD EAST II SUBDIVISION BEING A PART OF THE SOUTHWEST 'i:í OF THE
NORTHWEST 'i:í AND THE NORTHWEST 'i:í OF THE SOUTHWEST 'i:í OF SECTION 11,
TOWN 5 NORTH, RANGE 20 EAST, IN THE CITY OF MUSKEGO, WAUKESHA COUNTY,
WISCONSIN
and
WHEREAS, the DEVELOPER has completed the construction and installation of the
following improvements:
Sanitary Sewer
821.2 LF at $SO.2S/LF of 8" diameter pvc sanitary sewer pipe
3 EACH at $2S00.00/EACH of 48" diameter concrete sanitary sewer manholes
870 L.F. at $27.S0/L.F. OF 6" diameter pvc sanitary sewer lateral
Water Main
839.5LF at $39.00/LF of 8" diameter pvc water main pipe
3 EACH at $800.00/EACH of 8" diameter butterfly valves with valve boxes
2 EACH at $600.00/EACH of 6" diameter butterfly valves on hydrant lead pipe
2 EACH at $ISOO.OO/EACH of fire hydrants
19.4 LF at $30.00/LF of 6" diameter pvc water main lead pipe
17 EACH at $ISO.OO/EACH of 1-1/4" diameter curb valves and valve boxes on service
connections
814.3 LF at $20.57/LF of 1-1/4" diameter copper water service pipe
Storm Sewer
216.S LF at $36.22/LF of 12" diameter reinforced concrete storm sewer pipe
275.6 LF at $3S.00/LF of IS" diameter reinforced concrete storm sewer pipe
195.6 LF at $37.00/LF of 18" diameter reinforced concrete storm sewer pipe
8 EACH at $146S.00/EACH of20"X36" catch basins
4 EACH at $16S0.00/EACH of 48" diameter concrete storm sewer manholes
930.9 LF at $27.89/LF of6" diameter HDPE sump line
.
.
.
Reso. #238-2007 Page 2
and appurtenances (collectively called "IMPROVEMENTS") in accordance with the provision
of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the "CITY" and
the City Engineer has certified the systems' acceptability; and
WHEREAS, it is the Developer's intent to, without charge to the CITY, unconditionally
give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all
encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and
appurtenances which relate directly to the utilization of such utilities; and
WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated
against any defects due to faulty materials or workmanship which appear within a period of one
(I) year from the date of dedication and shall pay for any damages resulting therefrom to the
CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought
against the CITY at any time arising out of the alleged defects or other failure of this guarantee.
NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of
Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication of
the public improvements within Quietwood East II subdivision.
DATED THIS 11th DAY of DECEMBER, 2007
SPONSORED BY:
FINANCE COMMITTEE
Ald. Bob Melcher
Ald. Neil Borgman
Ald. Keith Wemer
This is to certify that this is a true and accurate copy of Resolution #238-2007 which was
adopted by the Common Council of the City of Muskego.
.
.
.
CITY OF MUSKEGO
Staff Report to Finance Committee/Common Council
w 1!?~so(,,~iOW1i.:? 3?
To: Finance Committee/Common Council
EngineerÌnl!..Department, David J. White, P.E., City Engineer"ù~~
Dedication of Improvements for Quietwood East II Subdivision
From:
Subject:
Date: November 30, 2007
Background
Quietwood East, LLC developer of Quietwood East II Subdivision has satisfactorily
completed all of the required improvements in accordance with their developer's
agreement dated April 5, 2005.
The required improvements include constructing 902 centerline feet of asphalt
street with concrete curb and gutter on Westfield Way and Knollwood Court and
constructing storm sewer, sanitary sewer and water main within easements,
Westfield Way and Knollwood Court.
Attached is the Quietwood East, LLC request to dedicate the required
improvements which includes the total quantity and the itemized costs for each of
the utility improvements:-
Recommendation for Action by Committee:
I recommend that both Finance Committee and Common Council accept the
dedication of public improvements for Quietwood East II Subdivision.
Fiscal Note(s):
Total $ Requested: None
-.
S:\CITYHALL\Engineering\Subdivisions\Quietwood East II\Dedication memo 113007.doc
.
.
.
REQUEST FOR CITY OF MUSKEGO APPROVAL OF
DEDICATION OF PUBLIC IMPROVEMENTS
FOR
QUIETWOOD EAST II
Quietwood East II, LLC, (Developer) in accordance with the Quietwood East II Development
Agreement hereby, without charge to the City of Muskego (City), gives, grants, conveys and
fully dedicates to the City on behalf of and for the benefit of the public for public use the public
street improvements on Knollwood Court and Westfield Way, and the sanitary sewer, water
main and storm sewer facilities, including any and all equipment and appurtenances which may
in any way be a part thereof or pertain to, free and clear of all liens and encumbrances in the
following quantities:
Sanitary Sewer
821.2 L.F. at $50.25/L.F. of 8" diameter pvc sanitary sewer pipe
3 EACH at $2,500/EACH of 48" diameter concrete sanitary sewer manholes
870 L.F. at $27.50/L.F. of 6" diameter pvc sanitary sewer lateral
Water Main
. 839.5 L.F. at $39.00/L.F. of 8" diameter pvc water main pipe
. 3 EACH at $800.00/EACH of 8" diameter butterfly valves with valve boxes
. 2 EACH at $600.00/EACH of 6" diameter butterfly valves on hydrant lead pipe
. 2 EACH at $1 ,500.00IEACH of fire hydrants
. 19.4 L.F. at $30.00/L.F. of 6" diameter pvc water main lead pipe
. 17 EACH at $150.00/EACH of 1-1/4" diameter curb valves and valve boxes on service
connections.
. 814.3 L.F. at $20.57/L.F. of 1-114" diameter copper water service pipe
Storm Sewer
. 216.5 L.F. at $36.22/L.F. of 12" diameter reinforced concrete storm sewer pipe
. 275.6 L.F. at $35.00/L.F. of 15" diameter reinforced concrete storm sewer pipe
. 195.6 L.F. at $37.00/L.F. of 18" diameter reinforced concrete storm sewer pipe
. 8 EACH of$I,465.00/EACH of20" x 30" catch basins
. 4 EACH of $1 ,650.00/EACH of 48" diameter concrete storm sewer manholes
. 930.9 L.F. at $27.89/L.F. of 6" diameter HDPE sump line
Requested for dedication this ~ day '\)~~~ ~~ ,2007.
By D~~ ~~ .
DEVELOPER ~
IMuskego City 1392233> 320 Addition No 2-Const Review> Correspondence_AA
120071121-Request for Approval of Dedication of Public Improvements.doc