ACCEPTANCE OF 2006 CLASSIFIED EQUIPMENT RATES
BE IT RESOLVED That the Common Council of the City of Muskego does hereby
approve the Federal Emergency Management Agency Schecfule of Equipment Rates as
attached.
DATED THIS 24th DAY OF Januarv_, 2006.
SPONSOHED BY:
Mayor Charles Damaske
This is to certify that this is a true and accurate copy of Resolution #010-2006 which
was adopted by the Common Council of the City of Muskego.
'" .//-'j .I
, ,. I
(/}'(/P I / /0,-;/0/ /
:(.. I ,
l../ J.. /
,Clerk- Treasurer ( , ...
'--./
1/2006jmb
I
I
I
FENlA's Schedule of Equipment Rates
DEPARTMENT OF HOMELAND SECURITY
EMERGENCY PREP,oHEDNESS AND RESPONSE DIRECTORJl,TE
RECOVERY DIVISION
PUBLIC ASSISTANCE BRANCH
WASHINGTON, D.C. 20472
The rates on this Schedule of Equipment Rates are for applicant-owned equipment in good mechanical
condition, complete with all required attachments. Each rate covers all costs eliÇlible under the Robert T.
Stafford Disaster Relief and Emergeney Assistance Act, 42 U.S.C. !ì 5121, et seq., fOI" ownership and
operation of equipment, including depreciation, overhead, all maintenance, field repairs, fuel, lubricants,
tires, OSHA eaUi(lment and other costs incident to operation. Standby eauipment costs are not eliaible.
Equipment must be in actual operatiol1 performing eligible work in ol"der for reimbursement to be eligible.
LABOR COSTS OF OPERATOR ARE NOT INCLUDED in the rates and should IDe approved separately
from eauioment costs.
Information reganjing the use of the Schedule is contained in 44 CFR 9 206.228 Allowable Costs. Rates
for equipment not listed will be furnished by FEMA upon request. Any appeals shall be in accordance with
44 CFR 9 206.2013 Appeals.
THESE RATES ,o.RE APPLICABLE TO MAJOR DISASTERS AND EMERGENCIES DECLARED BY THE
PRESIDENT ON OR AFTER AUGUST 28, 2005.
Cost Equipment ~specification I CapacitylSize I HP INotel;
Code
Articul
8490 Aerial Lift, Self-Propellecl Max. Platform Heiaht 37 Ft to 15 Sciss
Articul
8491 Aerial Lift, Self-Prooellecl Max. Platforrr Height 60 Ft to 30 Sciss
Artic~11
8492 Aerial Lift, Self-Propellecl Max. Platforrr Heiaht 70 Ft to 50 Sciss
Articul
8493 Aerial Lift, Self-Propellecl Max. Platforrr Height 125 Ft to 85 Teles
Articul
8494 Aerial Lift, Self-Propeliecl Max. Platforrr Heiaht 150 Ft 10130 Teles
Articul
8486 Aerial Lift, Truck Mntd Max. Platforrr Heiaht 25 Ft Teles
ArtiCLII
8487 Aerial Lift, Truck Mntd Max. Platform Heiaht 50 Ft Teles
Articul
8488 Aerial Lift, Truck Mntd Max. Platform Heiaht 75 Ft Teles
ArticUli
8489 Aerial Lift, Truck Mntd Max. Platform Heiaht 100 Ft Teles
8010 Air Compressor Air Delive 41 CFM to 10 Hose:s
8011 Air Compressor Air Delive 103 CFM to 30 Hoses
8012 Air Compressor Air Delive 130 CFM to 50 Hoses
8013 Air Compressor Air Delive 175 CFM to 90 Hose:s
8014 Air Compressor Air Delivery 400 CFM to 145 Hose:s
8015 Air Compressor Air Delivery 575 CFM to 230 Hose
8016 Air Compressor Air Delivery 1100 CFM to 355 Hose
8017 Air Compressor Air Delivery 1600 CFM to 500 Hose
8020 Air Curtain Burner to 50 In gro
8021 Air Curtain Burner to 75 In gro
8022 Air Curtain Burner to 100 In aro
8023 Air Curtain Burner to 50 Abovi
8024 Air Curtain Burner to 75 Abovi
8025 Air Curtain Burner to 100 Abovi
8040 Ambulance to 150
8041 Ambulance to 210
8060 Auaer, Portable Hole Diameter 16 In to 6
8061 Auaer, Portable Hole Diameter 18 In to 13
Inclucl
8062 Auaer, Tractor Mntd Max. Auaer Diameter 36 In to 13 and m
8063 Auaer, Truck Mntd Max. Auaer Size 241n to 100 Guard
8070 Automobile to 130 Trans,
8071 Automobile to 130 Trans,
8072 Automobile, Police to 250 Patrol
Statio
8073 Automobile, Police to 250 runnin
8110 Barae, Deck Size 120'x30'x7.25'
8111 Barae, Deck Size 120'x45'xT
8112 Barae, Deck Size 140'x45'xT
8113 Barae, Deck Size 150'x45'x9'
Federal Emergency Management A[lency 28 August 2005
Unit Rate
, Telescoping,
hour $5.70
, Telescoping,
hour $11.80
, Telescoping,
hour $2140
and
19. hour $38.50
. and
'lg. hour $60.00
I and
'la. hour $540
I and
'la. hour $9.00
and
1a. hour $19.10
and
19. hour $36.00
luded. hour $1.55
luded. hour $4.75
luded. hour $9.25
luded. hour $17.20
luded. hour $24.80
luded. hour $40.50
luded. hour $60.00
luded. hour $82.00
burner. hour $6.60
burner. hour $7.60
burner. hour $8.75
und burner. hour $9.05
und burner. hour $1160
und burner. hour $15.30
hour $21.50
hour $32.00
hour $1.40
hour $3.30
igger, boom
ting hardware. hour $1.80
lost driver. hour $30.00
il1g people. mile $045
il1g cargo. hour $9.75
mile $0.55
with engine
hour $14.35
hour $25.50
hour $39.50
hour $53.00
hour $62.00
ated
or.
ated
or.
ated
or.
ated
copir
ated
copir
ated
copir
ated
copir
ated
copir
ated
copir
inc
inc
inc
inc
inc
s inc
s inc
s inc
und
und
und
~ gro
~ gro
~ gro
es d
oun
!@l!J
~
~
~
nary
~
Page 1 of 7
,
,
I
FENlA's Schedule of Equipment Rates
8115 Barae, Hopper Size 200'x35'x12' Open
8116 Barae, Hopper Size 200'x35'x12' Close
8050 Board, Arrow to 8 Trailer
8051 Board, Messaae to 5 Trailer
8133 Boat, Push Size 45'x21'x6' to 435 Flat h
8134 Boat, Push Size 54'x21'x6' to 525 Flat h
8135 Boat, Push Size 58'x24'x7.5' to 705 Flat h
8136 Boat, Push Size 64'x25'x8' to 870 Flat h
8130 Boat, Row Heav
8131 Boat, Runabout Size 13'x5' to 50 Outbo
Inboar
8132 Boat, Tender Size 14'xT to 100 drive.
8120 Boat, Tow Size 55'x20'x5' to 870 Steel
8121 Boat, Tow Size 60'x21'x5' to 105C Steel
8122 Boat, Tow Size 70'x30'x7.5' to 135C Steel
8123 Boat, Tow Size 120'x34'x8' to 200C Steel
8140 Boat, Tu Len th 16 Ft to 100
8141 Boat, Tu Len th 18 Ft to 175
8142 Boat, Tu Len th 26 Ft to 250
8143 Boat, Tu Len th 40 Ft to 380
8144 Boat, Tu Len th 51 Ft to 700
8419 Breaker, Pavement Hanlj-Helc Wei aht 25-90 Lbs
8420 Breaker, Pavement to 70
8421 Breaker, Pavement to 105
8422 Breaker, Pavement to 137
8150 Broom, Pavement Broom Len ttl 72 In to 20
8151 Broom, Pavement Broom Len th 84 In to 45
8152 Broom, Pavement Broom Len ttl 96 In to 100
8153 Broom, Pavement, Mntd Broom Len th 72 In to 18
8154 Broom, Pavement, Pull Broom Len th 84 In to 20
8270 Bucket, Clamshell Capacity 1.0CY Inclucl
8271 Bucket, Clamshell Ca acitv 2.5CY Inclucl
8272 Bucket, Clamshell Ca acity 5.0CY Inclucl
8273 Bucket, Clamshell Ca acitv 7.5 CY Inclucl
8275 Bucket, Ora line Ca acity 2.0CY
8276 Bucket, Ora line Ca acitv 5.0CY
8277 Bucket, Ora line CaDacitv 10 CY
8278 Bucket, Ora line Capacity 14 CY
8180 Bus to 150
8181 Bus to 210
8182 Bus to 300
8190 Chain Saw Bar Lenath 16 In
8191 Chain Saw Bar Lenath 251n
8192 Chain Saw, Pole Bar Size 181n
8200 Chi er, Brush Chi in Ca acitv 61n to 35 Trailer
8201 Chi er, Brush Chi in Ca acit 121n to 65 Trailer
8202 Chi er, Brush Chi in Ca acit 161n to 100 Trailer
8203 Chi er, Brush Chi in Ca acit 181n to 125 Trailer
8204 Chipper, Brush Chi in Ca acit 181n to 200 Traile
8205 Chipper, Brush Chi in Ca lacit{ 191n to 300 Traile
8206 Chipper, Brush Chippina Capacit{ 191n to 450 Traile
8207 Chipper, Brush to 650 Traile
BuckEl
8210 Clamshell & OraÇJline to 100 rate.
Bucke
8211 Clamshell & OraÇJline to 155 rate.
Bucke
8212 Clamshell & Oraaline to 235 rate.
Bucke
8213 Clamshell & Oraaline to 350 rate.
Bucke
8214 Clamshell & OraÇJline to 530 rate.
Bucke
8215 Clamshell & Oraaline to 800 rate.
8712 Cleaner, Sewer/Catch Basin HODDer CaDaGitv 5CY Truck
8713 Cleaner, Sewer/Catch Basin HODDer CaDaGitv 14CY Truck
8220 Com actor to 10
8221 Com actor to 45
8222 Com actor to 75
8223 Com actor to 95
8224 Com actor to 150
8225 Com actor to 235
8226 Com actor to 335
Federal Emergency Management A(lency 28 August 2005
Mo
Mo
Mo
Mo
r Mo
r Mo
r Mo
r Mo
t no
hour $46.50
hour $5400
unted. hour $3.10
unted. hour $8.55
hour $160.00
hour $182.00
hour $226.00
hour $270.00
'{. hour $0.85
hour $1445
ith 360 degree
hour $27.00
hour $204.00
hour $339.00
hour $480.00
hour $693.00
hour $31.00
hour $48.00
hour $63.00
hour $140.00
hour $207.00
hour $0.70
hour $29.50
hour $39.50
hour $52.00
hour $9.35
hour $13.95
hour $18.80
hour $6.10
hour $7.60
leth. hour $4.10
leth. hour $7.25
!eth. hour $12.00
leth. hour $1640
hour $3.30
hour $6.95
hour $11.55
hour $13.50
hour $14.75
hour $2230
hour $30.50
hour $1.55
hour $3.10
hour $1.65
unted. hour $12.80
unted. hour $17.70
unted. hour $23.00
unted. hour $29.00
unted. hour $42.50
unted. hour $59.00
unted. hour $86.00
unted. hour $130.00
t included in
hour $71.00
t included in
hour $95.00
t included in
hour $131.00
t included in
hour $178.00
t included in
hour $250.00
t included in
hour $343.00
nted. hour $18.80
nted. hour $23.30
hour $8.70
hour $15.30
hour $22.70
hour $28.00
hour $43.50
hour $73.00
hour $119.00
d
Mo
Mo
ull.
ull.
ull.
ull.
{ dut
ard.
dw
es te
es te
es te
es te
t no
t no
t no
t no
t no
Mou
Mou
Page 2 of 7
,
I
I
FENlA's Schedule of Equipment Rates
8227 Compactor to 535
8228 Compactor, towed to 15
8229 Compactor, towed to 50
8230 Compactor, towed to 100
8500 Crane Max. Lift Ca acitv 8 MT to 80
8501 Crane Max. Lift Ca acit 15 MT to 150
8502 Crane Max. Lift Ca acit 27 MT to 200
8503 Crane Max. Lift Ca acit 45 MT to 300
8504 Crane Max. Lift Capacit 70 MT to 350
8505 Crane Max. Lift Capacity 110 MT to 450
8496 Crane, Truck Mntd Max. Lift Capacity 17600 Lbs
8497 Crane, Truck Mntd Max. Lift Capacity 33000 Lbs
8498 Crane, Truck Mntd Max. Lift Capacity 60000 Lbs
8499 Crane, Truck Mntd Max. Lift Capacity 120000 Lbs
8195 Cutter, Brush Cutter Size 8 ft to 150
8196 Cutter, Brush Cutter Size 8 ft to 190
8197 Cutter, Brush Cutter Size 10ft to 245
Inclucl
8670 Derrick, Hvdraulic Diaaer Max. Boom Lenath 55 Ft alianr
Inclucl
8671 Derrick, Hvdraulic Diaqer Max. Boom Lenath 75 Ft alianr
Inclucl
8672 Derrick, Hvdraulic Diqqer Max. Boom Lenqth 95 Ft aliqnr
Truck
burne
8580 Distributor, Asphalt Tank Capacil'i..... 500 Gal and ci
Truck
burne
8581 Distributor, Asphalt Tank Caoacit'( 1000 Gal and ci
Truck
burne
8582 Distributor, Asphalt Tank Capacil'{ 4000 Gal and ci
8250 Dozer, Crawler to 65
8251 Dozer, Crawler to 105
8252 Dozer, Crawler to 160
8253 Dozer, Crawler to 245
8254 Dozer, Crawler to 375
8255 Dozer, Crawler to 565
8256 Dozer, Crawler to 850
8260 Dozer, Wheel to 260
8261 Dozer, Wheel to 335
8262 Dozer, Wheel to 445
8263 Dozer, Wheel to 615
Crawl
8280 Excavator, Hvdraulic Bucket CaoaGity 0.5 CY to 45 Includ
Crawl
8281 Excavator, Hvdraulic Bucket CapaGitv 1.0 CY to 90 Inclucl
Crawl
8282 Excavator, Hydraulic Bucket CapaGity 1.5 CY to 160 Inclucl
Crawl
8283 Excavator, Hydraulic Bucket CapaGity 2.5 CY to 265 Inclucl
Crawl
8284 Excavator, Hvdraulic Bucket CapaGitv 4.5 CY to 420 Includ
Crawl
8285 Excavator, Hvdraulic Bucket CapaGitv 7.5 CY to 650 Includ
Crawl
8286 Excavator, Hvdraulic Bucket CapaGitv 12 CY to 1000 Includ
8240 Feeder, Grizzlv to 35
8241 Feeder, Grizzly to 55
8242 Feeder, Grizzlv to 75
8300 Fork Lift Capacity 6000 Lbs to 60
8301 Fork Lift Capacity 12000 Lbs to 90
8302 Fork Lift Capacity 18000 Lbs to 140
8303 Fork Lift Capacity 50000 Lbs to 215
8310 Generator Prime Output 5.5 KW to 10
8311 Generator Prime Output 16 KW to 25
8312 Generator Prime Output 43KW to 65
8313 Generator Prime Output 85KW to 125
8314 Generator Prime Output 140 KW to 200
8315 Generator Prime Output 210 KW to 300
8316 Generator Prime Output 280 KW to 400
8317 Generator Prime Output 350 KW to 500
Federal Emergency Management A\jency 28 August 2005
hour $234.00
hour $15.00
hour $39.00
hour $65.00
hour $30.50
hour $44.00
hour $66.00
hour $98.00
hour $143.00
hour $208.00
hour $22.50
hour $34.00
hour $55.00
hour $98.00
$76.00
$86.00
$96.00
ydraulic pole
attachment. hour $32.50
ydraulic pole
attachment. hour $34.50
ydraulic pole
attachment. hour $36.50
inted. Includes
sulated tank,
Itinq spray bar. hour $10.50
Inted. Includes
sulated tank,
Itinq spray bar. hour $15.60
Inted. Includes
sulated tank,
Itina spray bar. hour $19.10
hour $31.00
hour $40.00
hour $55.00
hour $79.00
hour $124.00
hour $200.00
hour $34400
hour $55.00
hour $68.00
hour $86.00
hour $126.00
ruck & Wheel.
ucket. hour $21.90
ruck & Wheel.
ucket. hour $37.50
ruck & Wheel.
ucket. hour $64.00
ruck & Wheel.
ucket. hour $104.00
ruck & Wheel.
ucket. hour $163.00
ruck & Wheel.
ucket. hour $255.00
ruck & Wheel.
ucket. hour $404.00
hour $19.20
hour $29.00
hour $45.50
hour $9.90
hour $14.45
hour $2390
hour $42.50
hour $3.60
hour $8.45
hour $18.10
hour $28.50
hour $40.50
hour $59.00
hour $76.00
hour $94.00
es h
nent
es h
nent
es h
nent
Mou
rs, in
rculé
Mou
rs, in
rculé
Mou
rs, in
rculé
er, T
es b
er, T
es b
er, T
es b
er, T
es b
er, T
es b
er, T
es b
er, T
es b
Page 3 of 7
,
,
I
FENlA's Schedule of Equipment Rates
8318 Generator Prime Out ut 530 KW to 7501
8319 Generator Prime Out ut 710 KW to 1000
8320 Generator Prime Out ut 1100KW to 1500
8321 Generator Prime Out ut 1500 KW to 2000
8322 Generator Prime Out ut 1900 KW to 2500
8323 Generator Prime Out ut 2400 KW to 3000
8755 Golf Cart Caoacitv 2oerson
Inclucl
8330 Graders Moldboard Si;~e 8 Ft to 50 Articul
Inclucl
8331 Graders Moldboard Si;~e 10 Ft to 100 Articul
Inclucl
8332 Graders Moldboard Size 12 Ft to 150 Articul
Inclucl
8333 Graders Moldboard Si:~e 14 Ft to 225 Articul
Per 2
8350 Hose, Discharae Diameter 31n Inclucl
Per 2
8351 Hose, Discharae Diameter 41n Inclucl
Per 2
8352 Hose, Discharae Diameter 61n Inclucl
Per 2
8353 Hose, Discharqe Diameter 81n Inclucl
Per 2
8354 Hose, Discharae Diameter 12 In Inclucl
Per 2
8355 Hose, Discharqe Diameter 16 In Inclucl
Per 2
8356 Hose, Suction Diameter 31n Inclucl
Per 2
8357 Hose, Suction Diameter 41n Includ
Per 2
8358 Hose, Suction Diameter 61n Includ
Per 2
8359 Hose, Suction Diameter 8 In Includ
Per 2
8360 Hose, Suction Diameter 12 In Includ
Per 2
8361 Hose, Suction Diameter 16 In Includ
8517 Jackhammer (Dry) Weiqht Class 25-45 Lbs
8518 Jackhammer (Wet) Weiqht Class 30-55 Lbs
8380 Loader, Crawler Bucket Capacity 0,5 CY to 32 Includ
8381 Loader, Crawler Bucket Capacity 1 CY to 60 Includ
8382 Loader, Crawler Bucket CapaGitv 2 CY to 118 Includ
8383 Loader, Crawler Bucket CapaGitv 3CY to 178 Includ
8384 Loader, Crawler Bucket CaoaGitv 4CY to 238 Includ
8385 Loader, Crawler Bucket Caoacitv 5CY to 300 Includ
8540 Loader, Skid-Steer Ooeratin Ca acitv 1000 Lbs to 35
8541 Loader, Skid-Steer Ooeratin Ca acitv 2000 Lbs to 65
8542 Loader, Skid-Steer Operatin Ca acitv 3000 Lbs to 85
8543 Loader, Skid-Steer Operatin Ca acitv 4000 Lbs to 94
8401 Loader, Tractor, Wheel to 81
8390 Loader, Wheel Bucket Capacity 0.5 CY to 38
8391 Loader, Wheel Bucket CapaGitv 1 CY to 60
8392 Loader, Wheel Bucket CapaGitv 2CY to 105
8393 Loader, Wheel Bucket CapaGitv 3CY to 152
8394 Loader, Wheel Bucket CapaGitv 4CY to 200
8395 Loader, Wheel Bucket CapaGitv 5CY to 250
8396 Loader, Wheel Bucket Capacity 6CY to 305
8397 Loader, Wheel Bucket Ca aGitv 7CY to 360
8398 Loader, Wheel Bucket Ca aGitv 8CY to 415
8399 Loader, Wheel Bucket Ca acitv 9CY to 470
8400 Loader, Wheel Bucket Ca acitv 10CY to 530
Load
8570 Loader-Backhoe, Wheel Loader Bucket Capacit~ 0.5 CY to 40 Buck
Load
8571 Loader-Backhoe, Wheel Loader Bucket Capaci~ 1 CY to 70 Buck
Load
8572 Loader-Backhoe, Whee Loader Bucket Capacit~ 1.5CY to 95 Buck
Load
8573 Loader-Backhoe, Wheel Loader Bucket Caoacit~ 1.75 CY -~ Buck
Federal Emergency Management Agency 28 August 2005
hour $137.00
hour $179,00
hour $274,00
hour $369,00
hour $457,00
hour $547,00
hour $2,55
igid and
enuinment. hour $23.90
igid and
eauioment. hour $32,00
igid and
enuinment. hour $43,00
igid and
enuioment. hour $60,00
t length.
ouolinas, hour $0,15
t length.
ouolinas. hour $0,20
t length.
ouolinas. hour $0,35
t length.
ounlinns. hour $0.55
t length.
auolinas. hour $1.15
t length.
ouplinas. hour $1,90
t length.
ouolinas. hour $0,20
t length.
ouplinas. hour $0.30
t length.
ounllnns. hour $0,50
t length.
ouolinas. hour $0,85
t length.
ouolinas. hour $1,80
t length.
ouolinas. hour $3,20
hour $1,10
hour $1.20
ucket. hour $13,90
ucket. hour $23,50
ucket. hour $46,50
ucket. hour $73,00
ucket. hour $101,00
ucket. hour $135.00
hour $12,50
hour $1740
hour $20.10
hour $21,00
hour $17,80
hour $13.25
hour $17,10
hour $25,50
hour $34,00
hour $43,50
hour $53,00
hour $65,00
hour $79,00
hour $92,00
hour $105.00
hour $122,00
d Backhoe
Icluded. hour $12.25
d Backhoe
Icluded. hour $19,70
d Backhoe
Icluded. hour $28.50
d Backhoe
Icluded, hour $36,50
es R
ate
es R
ate
es R
ate
es R
ate
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
5 foo
es c
es b
es b
es b
es b
es b
es b
er an
ets ir
er an
ets ir
er an
ets ir
er an
ets ir
Page 4 of 7
, 8410 Mixer, Concrete Portable Batchin Ca acitv
8411 Mixer, Concrete Portable Batchin Ca acitv
8412 Mixer, Concrete, Trailer Mntd Batchin Ca acitv
8413 Mixer, Concrete, Trailer Mntd Batchin Ca acitv
8075 Motorcvcle, Police
8633 Mulcher, Trailer Mntd Workina Capacity
8634 Mulcher, Trailer Mntd Workina Capacity
8635 Mulcher, Trailer Mntd Workinq Capacitv
8430 Paver, Asphalt
8431 Paver, Asphalt
I
I
8432 Paver, Asphalt
8433 Paver, Asphalt
8434 Paver, Asphalt
8436 Pick-u ,As halt
8437 Pick-u ,As halt
8438 Pick-u ,As halt
8439 Pick-u ,As halt
8660 Plow, Cable
8661 Plow, Cable
8662 Plow, Cable
8450 Plow, Grader Mntd
8451 Plow, Grader Mntd
8452 Plow, Truck Mntd
8453 Plow, Truck Mntd
8470 Pump
8471 Pum
8472 Pum
8473 Pum
8474 Pum
8475 Pum
8476 Pump
8477 Pump
8478 Pump
8479 Pump
8463 Pump Extender
8460 Pump, W/O Power
8461 Pump, W/O Power
8462 Pump, W/O Power
8510 Saw, Concrete
8511 Saw, Concrete
8512 Saw, Concrete
8513 Saw, Rock
8514 Saw, Rock
8515 Saw, Rock
8520 Scraper
8521 Scraper
8522 Scraper
8523 Scraper
8524 Scraper
8560 Snow Blower
8561 Snow Blower
8562 Snow Blower
8550 Snow Blower, Truck Mnld
8551 Snow Blower, Truck Mnld
8552 Snow Blower, Truck Mnld
8553 Snow Blower, Truck Mnld
8558 Snow Thrower, Walk Behind
8559 Snow Thrower, Walk Behind
8630 Sprayer, Seed
8631 Sprayer, Seed
8632 Sprayer, Seed
8458 Spreader, Chemical
8423 Spreader, Chip
8424 Spreader, Chip
8425 Spreader, Chip, Mntd
8455 Spreader, Sand
8456 Spreader, Sand
8457 Spreader, Sand
Federal Emergency Management Agency
FENlA's Schedule of Equipment Raltes
10 Cft
16 Cft
11 Cft to 10
16 Cft to 25
7TPH to 35
10TPH to 55
20 TPH to 120
hour $2,90
hour $4.25
hour $9,35
hour $14,70
mile $0.40
hour $10,10
hour $15,00
hour $22,60
heel and
uioment. hour $41,50
'heel and
uioment. hour $63,00
'heel and
uioment. hour $97,00
'heel and
uioment. hour $125,00
'heel and
uioment. hour $151,00
hour $57,00
hour $82,00
hour $103,00
hour $145,00
hour $9,50
hour $19,30
hour $30,50
hour $18,60
hour $25,00
hour $14,05
ina wina, hour $20.40
included, hour $2,70
included, hour $3,70
included, hour $5,05
included, hour $6,00
included, hour $8,60
included, hour $11.25
included, hour $16,70
included, hour $24,60
included, hour $26,50
included, hour $31,50
hour $1,25
hour $2,30
hour $3,00
hour $7,15
hour $5,35
hour $12,60
hour $22,10
hour $29,00
hour $38,00
hour $52,00
hour $83,00
hour $109,00
hour $143,00
hour $173,00
hour $208,00
hour $140,00
hour $157,00
hour $180,00
hour $38,50
hour $60,00
hour $90,00
hour $12800
hour $12,80
hour $16,30
ruck mounted, hour $10,70
ruck mounted, hour $13.45
ruck mounted, hour $22.40
ruck mounted, hour $4,10
hour $50,00
hour $66,00
ruck mounted, hour $3,65
hour $4,05
hour $5,65
hour $7,90
Plow Depth
Plow Deoth
Plow Deoth
Width
Width
Width
Width
Includes w
to 50 crawler eq
Inclucles'lv
to 75 crawler eq
Inclucles'lv
to 125 crawler eq
Inclucles'lv
10 175 crawll~r eq
Includes 'Iv
10 250 craw"~r eq
10110
10 150
10200
10275
to 30
to 65
10110
18 in
36 in
48 in
10 10 Ft
to 14 Ft
to 15 Ft
to 15 Ft With !Ievel
to 3 Hoses not
to 6 Hoses not
to 10 Hoses not
to 15 Hoses not
to 25 Hoses not
to 40 Hoses not
to 60 Hoses not
to 95 Hoses not
to 140 Hoses not
10 200 Hoses not
Lenath 20 Ft
Pumo Size 6 In
Pump Size 121n
Pumo Size 241n
Blade Diameter 14 In to 14
Blade Diameter 261n to 35
Blade Diameter 481n to 65
to 65
to 90
to 120
Scraper Capacitv 11 CY to 175
Scraper Capacity 16 CY to 250
Scraper Capacity 23 CY to 365
Scraper Capacity 34 CY to 475
Scraper Capacity 44CY to 600
Capacity 2,000 Tph to 400
Ca acit 2,500 Toh to 500
Ca acit 3,500 Toh to 600
Ca acit 600 Toh to 75
Ca acit 1100 Tph to 150
Ca acit 1600 Tph to 250
Capacity 2500 Tph to 400
CullinQ Width 25 in to 5
CuttinQ Width 60 in to 15
Workinq Capacity 750 Gal to 30 Traile r & t
Workinq Capacity 1250 Gal to 50 Traile r & t
Workinq Capacity 3500 Gal to 115 Traile r & t
Capacity 5CY to 4 Traile r & t
Spread Hopper Width 12,5 Ft 10 152
Spread HoDDer Width 16,5 Ft to 215
Hopper Size 8 Ft to 8 Traile r&t
Mountinq Tailaate, Chassis
Mountinq Dump Bodv
Mountinq Truck (1 Ovd)
28 August 2005 Page 5 of 7
,
,
I
FENlA's Schedule of Equipment Raltes
8440 Striper Paint Caoacif{ 40 Gal to 22
8441 Striper Paint CapacitL 90 Gal to 60
8442 Striper Paint CapacitL 120 Gal to 122
8445 Striper, Truck Mntd Paint CaoaciN 120 Gal to 460
8446 Striper, Walk-behind Paint CaoacitL 12 Gal
8157 Sweeper, Pavement to 110
8158 Sweeper, Pavement to 150
8159 Sweeoer, Pavement to 200
Does
8590 Trailer, Dump Capacity 20 CY Move
Does
8591 Trailer, Dumo Caoacitv 30 CY Move
Does
8592 Trailer, Dum Ca acity 40 CY Move
8600 Trailer, E ui ment Ca acit 30 Tons
8601 Trailer, E ui ment Ca acit 40 Tons
8602 Trailer, E ui ment Ca acit 60 Tons
8603 Trailer, E ui ment Ca acit 120 Tons
8640 Trailer, Office Trailer Size 8' x 24'
8641 Trailer, Office Trailer Size 8' x 32'
8642 Trailer, Office Trailer Size 10' x 32'
Includ
pump
8610 Trailer, Water Tank Caoacitv 4000 Gal rear so
Includ
pump
8611 Trailer, Water Tank Capacit~ 6000 Gal rear so
Includ
pump
8612 Trailer, Water Tank Capacit~ 10000 Gal rear so
Incluej
pump
8613 Trailer, Water Tank Caoacitv 14000 Gal rear so
Walk-
Whee
8650 Trencher to 35 and ~
Walk-
Whee
8651 Trencher to 85 and ~
Walk-
Whee
8652 Trencher to 115 and \
Walk-
Whee
8653 Trencher to 175 and \
8290 Trowel, Concrete Diameter 90 In to 25
8291 Trowel, Concrete Diameter 100 In to 38
iAdd F
8810 Truck, Bucket Truck
IAdd 10
8811 Truck, Cleanina SewEl
8680 Truck, Concrete Mixer Mixer Capacity 10 CY to 255
8681 Truck, Concrete Mixer Mixer Caoacity 13 CY to 300
8720 Truck, Dum Struck Ca aGity 8CY to 210
8721 Truck, Dum Struck Ca acity 10CY to 235
8722 Truck, Dum Struck Ca acitv 12 CY to 255
8723 Truck, Dum Struck Ca aGitv 18CY to 330
8724 Truck, Dum Struck Ca acity 28 CY to 400
8725 Truck, Dum Struck Capacitv 40 CY to 460
8726 Truck, Dum Struck Capacity 50 CY to 620
8690 Truck, Fire Pump Capacity 1000 GPM
8691 Truck, Fire Pump Capacity 1250 GPM
8692 Truck, Fire Pump Capacity 1500 GPM
8693 Truck, Fire Pump Capacity 2000 GPM
8700 Truck, Flatbed Maximum Gvw 15000 Lbs to 150
8701 Truck, Flatbed Maximum Gvw 25000 Lbs to 180
8702 Truck, Flatbed Maximum Gvw 30000 Lbs to 215
8703 Truck, Flatbed Maximum Gvw 45000 Lbs to 250
8704 Truck, Flatbed Maximum Gvw 50000 Lbs to 300
8705 Truck, Flatbed to 375
8706 Truck, Flatbed to 450
8730 Truck, Garbaae Capacity 25 CY L~
Federal Emergency Management Agency 28 August 2005
not
r
not
r,
not
r,
hour $12,90
hour $19,10
hour $38,00
hour $69,00
hour $3.25
hour $47,00
hour $56,00
hour $62,00
include Prime
hour $17.40
include Prime
hour $26,00
include Prime
hour $35,00
hour $9,90
hour $11.45
hour $13,70
$18,30
hour $1,60
hour $1,90
hour $2,30
centrifugal
sump and a
bar, hour $10,65
centrifugal
sump and a
bar. hour $12.40
centrifugal
sump and a
bar. hour $15.40
centrifugal
sump and a
bar. hour $18,70
ind, Crawler &
unted, Chain
'I. hour $14,70
ind, Crawler &
unted, Chain
d, hour $32,50
ind, Crawler &
unted, Chain
,I. hour $41,50
ind, Crawler &
unted, Chain
d, hour $61,00
hour $11,70
hour $17,90
ed Truck to
unted Aerial
eel Truck to
,aner.
hour $70,00
hour $81,00
hour $25,50
hour $28,00
hour $31,00
hour $46,50
hour $77.00
hour $85,00
hour $108,00
hour $53,00
hour $56,00
hour $71,00
hour $77.00
hour $16.40
hour $20,20
hour $26,50
hour $29,50
hour $38,00
hour $46,00
hour $53,00
hour $41,50
es a
with
!Q@Y
es a
with
!Q@Y
es a
with
!Q@Y
es a
with
!Q@Y
beh
I Mo
Vhee
beh
I Mo
Vhee
beh
I Mo
Vhee
beh
I Mo
IIJhee
::"fãffii
Mo
::"fãffii
r Cle
Page 6 of 7
,
,
I
FENlA's Schedule of Equipment Rates
8731 Truck, Garbaqe Capacity 32 CY to 325
Add F
8812 Truck, Knuckle Boom Truck
Add F'
8813 Truck, Ladder Truck
Add F'
8814 Truck, Line Hvdra
When
8800 Truck, Picku to 130 peopl
8801 Truck, Picku to 130
8802 Truck, Picku to 180
8803 Truck, Picku to 230
8804 Truck, Picku to 280
8790 Truck, Tractor to 210
8791 Truck, Tractor to 265
8792 Truck, Tractor to 310
8793 Truck, Tractor to 350
Inclucl
8780 Truck, Water Tank Capacitv 2500 Gal to 175 spray
Inclucl
8781 Truck, Water Tank Capacitv 4000 Gal to 250 spray
8620 Tub Grinder to 400
8621 Tub Grinder to 500
8622 Tub Grinder to 600
8623 Tub Grinder to 700
8624 Tub Grinder to 800
8625 Tub Grinder to 900
8626 Tub Grinder to 1000
8753 Vehicle, Recreational to 10
8750 Vehicle, Small to 30
8760 Vibrator, Concrete to 4
8761 Vibrator, Concrete to 8
Inclucl
8770 Welder, Portable to 16 and Ie
Inclucl
8771 Welder, Portable to 34 and Ie
Inclucl
8772 Welder, Portable to 50 and Ie
Inclucl
8773 Welder, Portable to 80 and Ie
Federal Emergency Management Allency 28 August 2005
hour $50,00
ld Truck to
:nted Crane,
ld Truck to
:nted Aerial
ld Truck to
Jiqqer Derrick,
sporting
mile $0,45
hour $9,75
hour $13,35
hour $16,50
hour $19,90
hour $29,50
hour $36,50
hour $42,00
hour $44,50
mp and rear
3m. hour $27,50
mp and rear
3m. hour $39,00
hour $78,00
hour $97,00
hour $110,00
hour $125,00
hour $144,00
hour $156,00
hour $170,00
hour $2,75
hour $5,25
hour $1,00
hour $2,75
round cable
able, hour $4,90
round cable
able, hour $10,25
round cable
able, hour $14,75
round cable
able, hour $21,60
latbe
Mou
latbe
Mou
latbe
ulic I
tran
e,
e pu
Systl
e pu
SYStl
es 9
ad c
es 9
ad c
es 9
ad c
es 9
ad c
Page 7 of 7